Loading…
Loading…
280 results • Recent activity
Repairing of steel gate, hoist arrangement, track roller along with other allied works
Repairing of pump house priming tank etc. for L.I Scheme at (i) Sindhukpathar Annadhan Roaja Para (ii) Bhuratali Bangali Para (iii) Sindhukpathar Old Scheme and (iv) Sindhukpathar Konjuri Mog Para
Anti-erosion work along the bank of Khowai River for protection of Sarkar Para under Darikapur GP Kalyanpur RD Block, W.R. Sub-Division Teliamura of Khowai District during the year 2023-24/SH- Protection work with cement concrete block (L-_450.00 m).
Anti erosion work along the bank of Khowai river for protection of Ghilatali under Ghilatali GP, Kalyanpur RD Block, WR Sub-Division, Teliamura ..2024-25/SH_ Protection work with Cement Concrete Blocks (1_4_8). (Length _ 200.0 mtr).
Construction of 48 Flood Protection Anti-erosion structures in 06 districts of Tripura Anti-errosion work of Kasba East LI Scheme of Kasba GP under Bishalgarh RD Block from the erosion of Local cherra for the length of 75 mtr Right and Left Bank
Repairing and rewinding of horizontal and submersible pump motor including allied works.