TTPS ES Circle EM II Weekly cleaning Terminal tightness checking of HT LT Motors HT LT switchgear panels HT LT Breakers Modules Contactor panels and external cleaning of electrical equipments cable trays control room cleaning works at AHP Stage 1
TTPS Mech II TM I Unit I II III Inspection and Cleaning of suction strainer caisson inspection Rectification of thrust bearing, Breakdown works of MC Pumps Drip Pumps and Air compressors for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II Unit IV Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Charges for cleaning and tightness of LDBs pillar box and LP box in Unit I II III TG area 0 Mtr to 13 5 mtr UCB 6 6kv control room DG set room Service building, cable gallery Transformer yard for the period from 01 04 20
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM II Unit V Collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at TTPS from 01.04.2026 to 31.03.2027