Loading…
Loading…
1,534 results • Latest
PITC of fire preventionfire safety measures newly constructed G4 Building Tripura High CourtAgartalaSH PITC Wet Rise Sprinklerfirefightingsystem portable Fire Extinguishers with 3 years CAMC post 1year warrantyDLP newly constructed G4 Building
Comprehensive Annual Maintenance Contract CAMC of 1 no of Otis make 15 passenger capacity Lift serving upto G2 level installed at Dhalai District hospital Kulai for 3 three years 2nd call
CAMC for 10 Nos 8 5 TR 02 Nos 11 TR and 03 nos 5 5 TR ductable split AC for a period of 02 years at College Building Jayanti Building Old Building and NTH 1 Building and incidental repairing of 01 No 8 5 TR and 2 Nos 5 5 TR ductable Split AC at diff
Vertical extension of college of Veterinary Science and Animal husbandry at R.K Nagar, West Tripura SH providing different kinds of Civil work for installation of passenger lifts at college of Veterinary Science and Animal husbandry at R.K Nagar,
Providing installation commissioning of 1 5 2 00 TR High Wall Split Type Air Conditioning System in different locations Infertility Clinic eHospital Server Room Department of General Surgery and Central Workshop of AGMC GBP Hospital Agartala
CAMC for 01 No Machine Room Lift of 26 No passengers Capacity Bed Cum Passenger of G2 Lift Otis Make for 03 Three years at Teliamura Sub Division Hospital Khowai District Tripura 4th call
Providing Installation and Commissioning of 15 TR 2 0 TR High wall and 3 65 TR Floor mounted vertical Split type Air Conditioning system in different locations Orthopedics Respiratory Medicine Newly renovated NICU HDU OT Complex of NTHI CTVS IR USG r
Maintenance of different roads under Mandwi Sub-Division during the year 2026-27 SH Patch Grouting, Patch Carpeting, Earth Cutting, Earth Filling, Missing soling, Providing and Placing of wire crates, Placing of Gunny bag, Construction of surface...
Providing, Installation and Commissioning of 1 5 TR 2 0 TR High wall and 3 65 TR Floor mounted vertical Split type Air Conditioning system in different locations Library cum Seminar Room Demonstration Room Research Lab and Computer Assisted Learning
Maintenance of road from Banikya Chowmohani to IOCL road approach(MDR)(L 4.125 Km) under PWD(R and B), Khayerpur Sub-Division during the year 2025-26 (Group-II)
Maintenance of different roads under the jurisdiction of PWD(R and B) Jirania Sub Division during the year 2026-27 SH Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains, bats filling
Improvement of road from Narayanbari SB School near the house of Jhon Debbarma to Office Tilla PWD road under Paschim Barjala VC under Jirania RD Block (L 2.075Km)
FDR Maintenance of AA road to Kalibari via Bikram Molsom under the jurisdiction of Khumulwng PWD (R and B) Sub-Division during the year 2024-25..(Group-II)
Maintenance of internal road of TSR 2nd BN Head-quarter at R.K Nagar (L 1.000 Km) under the PWD (R B) Khayerpur Sub-Division during the year 2025-26..(3rd Call)
Construction of Girls sick room at Khumulwng Govt. Degree College under the head of gender inclusion and equity initiative (giei) under PM Usha Scheme during the year 2026-27..under Khumulwng Sub Division,PWD(R and B).
Mtc of different Bailey Bridge under Mandwi Sub-Division during the year 2024-25 SH Strengthening of existing Bailey Bridge by providing and fitting fixing of transom clamp, nut bolts, welding, painting and other allied works etc (2nd Call).
Repair of pot holes with SHELMAC under Kanchanpur Division PWD RnB during the F.Y. 2025-2026/SH-- Repair pot holes etc.
Development of black top road from A) Agartala-Simna road (MMC office) to Balahari Debnath house of Ramakrishna Pally (L-0.367 km) B) Mohanpur-Bamutia road to Border Fencing via Rangamura (L- 0.30 km)
Development of black top road from Tulabagan Chowmuhani (NH-108B) to Dhigalia via protective home (L-2.00 Km) (Ch- 0.00 Km to Ch- 1.40 km) the year 2026-27/Sh Grouting, Carpeting, Track Coat, Seal Coat, Surface drain, etc
Urgent maintenance of Gonda Twisa-Amarpur road (L-17.50 km) under Dumburnagar R.D. Block under PWD(RandB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
Providing installation and commissioning of Air Conditioning Machine in the office building of the Directorate of Medical Education Tripura PBDas Memorial Building Bidur Karta Chowmuhani Agartala
Mtc of Residential quarter at S E Quarter Complex All types under Kumarghat PWD R and B Sub Division during the year 2026 27 SH Dismantling Plastering Painting etc
Metalling, grouting, PMC, etc. during the year 2025-26
Development of road from Vanghmun Village Graveyard appropach road, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,BM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road of the Eden tourist lodge appropach road, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road of the Vanghmun Village appropach road, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026-27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road from Netajinagar to Ahalyapur at Ch 02.00 Km to Ch 03.10 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road from Netajinagar to Ahalyapur at Ch 1.00 Km to Ch 2.00 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road from Netajinagar to Ahalyapur at Ch 0.00 Km to Ch 1.00 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of road from Joyshree to Dhananjoy Para at Ch 2.40 Km to Ch 3.56 Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of Khedacherra PHC approach Road 0.20 Km under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM 3, Carpeting, Seal coating, Pucca drain etc.
