Loading…
Loading…
1,361 results • Recent activity
Protection arrangements in the Cross Bund Spillway Main Spillway by Shifting and Laying available Concrete Pedestals 1.50 MT to 3 MT approx. from Switchyard to Downstream of Cross Bund Spillway Main Spillway at TTPS
TTPS Operation Circle CMP Annual Maintenance contract of local area network components in various offices of TTPS for the period from 01.04.2026 to 31.03.2027
ICHP- Attending preventive mechanical maintenance of Bull Dozers.
TTPS Operation Circle Chemical Division Testing and analysis of Fuel lab for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle CAD CWPH I Lifting of the trash rack screen from the CWPH I fore bay, cleaning of the debris and re erection in its position for Unit I, II, III for the period from 01.04.2026 to 31.03.2027
TTPS MechII AHP Breakdown Overhauling of Ash Water pump filteration plant valves etc in units IV V for the period from 01 04 2026 to 31 03 202