Loading…
Loading…
1,361 results • Recent activity
TTPS MechII AHP UnitI II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2026 to 31 03 2027
TTPS Mech.II AHP Attending Rubber lining works in Unit I II III BAH sea water supplied pipes lines fittings BAH manhole door acces door and over flow tank for the period from 01 04 2026 to 31 03 2027
TTPS Mech II TM II Transport section Carrying out the cleaning of the Transport office premises Bus Garage compressor car washer room Ramp and tools room at Camp I and other minor repair works pertaining to compressor car washer specified by the
TTPS MechII AHP UnitI II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period from 01 04 2026 to 31 03 2027
Repair and Maintenance Works to the Office Building for AHP Sub Div. 3 and 4 near Ash Slurry Pump House 1 and 2
TTPS MechII Safety Industrial Safety Health Monitoring and assisting in various field inspections Contract labour entry statutory verification at Safety LWO wings for the period from 01 04 2026 to 31 03 2027