Loading…
Loading…
2,975 results • Latest
Repair of Phus Mat of movable Rest shelter and grouting work in the mine at Kathara colliery
Day to day Road sweeping for dust suppression from Poda gate to Saunda-B Siding Under GM Unit Barka-Sayal Area. ( for a period of one year )
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
A)Dismantling, diverting and laying of one
Making of 02 nos. shed
Supply and Installation of Heat Shrinkable Jointing Kits on an as and when required basis for a period of one year at Birsa Project.
Shifting and re-organisation of pipeline range near annexation patch for haul road preparation in AADOCM under Dhori Area
Fencing of 04 no. of L.T. transformer situated at Karbala, Golpahari, Baglatta point and switch at Golpahari for safety point of view and avoiding tease passing w.r.t. AADOCM of Dhori Area.
Making of pumping accessories for dewatering of mines at AADOCM, Dhori Area.
Maintenance work for 06 months for civil Horticulture, Miscellaneous repair at Kayakalp vatika Ashok OCP, Piparwar Area.
Day-to-Day operation, repair and maintenance of fixed water sprinklers from Water Filling Point to WB No. 8/9 for two years under Amrapali OCP of A-C Area, CCL.
Upgradation of 1MVA X 3 3 MVA , 11KV/3.3KV CRS Electrical Substation along with Enamel painting of electrical equipments and proper marking of control panels at 11KV/3.3 KV CRS, Barkakana ,CCL.
Repairing of both side rear final drive and rear brake assembly, Axle shaft LH splines, bracket LH, etc of WS28-2 for float. De-mounting and dismantling of differential assembly, repairing of differential shaft, seal replacement, etc WT01 at AOCP
Fabrication and commissioning of 0ne (01) no PVC drum pontoon for one (01) no of pump capacity 1000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Tapin OCP under Hazaribagh Area.
Replacement of MCB, MCCB and MCB Box panel for power supply of Air Conditioner in entire GM Office under GM Unit, Piparwar Area
Flat Woven Webbing Slings ISI Marked to IS 15041 (Q2)
Laying and jointing of M.S/G.I. Pipelines of nominal dia. 6inch and 8inch for dewatering of sumps at Sec.I n Sec.II patches on as, when and where required basis for a period of 06 months (180 days) for mines of Rajrappa Project
Laying 350 meter fresh HDPE pipe having dimension 90 mm dia OD-90 MM and ID 76 MM nominal dismantling old and damaged existing HDPE pipe along with disposal of existing material at PEOCP, Hazaribagh area.
Rewinding and repairing of 360KW, 3.3KV, 1488 RPM, 3 Phase HT induction motor Marathon make Sl no 3F331236/11 at PEOCP under Hazaribag Area.
Repairing and overhauling of Andrew Yule make VCB 3.3 KV, 630 Amp sl no-2728 installed at Parej substation secondary control of 3 MVA Power Transformer and Sait Teknik pvt ltd make 3.3KV, 360KW HT Starter sl no-SAHD2732 at PE OCP under Hzb. Area.
Handling and Transport on Lumpsum Basis - Hiring of Tractor Mounted 6kL Water Sprinkler on per day hiring basis for 03 years 12 hours availability along with one Drive) for water sprinkling inside CRO campus and Colliery Main Gate approaching roads o..
Bus Hiring Service - Regular Basis - Local; 52 Seater; COMPANY MANUFACTURED SCHOOL BUS; 48 kms per day
Repair and Maintenance of RCC Guard wall, approach road and RCC Retaining wall at different check post and Weigh Bridges under Amrapali OCP of A-C Area CCL.
Calibration Services - Cleaning testing and adjusting of CI test weights 20 kg each to be used for calibration of 50 Te Electronic Road Weighbridge No 01 and 02 at the time of annual stamping installed at Purnadih OCP NK Area; 1600 nos 20 kg CI test ..
