Loading…
Loading…
63 results • Latest
Computation of HFL Hydraulic Study
Computation of HFL and Hydraulic study Blue line and Red line
Construction of Bridge on Ghoti Trimbak National Highway 160A with bridge approach roads across tail channel of Vaitrna Mukane Gravity Diversion Scheme Tal. Igatpuri Dist. Nashik.
CONSTRUCTION OF VIP REST HOUSE AT UPPER PRAVARA PROJECT GHULEWADI COLONY AND CONSTRUCTION OF VIP REST HOUSE AT NILWANDE DAM AND OPERATION WITH MAINTENANCE AND REPAIR FOR 5 YEARS.
Repairs
Repairs
Strengthening
4702 Special Repairs to Dhanoli left bank canal from ch.165 m. to 12000 m. of Dhanoli M.I.Tank, Tal. Kalwan Dist. Nashik
Construction of underground pipe line system for Dahikute Right Bank Canal Improving operational performance of a head regulator and miscellaneous in Dahikute M.I. Project Ta. Malegaon.
Carrying Out Survey
Constructing Steel Foot Over Bridge on Left Bank Canal and Right Bank Canal of Upper Pravara Nilwande II Project Tal Akole, Dist Ahilyanagar
Construction of internal Roads ( Bituminious, Concrete) at 4 Number of Rehabilitated Villages under Jayakwadi Major Irrigation Project in Shevgaon Taluka, Dist. Ahilyanagar.
Repair
Repair
Repairs
Repairs
To carry out detailed survey, investigation and report preparation work in the wildlife and protected forest areas within the scope of Hivra Nala Diversion Scheme Tal. Akole Dist. Ahilyanagar..
To carry out detailed survey, investigation and report preparation work in the wildlife and protected forest areas within the scope of Samrad Nala Diversion Scheme Tal. Akole Dist. Ahilyanagar.
Repair work of the Division office Minor Irrigation Division No. 2 Nashik Toilet and other works
Providing and fixing Needles to Shirasgaon K.T. weir Tal. Niphad Dist.Nashik
Providing and fixing Needles to Raulas (Pimpri) K.T. weir Tal. Niphad Dist. Nashik
Modernisation of Bhojapur Left Bank Canal (Including Dy-3 of Dodi Branch, HPD Repairs) (Earthwork, Lining and Structures)
Development, Operation, Maintenance and Management of a 150 MW Floating Solar PV PLUS Battery Energy Storage System 150 MW FSPV PLUS BESS Project on the Reservoir Surface of Mula Major Dam Ta. Rahuri, Dist. Ahilyanagar on PPP Basis.
Construction of internal Roads and Buildings Metalling, Bituminious, Grampanchayat Office and Smashanbhumi) at 7 Number of Rehabilitated Villages under Jayakwadi Major Irrigation Project in Newasa Taluka, Dist. Ahilyanagar.
Work Of The Nall at Cilvert No.29 at Chainage 64200 and Nall at Culvert No.30 at Chainage 66815 on Godawari Right Bank Canal
Earth filling on Culvert At Ch.80900 and 83700m for safty of GRBC and Repairs of others related works.
Earth filling on Culvert At Ch. 22/150 and 26/000 m for safty of GRBC and Repairs of others related works.
Repairs to the Embankment and lining to Km 17-18 of Palkhed Left Bank Canal and executing other allied works.
e-Auction for murum available from excavation of Tail Canal branch of UPLBC at khandala Tal.Shrirampur Dist. Ahilyanagar.
Construction of bridge at Ch. 47/270 and executing other allied works of Palkhed Left Bank Canal.
Providing Embankment, lining between Km 53/400 to 54/100 of Palkhed Left Bank Canal and Other Allied Works.
Constructing Head Regulator for Jeur Kumbhari Water Supply Scheme at Ch.65/550 m of GRBC
Constructing Head Regulator for Chasnali water supply Scheme at Ch.24/200 m of GRBC
Strengthening of Waste Weir, Head Regulator, Dam Earthwork at Saradwadi, Tal. Sinner, Dist. Nashik
Remoulding of Girna Left and Right Bank canal and Restoration of Mosam rice canal under Nar-Par Girna River Link Project, Tal. Malegaon Dist. Nashik
Construction of underground pipe line system for Bori Ambedari main Canal and Zodge Dy of Bori Right Bank Canal Improving Operational performance of a Head regulator and miscellaneous in Bori Ambedari M I Project Tal Malegaon
Constructing Ghat On The Right Bank Of Godavari River, Above The Confluence Of Godavari-Nandini Rivers At Takali Tal. Dist. Nashik For Sinhastha Kumbhmela 2027
Construction of Internal road in ghulewadi colony, construction and repairing of compound wall, repairing/ renovation of class 3 and class 4 quarters, construction of hirkani kasha and ladies and gents toilet block for ghulewadi Of Upper Pravara
Construction of internal Roads ( Metalling, Bituminious, Concrete) at 22 Number of Rehabilitated Villages under Jayakwadi Major Irrigation Project in Newasa Taluka, Dist. Ahilyanagar.
Repair work
Construction of retaining wall for earthwork at downstream side of Aq. Ch 675 m., Construction of Crash Barrier at KM 3 (Ch 2200 to 2900m) of UPLBC and Chain-link fencing at Ch.( 900 to 1400)m of UPRBC,of Upper Pravara ( Nilwande-2) Project
Preliminary investigation
Constructing Gabion Structure for Flood Protection work on U/S of Shingave K.T.Weir on Right Flank of Godavari River, Tal Rahata, Dist A.Nagar.
CONSTRUCTING GHAT ON LEFT BANK OF GODAVARI RIVER AT TAKALI UPSTREAM OF NANDINI SANGAM, TAL./ DIST NASHIK FOR SINHASTHA KUMBHMELA 2027
Construction of Head Regulator
Construction of Head Regulator
Construction of Head Regulator
Construction of Head Regulator
Construction of Head Regulator
Construction of Head Regulator