Loading…
Loading…
1,534 results • Latest
Maintenance of road from EPIP to Rajarbandh to SaniTala GB road to Rajarbandh School via R.D. Store (L 3.00 km ) under PWD(R and B) Khayerpur Sub-Division during the year 2026-27 SH Grouting, patch carpeting, palasiding work, road side pucca..
Maintenance of road from Banikya Chowmuhani to Growth centre via Veterinary college(L 3.00 Km) under PWD(R and B), Khayerpur Sub-Division during the year 2026-27 SH Patch Bituminous Concrete, Seal coating by rubber brush and other allied works..
Maintenance of road from Amtali Senpara to up to GB road cremation ground via Nepali basti, Paschim Noabadi PHC (L 2.30 km ) under PWD(R and B) Khayerpur Sub-Division during the year 2026-27 SH Patch metalling, grouting , re-carpeting and sand seal..
Maintenance of road from Bridhyanagar (Opposite to AIR Station) to Howrah foot bridge up to newly constructed work under the jurisdiction of Khayerpur Sub-Division, PWD(R and B) during the year 2026-27
Maintenance of different roads under the jurisdiction of Khayerpur PWD(R and B) Sub-Division during the year 2026-27 SH Brick line pucca drain, RCC cover slab, Patch grouting, Patch carpeting and other allied works. (Group- II)
Maintenance of road during the year 2026_27_ Maintenance of the road from Pragga Bidya Building to Adv Hare Krishna Bhowmik house and other adjacent roads under AMC ward no_12 _SH_ Patch WBM3, Carpeting and other allied works.
SH- WBM Gr-3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain during the year 2026-27.
Development of roads for various roads under AMC Ward No.5 and 7 under construction sub division _III _SH_ WBM, Grouting, Carpeting, Seal coat and other allied works.
Development of Various road under AMC Ward No 6 within Divn_III PWD(RandB)_SH_ soling, WBM_III, Edging Carpeting and other allied works.
SH-Construction of 2 nos Box-cell, Pucca Drain, Brick soling etc. during the year 2026-27.
Development of Road from GB Motor Stand to Aravinda Degree College via SCERT within Divn_III PWD (RandB) _SH. soling, WBM_III, Edging Carpeting and other allied works.
PROVIDING I.E. WORKS IN I.P.H.L., AT DHARMANAGAR, SH-PROVIDING AND FIXING OF PANEL FOR MECH. EQUIP. AND PROVIDING E.I. OF ADDITIONAL ROOMS THEREOF
Construction of 15 Nos Non-Type and Type VI quarters at Agartala,West Tripura SH Building portion including Internal water supply, sanitary installation, Sewage and drainage and Internal electrification works. SH Modification of roof top by prov
Supply and installation of LED luminaries and Panel lights replacing the old conventional fittings in corridors Court rooms and various other offices in the High Court Premises Agartala Tripura_Balance work thereof 3rd Call
Patch repairing, Carpetting and allied works during the year 2026-27
Patch repairing, Carpetting and allied works during the year 2026-27
Patch repairing, Carpetting and allied works during the year 2026-27
Missing Soling,Metalling, carpeting and allied works etc. during the year 2025-26.
RCC Works.
Re-carpeting, Patch WBM and Grouting, Stone Seal Coat, Surface drains and Stripping Works etc.
Improvement of road from Paschim Rajnagar High School to Utlabari old NEC road under Tulasikhar RD Block L 2.65 Km SH GSB WBM II WBM III Drainage and Protection work. Group I from Ch.0.00 to Ch.1.325 Km 2nd Call
SH- widening, Soling, WBM-II, WBM-III, Carpeting etc.
Construction of Divisional office building G plus 1 storied with foundation for G plus3 storied of PWD R and B at Bishalgarh Sepahijala District Tripura SH Providing concealed internal electrification work thereof
Construction of the Residential Office Building at Honble Chief Ministers Bungalow Shyama Prasad Mukherjee Lane Agartala West Tripura for Official Staff of CMs Residential Bungalow SH Providing concealed internal electrification work thereof
Construction of 08 Nos of New Residential Qtrs for Judicial Officers of various Grade at Bishramganj SH Installation of Inverters post top yard lighting and power input to main panel including internal electrification of 2 nos security room
Special repair to E.I at non residential buildings of PWD under the jurisdiction of I.E Sub Divison No II Agartala West Tripura
Maintenance of different roads under Mandwi Sub-Division during the year 2026-2027 SH Patch Grouting, Patch Carpeting, Construction of surface drain etc. and other allied works. (Group-IV)
Construction of Entrance Gate for Agartala Government Dental College IGM Hospital North Side during the year 2023-24 SH Providing IE Work thereof
Maintenance of different roads under Mandwi Sub-Division during the year 2026-2027 SH Patch Grouting, Patch Carpeting, Missing soling, Construction of surface drain etc. and other allied works. (Group-II)
Maintenance of different PWD roads within Champaknagar Section under Jirania Sub-Division, PWD (R and B) during the year 2026-27 SH Patch Grouting, Patch Carpeting,Seal coat, Patch Soling, Stripping of Excess Soil, Pallasiding, Gunny Bags etc.
Maintenance of different roads within Jirania Section under the jurisdiction of PWD(R and B) Jirania Sub-Division during the year 2026-27 SH Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil..
Mtc. of different roads at Mohanpur section under the jurisdiction of Jirania PWD (R and B) Sub-Division during the year 2026-27 SH Patch Grouting, Patch carpeting, Tack coat, Seal coat, Earth filling, Drainage work and other allied works etc.
Mtc. of different PWD roads within Ranirbazar section under the jurisdiction of PWD(R and B), Jirania Sub-Division during the year 2026-27 SH Grouting, Soling, Rubbish, Mix class bats, Gunny bags, Palasiding, Stripping of excess soil..
SH- WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27.
Side shouldering, clearing of road side berm construction of pucca drain paver block work,
Grouting, paver block PMC etc.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27.
Patch soling, wbm-III, patch carpeting, paver blocks
SH- Launching of Bailey type unit bridge in place of damaged Boxculvert at ch. 3.01 km including construction of approach road during the year 2026-27.
Construction of abutment for installation of Bailey Bridge at Pal para over Rangapnia cherra
Clearing of rod side drain, road side berm, patch grouting, patch carpeting etc.
Improvement of road from Kanchanpur - Jalabassa road to Laljuri - Machmara road via Joysree VC under Laljuri R.D. Block. (under RIDF-XXXI of NABARD during the year 2025-26)
Earthwork, C.C. work, Brick work, R.C.C. work, Hardrawn, Truss and G.C.I. sheet roofing etc.
Earthwork, C.C. work, R.C.C. work, Plaster work, Tiles work, Truss and G.C.I. Sheet roofing etc.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27 (2nd Call).
SH-Removal of Soil, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works, paver Bock etc. during the year 2026-27 (Gr-I)
Construction of 15 nos Non Type and Type VI quarters at Agartala West Tripura SH Building portion including internal water supply Sanitary installation Sewage and Drainage and Internal Electrification works SH Balance Electrical Works thereof
Repairing and modification of Internal Electrification for different wards including the maintenance of existing IE works of Dhanwantari building ABV RCC Hospital Agartala Tripura W
Patch metaling, grouting, PMC, Flat Brick soling, protection work, Gradient upgradation etc