Loading…
Loading…
5,241 results • Latest
Repairing of cabin door, glass , seat, Celling, Head light, Parking indicator, Bumper, Back light and Spring leaf of Hywa no. JH10AJ 2691 at Madhuban Coal washery under Block-II Area, BCCL
COMPLETE OVERHAULING OF 02 N0S REAR SUSPENSION PART NO-4688680 AND O4 NOS DIFFERENTIAL EYE OF DUMPER MODEL CAT 773 E SL NO 880 DEPLOYED AT AMP COLLIERY BARORA AREA
Maintenanace , Repair and changing of inclined belts discharge chutes feeding chutes along with supporting members of Preparation Plant at Bhojudih Coal Washery.
Preventive maintenance and repair of Raw Coal feeding Conveyor to inclined belt at Bhojudih Coal Washery.
Preventive maintenance / strengthening of township water supply pumps structure base, connecting pipelines and relevant structure at Bhojudih Coal Washery.
Repairing and Maintenance of tension unit structure and supporting structure of Raw Coal conveyor No 2 at Bhojudih Coal Washery.
Hoisting of both drum pontoon of main patch sump along with their 3000GPM pump motor set for 02times due to continuous increase of water level of the sump and necessary maintenance of both the pump and their pipe line under AMP Colliery.
Bearing changing, belt coupling changing, gaskit changing and greasing and packing of two 4000GPM pump installed at Jarlahi Patch under Phularitand AMP Colliery
Extension of 220V O/H line from Main Patch to Jarlahi for lighting purpose to ensure safety of equipment as well as workmen under Phularitand, AMP Colliery, Barora Area.
(A) Dismantling of 3.3KV O/H line due to advancement of Mines at 7A-Patch and (B) Diversion of 3.3KV O/H Line from 7-A Patch via Haul Road to Main Patch due to advancement of Mines at 7-A Patch at Phularitand AMP Colliery under Barora Area.
Shifting of 02Nos. of HT 2000GPM Pump Motor set in the lower/safe side of the sump No.-01 and sump No.-02 due to decreasing of water level at old ghutway patch-3 along with erection of its 8inch dia M.S. Pipe line at Damoda Colliery.
Maintenance of 11nos. chemical earthpit through repairing, overhauling and filling required chemical materials in weighbridge and repairing of weighbridge light at Damoda Colliery.
Erection of a separate 3.3KV O/H line from F.A.W. substation to N.D. Patch for the purpose of providing uninterrupted power supply in the mine at Damoda Colliery under Barora Area.
Repairing and maintenance of 11KV O/H Line due to smooth power supply of Minop UG mine Under Muraidih AMP Colliery, Barora Area.
Electrical house wiring of quarter no. D/07 situated near Nehru Balika Vidyalaya Tetulmari situated to Sri Dhiraj Kumar Sinha Sr. Manager(Mining)Project officer Kankanee Colliery
INDICATING, LAMPS, GLV, ELEC, HND,RBR,18IN, BRUSH, CRBN, HOLDER, CRBN, BRSH, CRIMPER, HND,10-185MM2, GRINDER, STRAIGHT,650W, COMPOUND, 3.3KV By MOR,CLD FLNG, TAPE, ADHSV, 25MM, CABLE 1.5 SQ MM, PVC COPPER, FLEXIBLE, HOSE, PVC, 4 Inch
For Repair and Preventive Maintenance of 550V,440V and 220V Overhead lines at ASBNC/SBC under Sijua Area
DISMANTLING OF OFFICE BUILDING OF V.WEST COLLIERY UNDER C.V.AREA
Upgradation of dispensary at laikdih under c v area.
REPAIRING AND MAINTENANCE OF CANTEEN AT CISF BARRAK LAIKDIH UNDER CV AREA
Repairing of pins 05 Nos. (FLOAT) for Arm, Bucket, link and H-Link attachments for BEML Make BE-1000 Shovels at Dahibari OCP, CV Area.
Repairing of 08 Nos. track rollers for BEML MAKE BE-1000 Shovel SI. No.G10231 at Dahibari OCP, CV Area.
Cleaning of Drain, Dustbin at Hospital Colony and Nehru chowk Colony under Barora Area
Repair, Maintenance of Septic Tank (10 Nos.) and drain of different colonies of DOCP under C.V. Area
Repairing of LHS crack track frame portion, twisted idler fitting, area, track roller foundation, track chain master pin, roller guard stating of IDM30 Drill SI. No. DR-165 at Dahibari OCP, CV Area.
Repairing of bucket cylinder piston rod eye hole -01 No. and 02 Nos. new making and fitting of retainer rings for BEML Make BE-1000-1 Shovel SI. No.G10224 at Dahibari OCP, CV Area.
Repairing of driving sprocket wheels 02 Nos. for BEML Make BE-1000-1 Shovel SI. No.G10227 at Dahibari OCP, CV Area.
hose pt.no. 4244501, hose pt.no.4395604, hose pt.no. 4441426, hose pt.no.4441543, hose pt.no.4441431, hose pt.no. 4439777, hose pt.no.4440415, hose pt.no.4472299
Mosquito Control & Insecticide/Pest Control Treatment
For Electrical wiring of Awadesh Kumar Mishra P.No.61361377 Qtr No.K/AR556 at Kankanee Mukarjee Dhaura (2)Naveen Kumar Verma P.No.61396720 Qtr No.K/AR320 at Sendra Colony of Kankanee Colliery under Sijua Area
Repairing of damaged and failed grease cylinder-02 Nos. of Dozer SI. No.TR-487at Dahibari OCP, CV Area.
AUXILIARY CONTACTOR 2NO+2NC, LED INDICATING LAMPS 110V AC/DC, PUSH BUTTON INDICATING SWITCH, SWITCH SELECTOR;VS35;3.3KV, 400A, VLTM TR, MASTER TRIP RELAY (MER5530)
Maintenance of Hanuman Mandir at New Qtr. Of Bhowra Under E.J Area.
Repair and Maintenance of Chabootra at New Colony 35 No. Bhowra under E.J Area
Cleaning and Repairing of drain at 35 No. New Staff Colony of Bhowra under E.J Area
Repair and Maintenance of Sri Nath Koiri Bhowra 19 No. under E.J. Area
CONSTRUCTION OF PARK AT LAIKDIHUNDER CV AREA UNDER TMCP AND DEVELOPMENT
Upgradation of Filter Plant at Laikdih under CV Area.
Renovation of Finance Department at Area Office under CV Area
Cleaning of jungle at Regional Store, RRWS, Magzine and Lal banglow under Block-II Area
Refilling and servicing of used/ expired empty fire extinguisher of ABOCP Mine Block-II Area.
REPAIRING AND RENOVATION WORK OF BUILDINGS FOR SHIFTING OF PANCHAYAT BHAWAN FROM BASANTIMATA VIEW POINT TO NEAR TRIPAL STORY BUILDING UNDER CV AREA
Dismantling and erection of conductor of 11kv GT-1 O/H line beside RK camp under Ena colliery, Kusunda Area
Township maintenance of 440V O/H line of Sahana workers colony by replacement of damaged poles and conductor and other miscellaneous electrical works for safe and uninterrupted operation of domestic power supply at Phularitand, AMP Colliery.
LT, overhead line, 440V maintenance at Ena colliery, Kusunda Area.
Maintenance of LT overhead line of 3 No CISF camp substation of Muraidih Colony AMP Colliery of Barora Area.
Shifting and installation of MN-6 pump motor set of Madhuban Incline in upper and safe side of the Incline 04times due to continuously water level increasing at Phularitand, AMP Colliery, Barora Area.