Loading…
Loading…
1,534 results • Latest
Providing and mtc of internal electrification works at family quarter Type III and replacement of underground cables of different wards of Kendriya Sansodhanagar Bishalgarh
Construction of 480 seated EMRS at Pravapur Jampuijala Sipahijala District SH Providing internal electrification of 02 nos kitchen room attached to boys and girls hostel
Annual maintenance Contract AMC for periodical servicing of 2 nos 380 KVA DG Sets and 01 no 82_5 KVA DG Set installed at LOK BHAVAN Capital Complex Agartala West Tripura for the year 2026_27
Proposed construction of central ware house at CMS Shyamalibazar Agartala Tripura SH Providing installation testing and commissioning of fire firefighting systems in Central Ware house at CMS Shyamalibazar Agartala Tripura west 2nd Call
Development of the road from Officetilla near I.S Office to Khowai Officetilla road Hemanta Mukherjee Sarani L 400m under PWD RandB Khowai Sub Division during the year 2026 27 SH WBM, PMC, Seal Coat, Protection work etc.
Providing and installation of toughened glass for walling of existing Gazebo located on terrace of Lok Bhavan, Agartala under Capital Complex Sub-Division-I, PWD Buildings , Kunjaban Extension, Agartala.
Road Development
WBM-II, Carpeting, Pucca drain etc.
WBM, PMC, Seal Coat and Construction of R.C.C Base for installation of Height Barrier etc
Road Development
Operation and Upkeepment of different pumps and motors at Tripura Legislative Assembly and Secretariat building, High Court building, New Raj Bhavan and Chief Justice Bungalow Quarter Complex at Kunjaban during the year 2026 27 under PWD Capital Co
Road Development
Development of road from Mundabasti to Sheoratali L 3.00 Km from Ch. 0.00 Km to Ch. 1.50 Km under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM, Carpeting, Seal Coat, CC Block etc
WBM, Grouting, 20mm PMC, Seal Coat etc
Development of road from Mundabasti to Sheoratali L3.00 Km from Ch. 1.50 Km to Ch. 3.00 Km under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM, Carpeting, Seal Coat, CC Block etc.
Development of road from Khowai Office Tilla to Champahour Road Via Ganki Food Godown L420.00 mtr. under PWD RandB Khowai Sub-Division during the year 2026 27 SH Earth work, GSB, WBM, BM, BC, protection work etc.
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Protection work and road side pucca drain etc
Repair and maintenance of windows and ventilators including fixing of grills at the Medicine Block within AGMC and GBP Hospital premises, Agartala.
Improvement of road from Gonda Twisa- Raishyabari Road to Sadainanda para road (L - 4.218 km) under Dumburnagar RD Block, Gonda Twisa Sub-Division.
Construction of Vice_chancellors Bungalow, Guest House and Multi_facility Playground in the campus of MBB University at Agartala West Tripura under PM_USHA during the year 2025_26_Building portion including internal water supply, sanitary installatio
Mtc. of different roads under the Jurisdiction of 5th Circle, PWD(RandB)/ Hiring of MandM Scorpio for office of the Superintendent Engineer, 5th Circle, PWD (RandB), Jawharnagar, Dhalai Tripura during the year 2026-27 (Model not earlier than 2020).
Plaster work, Wood work, Painting, Water supply and sanitary installation and allied works.
Earthwork, C.C. work, R.C.C. work, Tiles work, Plaster work, Truss and G.C.I. sheet roofing etc.
Plaster work, wood work, Painting, water supply and Sanitary installation and allied works.
SH Patch Soling WBM Carpeting Seal coat pucca drain and other allied works
Development of road from Binan kobra to Basuram para(L040) under (L 0.10 Km) under 11-Mandaibazar Assembly Constituency.
