Loading…
Loading…
880 results • Latest
Removal of silt and Jungle in selected reaches from Ch 4.00 to 8.00 km of SLIS for the year 2026-27
Removal of silt and jungle in selected reaches from Ch 23.10 km to 27.00 km of Main canal of HLBC for the year 2026-27
Removal of silt and jungle in selected reaches of Sub-distributaries of Dy 9, 10, 11 & 12 of HLBC for the year 2026-27
Repairs to POs and Removal of Silt in TBC, 13th distry, 14th ditry and its minors and Honaganahalli pickup under TBC
Repairs to POs and Removal of Silt in LBC and RBC of Kirugavalu tank, Nenanuru pickup, Volgere pickup, Samshettypura pickup, D G koppalu pickup and CP Koppalu pickup canals under TBC
Balance work to Sri Lakshmivekataramana Swamy temple in Mavinakere Village of Holenarasipura taluk.
Balance work to Samudaya Bhavana in Mavinakere Village in of Holenarasipura taluk.
Removal of silt and weeds in selected reaches of RBC, LBC and CDS Extension canal and Repairs to Morkha addahall pickup, PO1 of RBC, PO1 of Morkha pickup canal under the atchkat of Bannur tank
Maintainance and removal of silt in Virija main canal and its DPO canals from Ch 10.00 km to 69.00 km
Removal of silt from Ch 66 00km to 90 00 km in CDS canal 191st 214 and 215 PO canal Selected Reaches and Sharadahalla pickup canal KB Canal Arakere and Gendehosahalli tank canal under CDS Main Canal
Maintenance and removal of silt in Branch canals and pickup canals under Virija canal
Maintainance and removal of silt in RBLL main canal and its branches
Removal of silt and weeds in selected reaches of Rajaparameshwari canal
Removal of silt in 16th PO Canal near Cheluvarasana koppalu Yenneholekoppalu, 19th 35th 37th 40th 41st 44th 48th 49th 50th 60th 61th 62nd 78th 80th 128 130 132 136 137 145 and 149 PO Canal 18th Km of Bidagandihalla canal and Ramachari pickup kurabara halla pickup canal under CDS Main canal
Removal of silt and weeds in selected reaches from ch 0.00 to 26.00 km of HHLC Canal and removal of weeds, debris, dry and wet silt in Madegowdanahundi tank.
Removal of silt in LBLL Canal From CH 1st Km to 20th Km 1st 2nd 3rd and 4th branches of LBLL 2nd 3rd 4th and 6th mile and L/S and R/S branches of 7th mile Dy of VC and Donnehalla pickup of 9th dy Damadahalla tank PO canal 10th dy Makanakoppalu Acchappana koppalu Yelekere branch canal and Manchanahalli pickup canal under 12th dy of VC Main canal
Manpower supply
Supply of man power for water management in canals for gate operation guage maintance removal of obstruction etc works
supply of manpower for lift irrigation in mayasandra sub division
Supply of sowdies for the water management of Distributory 18 of NBC for the year 2026-27
supply of sowdies for distributory 11 and 12
supplying of Sowdies for NBC
SUPPLY OF MANPOWER FOR OFFICE MAINTANCE IN NO 3 SUBDIVISION MAYASANDRA
MAN POWER SUPPLY FOR MAYASANDRA TANK ATCHKAT WATERMANAGEMENT
MAN POWER FOR WATERMANAGEMENT IN MAIN CANAL NBC 40TH KM
SUPPLY OF MANPOWER FOR WATERMANAGEMENT IN CANALS OF SD1 OF D26 OF TBC
Supply of Man power
Supply of manpower for maintainance of Byaladakere lis for the year 2026-27
supply of sowdies for the water management from ch 0.00km to ch 32.00km of csd of d10 of nbc for the year 2026-27
Supply of manpower for Hemavathi colony no 13 subdivision bellur cross for the year 2026-27
Supply of Man power
Supply of manpower for water management in canals coming under hemavathy canal subdivision mayasandra,
Removal of slipped earth jungle in LBC and RBC of Mallaghatta tank and repair work to road in Mallaghatta tank atchkat in aturvekere taluk
Removal of jungle and slipped earth and repair works to D7 minor coming under NBC near Jogipalya village of Turvekere taluk
Removal of slipped earth and clearence of Jungle in selected reaches inD-4 of TBC and D-2,D-3,D-4 of NBC and protective works in D-2 and D-4 of NBC
Construction of Trough from CH 3.870 KM to 4.550 KM of D-38 of KRBC
Conducting Topographical survey work using Total station & preparation of detailed estimate for Scheme to Lift water from Cauvery river near Sargur village to fill Uduthorehalla Reservoir and tanks & checkdams around Kurahatti Hosur and Santhekhane in Hanur taluk of Chamarajanagara District
Removal of silt and Jungle in selected reaches of Dy-06, 07 of HRBC for the year 2026-27
Removal of silt and jungle in selected reaches in ch 5.00 to 15.00 km of Dy 15 of PLIC for the year 2026-27
Removal of silt and jungle in selected reches of Dy no 18, 19A and 19 of HRBC for the year 2026-27
Removal of silt and Jungle from Dy-30 to 34th of HLBC for the year 2026-27