Loading…
Loading…
1,394 results • Recent activity
Rectification by Providing RCC Drain along the South of ESP 4 area from Culvert end to ASPH
Remedial measures by Strengthening and Protective Coating in the RCC PSC Structures of Coal Jetty Conveyor System from JT 1E towards West in Short Span 1 and Long Span 2 5 of Conveyor 14 in Red Gate area North Break Water of VOC Port
TTPS Mech II BM Unit II Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2025 2026
TTPS Mech II BM Unit II Overhaul of long retractable soot blower LRSB and water wall soot blower during the year 2025 2026
TTPS Mech II BM Unit II Patch up works in ducts including supports and fixing of guide vanes splitter in flue gas ducts of B pass C path D path for the year 2025 2026
TTPS Mech II BM Unit II Patch up works in ducts including supports and fixing of guide vanes splitter in flue gas ducts of A pass A path B path for the year 2025 2026