COAL FIRE INHIBITOR
Laying of Fresh Water Pipeline for supply of fresh water to Rajrappa Washery Project from Rajrappa Opencast Mine
Cleaning of installed Solar panels of 250 KW capacity at the roof tops of G.M. Office Administrative building and Silver Jubilee Hospital (once a week) and trimming of trees along the periphery of both the rooftops on as n when required basis for 1yr
Bus Hiring Service - Regular Basis - Local; SEATING CAPACITY SHOULD NOT BE LESS THAN 52; Deluxe (DLX); 1250 KM PER MONTH
Calibration Services - Mechanical, Thermal; Mass and Volume, Density and Viscosity, Temperature, Density; NABL Labs; Buyer premises (onsite)
Custom Bid for Services - AMC for brooming, floor cleaning etc of Bachra siding office, canteen including material like Phenyl, broom etc for two years under CHP-CPP, Piparwar area Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Extension/erection of HT Overhead Line of 6.6KV of feeder No.-7 (Route length of erection approx. 1100 mtrs.) from Washery More to Sec.-1 patch for Monsoon preparedness at mines of Rajrappa Project
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; Date of first registration of vehicle should not be more than 03 years from the date of opening of bid; Not more than 75000 km; A/C; 12
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Loading and Transportation of 1 Lakh Te of coal by from New outsourcing patch to raw coal receiving hopper of Rajrappa Washery
Repairing of two No. 1000 GPM pump and one 500 GPM pump installed at different location for monsoon preparation in respect of Rohini Project, NK Area
Repairing of Kirloskar Make UP200/56 Model, 540 Cu.M/Hr (2000 GPM) Pump, 100 Mtr. Head, Pump Sl. No. 02 along with rep of motor 350KW, 3.3KV of Sayal OCP.
diversion of Colony04 New and Old Feeders to outside the proposed mining area near Wahsery More through Rajrappa Project Unit near Township area
complete repairing and servicing of TATA make explosive van and fire tender running at Sayal -D Project
Complete repairing and strengthening of the weighment platform structure of Road Weighbridge No. 02, Make Tycoon, Sl. No. 2406120 installed at Dakra siding under Dakra Project, NK Area
Urgent installation of High Density Polyethylene (HDPE) pipe from discharge range of face and 32 no. pump (near coal stock no. 2) to Jehlitand face for fire fighting and systematic benching from top downward for compliance of Section 22 imposed by D
Repair of 3000 GPM Pump Installed at East Quarry and 1000 GPM Pump Installed at Ghandauniya Sump along with trial run and testing at site under Birsa Project.
Laying and commissioning of new range of pipeline for installation of pump at new coal face Sump to Dhupgarah Nala for dewatering of coal face Sump for coal production from Dakra seam for advancement of new working coal face under Dakra Project, NK A
Leasing of Electric Vehicles (Long Term) - Wet Lease; Tata Nexon EV, Mahindra XUV 3XO or equivalent; 3000 KMs & 12 Hours; 36 Months Lease; White
Repairing of Hoist Brake, Swing Brake System and Steering System of EKG 5A Shovel Sl. No. 593 and Repairing of Bull Gear Pinion LHS and RHS of Shovel Sl. No. EKG 5A 593 of Birsa Project
Repairing and maintenance of 12 nos. 11KV GOAB and Heightening and maintenance of Bus-Bar system and its related accessories at Substation, Crusher Sub-station and mines Sub-station of Karma Project Under Kuju Area.
Repairing of roof denting/straightening, tar felting of whole roof and side cover of EKG 5A Shovel (SI.No. 593) and vulcanizing of 10 Nos trailing cable joints (3.3KV Core Cable) for CK-300 Shovel (SI.No. 180) deployed at Birsa Project
Rewinding and repairing of 240KW, 3.3KV, 1490RPM 3 Phase HT induction motor Marathon make Sl no-F3307113/1 at PEOCP Hazaribagh Area.
Filling of earth and other minor miscellaneous works near 05 no. Dhowrah for fire Containment under AADOCM of Dhori Area
Repairing of TATA make Reg . No BR13G--0514 of Parej East OC Project Under Hazaribagh Area.
Repairing and wiring from DC Panel to Swing motor LH and RH, DC panel to LV current collector to propel motor with repair and maintenance of RMC Panel, swing master controller of EKG 5A Rope Shovel sl. No. HMB591 of Rohini OCP.