Loading…
Loading…
1,361 results • Recent activity
TTPS MechII AHP Unit I II III Breakdown maintenance works of HDPE pipes and fittings of size 40mm and 75mm OD and rubber lining of 80 NB to 450 NB MS pipes fittings flushing apparatus in Unit I II III ECO APH hoppers for the period from 01
Repair and Maintenance Works to the Sunshade, Loft, Roof Terrace Tiles, Rain Water Downfall Pipes and Inner Rooms in Type 1 Quarters Block No. 13, 15 and 19 at Analmin Nagar
ICHP -Clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of Stacker-II and Reclaimer-II machine travel path in Conveyor-54.
TTPS Mech II AHP Removing the silt like ash coal and sand in slurry form below and front and backside of the weighbridge and in between the weighbridge and support walls for the period from 01 04 2026 to 31 03 2027
TTPS MechII AHP Unit IV V BAH ECO and APH Break down maintenance of HDPE pipes of various size from 32 mm OD to 450m welding of punctured joint new joints dismantling and reerection of the HDPE pipe of old new and rubber lining of MS pipe of vari
ICHP -Clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north, south sides of Stacker-I and Reclaimer-I machines travel path in Conveyor-49.