Loading…
Loading…
1,349 results • Recent activity
TTPS Mech II BM Unit IV V Attending breakdown works in ESP and clearing of Ash powder fire hazardous materials around ID fans and attending breakdown works in FG duct of Unit IV V for the period from 01 04 2026 and upto 31 03.2027
TTPS Operation Circle MPM II Unit IV Collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at TTPS from 01.04.2026 to 31.03.2027
TTPS Mech II TM I Stage I II Maintaining the T G equipments kept at repair bay free from debris dust and clearing coal ash dust from the repair bay floor for the period from 01 04 2026 to 31 03 2027
TTPS Mech II BM Unit I II III Boiler Preventive and breakdown maintenance works in Burner and H O Guns for the period from 01 04 2026 and upto 31 03 2027
TTPS Mech II TM I Breakdown works in boiler feed water system stator water primary secondary pumps, hydrogen cooler booster pumps chemical dosing pumps and connected cooling water lines in units I II III for the period from 01 04 2026 to 31 03
TTPS Operation Circle MPM II Unit V Attending to routine maintenance works and upkeeping of mills, feeders, coal pipes etc., for the period from 01.04.2026 to 31.03.2027