Loading…
Loading…
1,318 results • Recent activity
Supply of Clinker Grinder Complete Assembly with modified rollers for Unit I and II and III BAH System Capacity 60 Ton per Hr
FABRICATION AND SUPPLY OF ESP HOPPER LOWER PART WITH BOTTOM FLANGE AND INSPECTION DOOR ASSEMBLY FOR UNIT II ESP
TTPS Operation Circle CAD Unit I CW pump 6.6KV, 500 KW Jyothi make CW Pump Motor Top Bearing Oil and Water Chamber and side Air Cooler Pipes cleaning, and complete cleaning of Converging and Diverging type Fan and Fan cover by using Soap Oil and Pain
TTPS Operation Circle CAD AOH Complete Overhauling of 110 KW Auxiliary Cooling water pump Motors of unit I at ACWPH
TTPS Operation Circle CAD CWPH I Unit I Annual overhauling of 1200 mm butterfly valve and actuators, air releasing valves and other gate diaphragm valve of cooling water system of Unit I
TTPS Operation Circle CAD CWPH I Unit I Annual overhauling of TW screen 1A to 1D complete silt removal from pump suction end to TW screen channel entry gate for the year 2025 to 2026