Loading…
Loading…
1,349 results • Recent activity
TTPS Mech II TM I Unit I II III Breakdown maintenance of regenerative system welding of associated pipe lines for the period from 01 04 2026 to 31 03 2027
SUPPLY OF 11KV, 1250A, 40KA VD4 TYPE VACUUM CIRCUIT BREAKER
TTPS Mech II TM I Unit I II III Breakdown works in Turbine lub oil system seal oil system such as MOT Lub oil seal oil pumps coolers etc for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II Unit IV Attending to routine maintenance works and upkeeping of mills, feeders, coal pipes etc., for the period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit IV V Attending Breakdown works in HP valves actuators safety valves WB LRSB PRDS etc and Cleaning of I II Pass Boiler structures, from 0 metre to 56 metre elevation in Unit IV V boiler for the period from 01 04 2026 and upto 31 0
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027