Loading…
Loading…
880 results • Latest
Removal of silt at Vulnerable reaches of NMBC 42.00 Km to 55.00 Km, Shimsa Right Bank Canal & Left Bank Canal, its Distributaries, Minors, Pickups Canal
Removal of silt at vulnerable reaches of 23rd pickup canal ,23rd dy, 20th dy & Keelara pickup channel and Alkere pickup channel under NMBC.
Removal of silt and jungle of selected reaches from ch. 0.00km to 15.00km of flow canal and RBC & LBC of LIS D Point of IBP
Dismantling and removal of collapsed cover duct debris from MRBC, providing painting to dam parapet, gates & structural rectification to the gear boxes of spillway gates of Manchanabele Dam
Removal of silt & Jungle in Vulnerable reaches of RBC,LBC,LBLC and RBLC under Arkavathy reservoir project.
Providing Protective works and box drain in Kachena Hally , Tyavada Hally branch at selected reaches in 20th mile dy of VC
Construction of box drain and providing protective works at the selected reaches of 37th, 39th and 41st DPO Canals under CDS Main Canal in the village limit of Kyathanahally.
Providing Protective works and Providing Box drain in 19th mile Dy 22nd A and B and 23rd mile DY at selected reaches of V.C.
Construction of box drain and protective works to DPO Canals of LBLL Canal near Haravu Village and branches of LBLL Canal under VC
Providing protective works, Box drain in2nd 3rd ,17th PO Canal and Providing protective works in 24th dy at selected reaches under VC and Construction ofBox drain and protective works to 105th PO canal under CDS main canal in Pattasomanahally village.
Providing Protective works and box drain in Pattasomana Hally branch canal at selected reaches under 20 th mile dy of VC
Providing Outsourcing manpower for Iggaluru Barrage sub division office, flow canal and jeep driver of IBP for the year 2026-27
Providing out sourcing Man power for Manchanabele dam, MP sub division office, Manchanabele Project division office and Drivers to office vehicles of Executive Engineer, MP Division, Assistant Executive Engineers No1 MP sub division for the year 2026-27
Supplying of computer operator and driver manpower for the maintainance of HCI Division office
Supply of manpower for the maintainance of HCI colony under jurisdiction of No 3 HCI subdivision hebburu for the year 2026 27
Supply of computer operator and manpower for the maintainance of HCI subdivision Hebburu for the year 2026-27
Supply of Computer operator, Driver, attender,watchman, for maintenance of No-14 H.C Sub Division Under jurisdiction of No,14 H.C Sub Division, Kunigal for the year 2026-27
Supplying of Computer operator, Driver, Attender and Watchman for the Office of Assistant Executive Engineer, No.10, HC Sub-Division, Nagavalli and escape or the year 2026-27
Supplying manpower for colony maintenance and office of No 6 HCD subdivision Nagavalli for the year 2026 27
Providing and Fixing Commemorative Memorial Stone at Krs Brindavan garden
Removal of Silt and Jungle in Remaining selected reaches of MRBC and MLBC and Old Akkihebbal canal
Removal of silt and jungle in selected reaches of minors coming under D-47 HLBC
Removal of silt and jungle in selected reaches of D-47 coming under HLBC
Removal of silt and jungle in selected reaches of D-48, D-49 coming under HLBC for the year 2026-27
Removal of Silt And Jungle in selected Reaches of Rayarane pickup canal and Hosaholalu High Level Canal Coming under HLBC.
Removal of Silt and Jungle in Selected Reaches of Dy-64 and Minors Coming Under HLBC.
Removal of silt and jungle in Tanks No.10 HLBC Sub division Kikkeri coming under HLBC for the year 2026-27
Removal of silt and jungle in Balanced reaches of D-54 Minors coming under HLBC for the year 2026-27
Removal of silt and jungle in selected reaches of D-50, D-51 and D-52 coming under HLBC for the year 2026-27
Removal of Silt and Jungle in Selected Reaches of D-60, 61, 62, 63 and its Minors Coming Under HLBC.
Removal of Silt and Jungle in selected Reaches of Doddankatte Pickup Anecut Canal And B.Bachahalli High Level Canal Coming Under HLBC.
Removal of silt and jungle in selected reaches of D-53 and minors of D-53 coming under HLBC
Removal of silt and jungle from ch 0.00m to 15300.00m of LBC of ABLIS(excluding deep cut portion). 2)Removal of silt and jungle in Deep cut portion of LBC in km No 2, 5, 8, 9, & 10 of LBC of ABLIS. 3)Removal of silt from ch 0.00m to 5500.00m of RBC of ABLIS and Removal of silt from ch 0.00m to 5000m of Dy 3 of LBC of ABLIS for the year 2026-27.
Removal of silt and jungle from ch 0.00 Km to 7.50 Km of Dy.No.40, Dy No-41 from ch 0.00 Km to 8.80 Km & Its Minors of HRBHLC for the year 2026-27.
Removal of silt and jungle from ch 0.00 Km to14.00 Km of Dy.No.39 R/B, Dy No-39L/B from ch 0.00 Km to 7.00 Km , 39A & its Minors of HRBHLC for the year 2026-27.
Removal of silt and jungle of Dy No. 30 to 37 & Its Minors of HRBHLC and Removal of silt and jungle from ch 0.to 6.00 Km of Dy.No.38 & Its Minors of HRBHLC for the year 2026-27.
Removal of silt and jungle in selected reaches of Dy 01, 08, 09, 12 & 13 of HRBHLC.
Hiring of machinery and labours for removal of silt from ch.5.00 km to 10.00 km of Kabini Left Bank Canal.
Feeder canal lining
Clearing Jungle in Hanagodu Anecut and Removal of silt in selected reaches in Uddur branch canal coming under Hanagodu series
Removal of silt and jungle in Dy40, from ch 0.00 to 1.630km and Dy 42 from ch 0.00 to 5.50km of HRBC
Removal of silt in Dy.60, 61, 62, 63 and Yashodarapura sluice canal under HRBC
Removal of silt in Agrahara branch laterals of dy 53 under HRBC
Removal of silt and jungle in Selected reaches from ch 0.000 to 5.00 km of Santhekere tank high level canal coming under Hanagodu Series
Removal of silt & Jungle in Dy.80 and 81 of HRBC
Removal of silt & Jungle in Dy.64, 65, 66, 67, 68 and Hoskote tank Sluice canal under HRBC
Removal of Silt and Jungle in Selected reaches from ch 0.000 to 3.800km of Garikekatte tank LBC and RBC from ch 0.000 to 1.200km coming under hanagodu series
Removal of silt and Jungle in Selected reaches of Kenchanakere feeder channel from ch 5.00 to 11.00 km under Hanagodu series.
Removal of silt and jungle in Selected reaches of Kenchanakere feeder channel from ch 0.00 to 5.00 km under Hanagodu series.
Removal of silt and Jungle in Selected reaches from ch 5.00 to 10.500 km of Santhekere tank high level canal coming under Hanagodu Series