3,001 results • Latest
Replacement of hydraulic hoses of 03 nos. BD355 dozer, SI. No. 11615, 11644 and 11906 and 02 nos. BD155 dozer, SI. No. 13604 and 13285 of Urimari OCP.
(A) Reinforcement of blade assy. etc. of Dozer 13285. (B) Rep. of holes of both side sprocket etc. of Dozer 11644 and rep. of both side trunnion etc. of Dozer 11615 and rep. of brake liner of Dozer 13604 of Urimari OCP.
Repairing / reconditioning of 02 nos. Lathe machine installed at workshop of Sawang Washery.
Dismantling of 10 inch, 8 inch and 6inch dia old pipes and other iron materials from different mines to fabricate the fixed type lighting tower for illumination of different mines and colonies under, BnK Area
Dismantling of sheds and other allied building, structures and OH line of Kargali Excavation workshop for providing working space for construction of Main office building, Mani control room, Compressor house, and sub-station B of Karo CHP
work of Repairing of mast lock plate in chassis, equalizer bar and rear axle cap, 03 nos. leveling jack and 03 nos. leveling jack pad of IDM30 Sl. No. 1315 of Bokaro Colliery, BK Area.
Writing of Safety slogan traffic rule, Sop at prominent places like Managers office Excavation office DD mines substation weighbridge check post rest shelter canteen and exit point in the mine of Bokaro Colliery OCP
Repairing of Mast rest, carousel, battery box, operator cabin, glasses, operator seat, battery cut-off switch of IDM30 Drill Sl. No. 6846 deployed at Topa Ocp Kuju Area.
Repairing of Radiator Assy., Steering Cylinder and Hoist Cylinder of BH60M Dumpers Sl. No. 60909 and 60921 deployed at Topa OCP, Kuju Area.
External painting of different types of quarter along with repair and other misc. works at Jawahar Nagar Colony, under WnS Dept., CCL, Ranchi (retender)
Repairing of Front suspension (LH and RH), Both side steering cylinder its linkage and tie rod of CAT773E dumper sl. no. 1009 at Tapin North OCP.
Repairing of Rear wheel housing, tyre mounting and transmission guard of CAT773E sl. no. 1009 of Tapin North OCP
Repairing of Blade assembly, Cutting edge, End bit, base plate and sprocket assly of BD355 Dozer sl. no. 11905 at Tapin North OCP.
VACUUM INTRRUPTER 12KV 25KA 800AMP for spares of 11KV & 3.3KV VCB for PCE Project pvt. ltd., PT DRY TYPE 3P EPOXY 11KV 200VA IS3156-I for spares of 11KV & 3.3 KV VCB for PCE Project pvt. ltd., PT DRY TYPE 3P 3.3KV 100VA EPOXY MOULDED for spares of 11KV & 3.3KV VCB for PCE Project pvt. ltd., DRY TYPE EPOXY CTR 400-200/5/5A for spares of 11KV & 3.3KV VCB for PCE Project pvt. ltd., TRIP COIL WITH ASSEMBLY for spares of 11KV & 3.3KV VCB for PCE Projects pvt. ltd., RECTIFIER CAPACITOR UNIT for spares of 11KV & 3.3KV VCB for PCE Project pvt., IDMT RELAY O/C + E/F 50% -200% 110V AC/DC/5A for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, PT FUSE VOLTAGE 11KV/1 AMPS for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, PT FUSE VOLTAGE 3.3KV 3 AMP for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, AUXILIARY CONTACT SWITCH 110V for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, CLOSING COIL WITH ASSEMBLY for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, EARTH FAULT RELAY for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd, SERIES TRIP MECHANISM for spares of 11KV & 3.3KV VCB for PCE projects pvt. ltd
Repairing of front wall, base plate of bucket assembly, bucket eyes, dipper-bucket door assembly, dipper handle, latch bar, bucket heel of EKG Shovel S.l no. 563 at Tapin North OCP.
Rewinding of 400KW, 3.3KV,1490 RPM, Marathon make Motor , SI No. 3F330524/5 of Sayal OCP.
Repair, maintenance and development of NSK and Yoga Centre at Jawahar Nagar Colony, under WnS Dept., CCL, HQ., Ranchi.
Complete repairing of PLS 450 Pump of unit no. 270 main plant at kedla washery.
Repair of road from Utkramit Middle School Jhirkey Panchayat to Haji Bilas House under Kathara Colliery
Repair of Laboratory Model Disc type Pulverizer Machine installed at Gidi-C Colliery.
