TTPS Mech II TM I Unit I II III Breakdown works in Main Turbine system such as Ejectors, control valves critical pipe lines etc for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II Unit IV and V Overhauling of Roller Journal assembly and renewal of wornout grinding rolls of HP 803 mills for a period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit IV V Boiler Preventive and breakdown maintenance works in Burner and H O Guns for the period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM II Unit V Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Annual Maintenance and testing of WBCT BREAKER LAS CVT isolators CC wave traps main bus I II and III PT CTs transfer bus Station transformer I II and spare generator transformer under hung bus earth bus and its frame under hung bu
TTPS Mech II BM Unit IV V Cleaning of Boiler IV V Zero meter area for the period from 01 04 2026 and upto 31 03 2027