Loading…
Loading…
1,616 live746 closing this weekmost from Central Railway and Indian Railways
1,616 results • Latest
Secondary Spring (Outer) for Generator Car Side-1 to FIAT Drg. No.1277146, Ver. 01R1 and conforming to RDSO Specification No. RDSO/2017/CG-01, Rev-03 of January 2025 along with RDSO Letter No. SV. FIAT. Spring Dated 11-06-2019. Spring Code No. F14.
(i) Pardhade: Provision of High-level platform at Pardhade station of length (375x3.75mx2) (PF 1&2) (PID: 01.01.53.25.3.50.026), (ii)Sirsoli- Raising of platform from rail level to high level at Sirsoli railway station, DN RL PF: 360 m X 4m) & UP RL PF : (360m X 4m) (PID : 01.01.53.25.3.50.027), (iii)Mahaswad- Raising of platform from rail level/medium level (220mx 9.10m) & (144mx9.10m) to high level DN Loop PF (240mX7m). (PID : 01.01.53.25.3.50.028), (iv)Waghoda : Raising and extension of platforms from Rail level to High-level platform (555mm x6mm,) including toilet, sitting arrangement, drinking water and drainage arrangement etc. at waghoda railway station. (PID: 01.01.53.25.3.50.030), (v)Dongargaon : Raising and extension of platform from rail level to High level UP (360m X 8m) & DN (380m X 8m), including toilet, sitting arrangement, drinking water and drainage arrangement etc at Dongargaon station. (PID : 01.01.53.25.3.50.031), (vi)Provision for divyangjan amenities at Asirgarh, Bagmar, Mandwa & Duskheda on Railway stations.(NSG-6) (PID : 01.01.53.25.3.50.029).
Battery operated High performance LED area light with 3000 lumens output light weight & unbreakable as per specification attached.
"Work of CAMC for out of warranty coaches & periodical maintenance of underwarranty coaches for pressurized Flushing system (PFS) and Electro PneumaticPressurized Flushing system (EPPFS) installed in LHB Coaches at NGP/AQ CoachingDepot for the period of 24 months." & "Work of Modification in Pressurized FlushingSystem as prescribed by RDSO, MCF-RBL in LHB coaches based at Nagpur Division".
GLASS FIBRE CORD 1 DIA. 7 AS PER SPECIFI [GLASS FIBRE CORD 1 DIA. 7 AS PER SPECIFICATION NO. 4TMS.096.100, STR NO. EL/TM/2066 REV. 2.]
Set of Axle Box Assembly Complete for flexi coil 3-Axle Bogie for WAP-1/4 Electric Loco as per RDSO Drg. No. SKVL-603 Alt-7, Confirming to RDSO Specn. No. MP.0.3600.01. (Revision - 01) November 2020. One Set Consisting 03 Items 12 Nos. As Under :- (1) Centre Axle box with plain end cover & bearings Qty-04 Nos. (2) End axle box with speedometer end cover & Bearings (LH & RH) Qty-02 Nos. (3) End axle box with plain end cover & bearings Qty-06 Nos.
Reconditioning of Cupped Welded Joints using RDSO approved technology in the Bhusawal Division.
Outsourcing Phased Array Ultrasonic Testing (PAUT) of Flash Butt welded joints in Pune Division of Central Railway.
Balance work for replacement of channel sleepers by H-beam sleepers of Br No. 143/2,148/1,171/1,178/3,204/1,206/5,207/3,237/2,246/2,261/1 & 267/1 on PA-MRJ section and Br No. 1/1,1/2,5/1,5/2,6/1 & 6/2 on MRJ-KOP section under Sr. DEN/S/PA (Re-invite).
Supplying, stacking and loading into Railway Hoppers of machine crushed ballast as per revised specification RDSO/ IRSE-GE-I of June 2016 with latest amendment at Miraj depot under ADEN/ MRJ's section.
A) TNA- Supply of potable drinking water through road tankers at various locations from KJRD to Thane.B) Kalva- Supply of potable drinking water through road tankers for Kalva Carshed, Kalva Colony, Parsic Sub station.C)MBQ-DW-Dativali- Supply of potable drinking water through road tankers at Mumbra, Diwa & Datiwali stations under SSE(Wks) TNA for 24 months.
Provision of Waste water management system 50 KLD and improvement of existing drainage system at DRH KYN.
Construction of Traction Sub-Station at Dativali. (GIS Type 110KV/25 kv Traction Sub-Station)
A) Standing contracts for Repairs to boundary wall between BY to VK section for prevent trespassing.B) Standing contracts for Repairs to boundary wall between KJRD to KYN section for prevent trespassing under ADEN(W)KYNC) Standing contracts for Repairs to boundary wall between GTBN to MNKD & VDLR to KCE section for prevent trespassing.
TOOL KIT 46 PIECES SOCKET 1/4 INCH SOCKE [TOOL KIT 46 PIECES SOCKET 1/4 INCH SOCKET. SET CONSISTS OF 09 ITEMS IN 46 NOS. AS PER ANNEXURE A. MAKE- FORCE/BOSCH/STANLEY/POWERGRIP.]
Work of installation of Linen Cabinets in AC Coaches pertaining to LTT Coaching Depot of Mumbai Division
Bogie movement activities of ICF, LHB, EMU and Vande Bharat coaches in Lifting section of MTN workshop.
Deployment of companion to night patrolman through outsourcing for 2 Years in BSL Division.