ICHP- Cleaning, maintaining and tightness checking all proximity switches, Thyristor control DC drive system, PCRD CCRD system resistance wires, brushes, power control cables, monitoring normalizing PCRD CCRD in Reclaimer-I and II machine
TTPS Mech II AHP Breakdown Maintenance works in ash slurry disposal lines of unit IV V for the period from 01 04 2026 to 31 03 2027
Arresting Water Leakage in the Roof of Bunker Building at 52m elevation in Unit 4 area
ICHP- Cleaning, maintaining and tightness checking all proximity switches, PCRD CCRD system resistance wires, brushes, power control cables, etc., in Stacker-I and II
TTPS Mech II AHP Breakdown maintenance works in Ash slurry disposal lines of Unit III for the period from 01 04 2026 to 31 03 2027
ICHP- Cleaning of the spilled and accumulated coal in Stacker-I II and Reclaimer-I II machines associated areas and removal of coal chocking in coal transfer chutes in all the four machines.