Repairing of stick cylinder by repairing of Barrel, piston and check nut new making with new seal kit fitting of ZX650H Tata Hitachi backhoe Sl. No. Exc-2912 of GVP Ph II OCP
Repairing of LHS and RHS bend idler foundation frame of LandT 300CK Sl. No. Exc-2901 shovel of GVP Ph II OCP.
Rewinding/Repairing of 02 Nos. of 3.3 KV Motor(350 KW, Crompton make and 260 KW, Marathon make)of Sayal-D OCP.
Repairing of 02 nos. propel motor, 02 nos. rotary motor and 01 no. PTO power of RECP 650 Drill, Sl. No.6021703 of GVP Ph II OCP.
Repairing of Meditron make 11 KV, 400 A,Sl.No.0018, VCB installed at Patratu water works under Sayal-OCP.
Calibration Services - Cleaning testing and adjusting of 3823 Nos of 20 Kg each CI test weights for Annual verification and stamping Rail Weighbridge and Road Weighbridge under KDH Project NK Area; 3823 Nos 20 kg CI Test Weights; Valid license issued..
Repair and maintenance of Community centre drain with path near Asnapani Village under G.M.Unit Kathara
Repairing and reconditioning of VCB Switch (A) 11KV, VCB Make- A/Y, 630 A, Sl. NO.- 1528 for controlling of CPP feeder (B) 11KV ,VCB make-PCE, 400A,Sl. No.-2004/ HMV/64 for controlling of jrd. Colliery feeder and (C) 3.3 kv , make- A/Y ,630 A, Sl. No
Dismantling, installation of Pump-Motor set up to 550V along with cable handling and repairing, maintenance and modification of Base-plate if and when required for a period of one year (365-days) of all Pump-motor set under Water Supply (12) Nos. Pum
Repairing of earth pits by replacing of worn-out/rusted G.I Flat/strip into XLPE/PVC insulated cables for different transformers installed at Regional Sub-Station, Kathara.
Supplying, making and fixing of outdoor cable termination Officer Club, end Russian complete with all accessories required for transformers at Gayatri Colony, Colony, River Side, Civil Office and 9.0 under Kathara Colliery.
Fresh wiring of Krishna Chetna Mandir and Community hall at CCD under G.M. unit, Dhori Area
Work in respect of dismantling of old cable Rack EandT equipment and dressing of cables with casing and earthing for biometric machines installed at GM unit Dhori Area
Repairing / Fabrication of cylinder stay, engine bottom guard, transmission guard and exhaust system of BD - 355 Dozer, Sl. No- T - 11723, of Kathara Col-liery.
Repairing and Reconditioning of 3 Nos. 11 KV VCBs at Gidi Washery Main Substation under Argada Area.
Improvement of lighting at siding along with maintenance of 440v/220v overhead line at AADOCM Dhori Area.
Repairing of wiring/Rewiring of 06 nos of quarter occupied by the employee under AADOCM, Dhori area
Supply, Installation and Commissioning of 03 Nos. Diesel Hydraulic Backhoe Excavator 5-6 CuM
Breath Analyser (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Misc. Civil works for smooth functioning of pumps, motors and water supply arrangements at Gandhi Nagar Colony, CCL, Ranchi
Provision of a server room for ICCC Control in GM Unit of Hazaribagh
OVERHAUL KIT OF CLT 754 TRANMISSION PART NO. - 787TMB0093
Electric Ceiling Fan with BLDC Motor (V3) ISI Marked to IS 374 (Q2)
Dismantling of old and damaged structure, replacement / repairing of stockpile BC receiving chute, gantry, pathway, its column, structure, post etc. work in Railway Siding Section of Sawang Washery.
Repairing and overhauling of different gear box of main plant section for different belt conveyor BC-51, slurry BC, By pass BC, Clean Coal BC, Middling BC, Clean coal shuttle BC, Middling coal Shuttle BC of Sawang Washery.
Replacement of under hopper feeding discharge chute liner along with damaged base frame of R,P gate no. 120A, 120B and 120C after electromagnetic vibrofeeder dismantling and re-installation of Raw coal bunker main plant of Kedla Washery.
Rectification and modification of drive base frame arrangement and under feeding hopper after G/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121AandB belt conveyor main plant of Kedla Washery.
Complete repairing of 02 pairs of Gear Coupling GC-07 of Unit no. 121 A and B Belt Conveyor and 01 no. non-drive pulley (Dia -550X1400 mm) for Belt Conveyor unit. No. 122 of main plant of Kedla Washery.
Bus Hiring Service - Regular Basis - Local; 52 Plus 1 Saeter minimum seating capacity; School Bus; 113 Km per day
Repairing of different type of hose assemblies for BEML Dozer BD155/BD355 of Religara OCP.