Development of road from Kuiyachand bari TSR Camp to Satpara (upto Girja) (L - 1.00 Km) under 11-Mandwibazaar Assembly Constituency
Development of road from Ranirbazar cattle market to PHC chowmuhani (Total length 0.81 Km) under 10-Majlishpur Assembly Constituency SH Grouting, metalling, re-carpetting, seal coat..(L 0.41 km, from Ch.0.40 km to Ch.0.81 km) (Gr-II)
Development of road from Mandai road (S. N. Colony) to Kaiyachanbari (Length 1.30 Km) under 10- Majlishpur Assembly Constituency SH Patch metalling, BM, Carpeting, road side pucca drain..(Gr. II) (Ch 0.50 Km to Ch 1.30 Km - Length 0.80 Km)
Development of road from Kaiyachan bari road to Kathal bagan (L 2.80 Km) under 10- Majlishpur Assembly Constituency SH Patch metalling, BM, Carpeting, road side pucca drain..(Gr. - II) (Ch 1.40 Km to Ch 2.80 Km - Length 1.40 Km)
Development of road from PWD road near Natun Bazar to Bardhaman Thakur Para via Belapur Para (L 2.20 Km) under 05- Khayerpur Assembly constituency.
Development of road from Kaiyachan bari road to Kathal bagan (L 2.80 Km) under 10- Majlishpur Assembly Constituency SH Patch metalling, BM, Carpeting, road side pucca drain, retaining wall..(Gr. I) (Ch 0.00 Km to Ch 1.40 Km - Length 1.40 Km).
Development of road from Mandai road (S. N. Colony) to Kaiyachanbari (Length 1.30 Km) under 10- Majlishpur Assembly Constituency SH Patch metalling, BM, Carpeting..(Gr. I) (Ch 0.00 Km to Ch 0.50 Km Length 0.50 Km).
Development of road from Nalgoria Bazaar to tulakona Panchayet Office (L- 3.00 km), under 05-Khayerpur Assembly Constituency.
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- III (Three). (Road to be repaired from Ch. 3.00 km to 4.50 km..
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- II (Two). (Road to be repaired from Ch. 1.50 km to 3.00 km ..
Development of road from Ranirgaon (Karaibon) to Jarulbachai road via Keprampara, Bagbari, Dukhiakobra para and Bhabania para (L 9.56 Km) under 05- Khayerpur Assembly constituency Group- I (One). (Road to be repaired at Ch. from 0.00 km to 1.50 km..
Development of road from Ranirbazar cattle market to PHC chowmuhani (Total length - 0.81 Km) under 10-Majlishpur Assembly Constituency SH Grouting, metalling , re-carpetting, seal coat..(L 0.40 km, from Ch.0.00 km to Ch.0.40 km) (Gr-I)
Development of road from Subalsing to Lewang bazar at ch 3.00 km from massive erosion of local cherra due to flood during the year 2026-2027/SH- Manufacturing and placing of cement concrete block and procurement of flood flighting materials and emer
Providing Installation and commissioning of Split type High wall Air Conditioning Machines and repairing Maintenance of existing AirConditioning Machines at RIPSAT Agartala during the year of 202425
Development of different roads required prior to durga puja during the year 2026-27/SH- Clearing jungle, brick soling, earth filling, brick bats, bamboo palasiding, patch repairing, surface drain, placing of gunny bag etc Gr-I
Providing installation and commissioning of Fire Fighting system in the newly constructed Community Health Centre CHC Jirania under West Tripura District
Development of road from Panchabati to natunbazar (Length-2.0km) during the year 2026-27/SH- Return wall, brick soling, WBM-III, carpeting, drain etc.
Development of different roads required prior to durga puja during the year 2026-27/SH- Clearing Jungle, brick soling, earth filling, brick bats bamboo palasiding, patch repairing, surface drain, placing of gunny bag etc. Gr-II
Sal Ballies post, Gabian structure, flat brick soling, Metalling etc.
SH Patch Soling WBM Carpeting Seal coat pucca drain and other allied works
Repair/Maintenance/ Installation of New Pump Motor at all the Pump Houses at 79 Tilla Qtr. Complex of AGMC and GBP Hospital during the year 2026 -2027(2nd Call).
Development of road from Shalbagan Bazar to CPWD office gate during the year 2026-27/SH- Grouting, Carpeting, Seal Coat etc.(L-0.785km)
SH Patch WBM Grouting Recarpeting and allied works