Development of roads from 1 TD road to Assam Border from Ch.0.00 Km to Ch.0.16 Km Total length 0.16 Km and 2 TD road to Kanajuri from Ch 0.70 km to Ch 0.80 km Total length 0.10 km under Damcherra Sub Division PWD RandB during the year 2026 27. SH
Development of Road from Thumsarai Joyshree Road to Serechandra Para from CH.0.00 KM to CH.1.00 KM Total Length 1.00KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH Jungle clearing, WBM III, Carpeting, Seal coating, Surface Dra
Development of road from TD road to Assam Border from Ch.0.16 Km to Ch.0.47 Km Total length 0.31 Km under Damcherra Sub Division PWD RandB during the year 2026 27. SH Earth work, WBM 3, Paver Block, C.C etc.
Development of Road from TD Road to Radhakishorepur via Balicherra from CH.0.00 KM to CH.1.00 KM Total Length 1.00 KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Pucca Drain, Surfac
Development of road of Vanghmun PS approach road 1.050 Km under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Development of Road from Jalabassa to KCP Road to Picnic Spot from CH.0.00KM to CH.1.00 KM Total Length 1.00KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH Jungle clearing, WBM III, Grouting, Carpeting, Seal coating, Pucca Dra
SH Clearing n grubbing road land, Maintenance of earthen shoulder, Surface drain, side shoulder concreting on rain cut portions, GSB,WMM,Tack coat, carpeting, seal coat etc.
Development of Road from TD Road to Paiza Basti via Forest Range Panchayat office from CH.0.80 KM to CH.1.60 KM Total Length 0.80 KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Puc
Road development of the road from Suknacherra to Khargajoy para from CH. 0.00 km to CH.1.10 km Length 1.10 km under Dasda R.D. Block during the year 2026 2027 SH WBM, carpeting, Seal coating, Pucca Drain etc.
Development of Road from TD Road to Paiza Basti via Forest Range Panchayat office from CH.0.00 KM to CH.0.80 KM Total Length 0.80 KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Puc
SH WBM, carpeting, Seal coating, Pucca Drain etc.
Improvement of road from Khowai Chowmuhani-Bijoynagar road to Agartala-Simna road via Munda Tilla during the year 2025-26/SH Box cell, Retaining wall, GSB, WBM-II,WBM-III, Prime Coat, Tack Coat, Carpeting, Seal Coat, etc.(L-1.463 km)
Development of Road from Thumsarai Hmunpui Road to Natun Para from CH.0.00 KM to CH.1.10 KM Total Length 1.10 KM under Damcherra Sub Division, PWD R and B during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Surface Drain, Pucca d
Road development of the road from KN road to Suknacherra Satnala TSR camp road via Jagadish Nath house from CH. 0.00 km to CH.0.80 km Length 0.80 km under Dasda R.D. Block during the year 2026 2027SH WBM, carpeting, Seal coating, Pucca Drain etc
Development of Road from I DK Road to Monacherra Panchayat office from CH.0.00 KM to CH.0.24 KM Total Length 0.24 KM and ii DK Road to Chandra Kr. Para from Ch 0.00 km to 0.70 Km Length 0.70 Km under Damcherra Sub Division, PWD R and B during the yea
Road development of the road from Dangacherra TSR camp to Fulgunoy para via Ramchandra para from CH. 0.00 km to CH.1.20 km Length 1.20 km under Dasda R.D. Block during the year 2026 2027 SH WBM, carpeting, Seal coating, Pucca Drain etc.
Development of roads from 1DK road to KGVB hostel approach from Ch.0.00 Km to Ch.0.40 KmTotal length 0.40 Km, 2 DK road to Tabjirai para from Ch 0.90 km to Ch1.50 km Total length 0.60 km under Damcherra Sub Division PWD R and B during the year 2026
Development Of the road from Rabindranagar to Shibnagar, under Jampui Hill Sub-Division, PWD(RnB) during the F.Y. 2026-27 SH WBM,Tack coat, re-carpeting, seal coating, Pucca n Kacha drain etc
Development of Road from i TD Road to Hingskang Panchayat office from CH.0.00 KM to CH.0.045 KM Total Length 0.045 KM and ii TD Road to Chowkiderpara from Ch 0.00 km to 0.70 Km Length 0.70 Km under Damcherra Sub Division, PWD R and B during the year