Loading…
Loading…
1,534 results • Latest
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Patch Metaling, grouting, and PMC etc
Metaling, grouting, and PMC etc
Patch repairing by patch metaling, grouting, and patch carpeting, sand seal coating etc
Patch WBM, Patch Grouting, Re-Carpeting and Seal Coat and Protection Works etc
Patch WBM, Patch Grouting, Re-Carpeting and Seal Coat and Protection Works etc.
Recarpeting, Patch WBM and Grouting, Surface drains, stripping, Road side pucca drain and palasiding work etc
Development of road from Jambura vivekananda club to nag shop L1.2 k.m Ch. 600.00m to Ch. 1200.00 m under PWD RandB Khowai Sub Division during the year 2026 27SH WBM PMC seal coat Road side pucca and surface drain etc. G 2
Development of road from Jambura vivekananda club to nag shop L1.2 k.m Ch. 0.00m to Ch. 600.00 m under PWD RandB Khowai Sub Division during the year 2026m 27 SH WBM PMC seal coat Road side pucca and surface drain etc. G 1
OR of the road from Hatimara A to Hatimara B L1.70 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III Re carpeting seal coat protection work etc.
Carpeting, metaling, grouting, seal Coat, Brick work etc.
Supplying installation testing commissioning of 250 KVA DG set with AMF panel and relocation of old 125 KVA DG set including necessary accessories College of Fisheries Tripura
Mtc of different PWD road within Amtali PWD (RnB) Sub_Division during the year 2026_27_SH_Patch soling, palasiding, mtc of pucca drain, placing of gunny bags etc with other allied works
Hiring of Vehicle 1(one) Maruti Omni/ECO manufacturing year 2024/2025,( Preferably white), in good working condition, by the fuel with commercial registration of the vehicle along with 1(one) driver for the use of The SDO, PWD (RandB), Karbook Sub-Di
Periodical repair of road from Dukhia Chow para to Nabadwip Chow para L 0.760 km under Padmabil Block 24 Ramchandraghat constituency during the year 2026 27 SH Patch metalling Recarpeting seal coat Surface Drain etc.
Grouting, Carpeting, Tack Coat, Seal coat and surface draing
Grouting, Carpeting, Tack coat , Seal coat and Surface drain
Mtc. of road from (i) Bagajatin Club (TK road) to Gopal nagar (L-0.44 Km.), (ii) TK Road to Gopal Nagar via Ramkrishna Ashram (L-0.32 Km.) under Kalyanpur Sub-Division PWD(RandB)/SH- CC road, Protection Work at ch-0.35 km etc. during the year 2026-27
Mtc of road i) Sonamura Boxanagar road to IBB road via samar smriti Milanayatan(L0.562 KM) ii) Somarstriti PWDRoad to Eidgha maidan (L 150m) during the year 2024 25 SH construction of pucca drain and paver block etc and other allied works
RENOVATION OF EI WORKS IN PANISAGAR TOWN HALL, PANISAGAR, NORTH TRIPURA
Providing Internal Electrification (conceal type) and fire detection system of 50 bedded Drug De-Addiction Centre at Khowai District Hospital, Khowai Tripura.
Development of Satnala Bazar internal road Group-II under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB , Paver Block etc.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 2.00km to Ch 3.00km.
Development of Anandabazar market road Group I under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB , Paver Block etc.
Development of Anandabazar market road Group II under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB, Paver Block etc..
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.000km to Ch 1.500km.
Development of the road from Anandabazar to Anandabazar HS School Part I under Dasda Sub Division, PWD(RnB) during the year 2026 27 SH WBM 3, Carpeting, Seal Coat etc.
Development of road of Satnala bazar internal road Group III under Dasda Sub Division, PWD RnB during the year 2026 27 SH Paver block, GSB,etc.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000 km to Ch 1.00 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.000 km to Ch 1.600 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000km to Ch 1.000km
Development of Satnala Bazar internal road Group I under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB , Paver Block etc.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000 km to Ch 0.700 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000 km to Ch 1.100 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000km to Ch 1.000km
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000 km to Ch 1.000 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000km to Ch 0.800 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.00km to Ch 2.10km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.00km to Ch 1.00km.
SH Plastering,tiles work , water proofing treatment,ceiling,wood works, sanitary, plinth protection, painting etc.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 3.000km to Ch 4.000km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 2.000km to Ch 3.000km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.000km to Ch 2.000km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000km to Ch 1.000km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.00km to Ch 2.00km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.00km to Ch 1.00km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 0.000 km to Ch 1.000 km.
SH WBM 3, Carpeting, Seal Coat etc portion from Ch 1.000 km to Ch 2.000 km.
Providing Installation and commissioning of High wall Split WindowCassetteFloor mounted Split type Air Conditioning system as and when urgently required in different areas AGMC GBP Hospital for 01 year period