Loading…
Loading…
20,828 results • Latest
Repairing of differential mounting system, rear suspension assy of WS28KL Water Sprinkler Sl. NO. 28113 / WS395 and 28132 / WS401. Rep. of Rear Suspension and its mounting and anchor pin of BH60M Dumper Sl. NO. 3640 / D11062 at SDOCM, Dhori Area.
Supply of Water Sprinkler of not less than 28KL capacity
Scanner (V3) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Construction of Kothaghara at Arkil Village under CSR of Kaniha Area
Repairing of 7 nos. of VCB (11KV and 3.3KV) for protection and safety of electrical equipments installed at main 11KV/3.3KV sub-station , CRS Barkakana.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Hiring of One 01 Diesel Operated Vehicle Toyota Innova or equivalent 2393 CC or Above; AS PER THE ATC; 2780 KM Monthly Running; A/C; 12
Repairing/ Overhauling clutch plate, gear box assembly, PTO pump and Air compressor assembly. and king pin assembly of Hywa JH10AE-2367 of Moonidih Coal Washery.
Repairing/ Strengthening of base frame of drive assembly (gear box, motor and drive drum) along with replacement of its coupling of Unit 801-A conveyor belt at Moonidih Coal Washery.
MAKING APPROCH ROAD FROM EXISTING ODR ROAD TO PROPOSED NEW COLONY, PROVIDING AND FIXING BOUNDRY PILLARS ALONG WITH CLEARING OF BUSHES AND GRASS AND 01 NO INFORMTORY SIGN BOARD AT KOCP UNDER KA
Repairing/ Strengthening of damaged structural members of junction house adjacent to washery building comprising of unit 801-B and C-2 belt conveyor at Moonidih Coal Washery.
Repair of Drain work of CEWS Gevra.
Construction of Protection Wall and Road Widening at Narrow and Turning Portions of Diversion Road (Kumunda Bridge to Kankrei), between Mines and Singada Nallah , of Hingula OCP under Hingula Area.
Repairing/ Strengthening of conveyor belt structure including its posts, stringer channel, bracing angle and deck plate for Unit 701 and 702 belt conveyor at Moonidih Coal Washery.
Internal Combustion Engine Crankcase Oilsfor Automotive Application (V2) Conformingto IS13656 (Q3)
OPERATION AND MAINTENANCE OF 02 NOS ETP AND 01 NOS WHEEL WASH SYSTEM AT KOCP UNDER KA. FOR A PERIOD OF 730 DAYS
AMC/CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System
Replacement of tail drum assembly and snub drum assembly after dismantling of existing worn-out drum for Unit 801-A and 704 belt conveyor and refitting of all its accessories of Moonidih Coal Washery.
Repairing/ Replacement of reclaim feeder rack, gate and adjoining receiving cum collecting chute under middling Silo and Silo no.3 at Moonidih Coal Washery.
Replacement of brake shoe, repairing of both side brake assembly, brake booster, fabrication and fitment of tilt cylinder hose and tube cover for Dozer Sl. No. 11902
Dismantling and Repairing of feed and discharge chute of unit 616-1 and 616-2 along with their allied pipelines at 18M floor of Washery Building at Moonidih Coal Washery.
Dismantling and re-erection of 16 meter High mast tower along with repair of existing high mast tower at different places of Lingaraj Area
Metal Storage Cabinet (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Repairing of differential wheel assembly and center pin assembly of LnT make Pay-loader, model-9020, Sl. No. 1230 of Moonidih Coal Washery.
Day to day cutting and welding work involving rail cutting , emergent breakdown , reapiring like SDLs bucket repair , chain repair , idler frame repair , clip etc. at 7/8 incline of Dhori Khas Colliery for 01 year period .
Store requisition issue note, Leave encashment form, Store requisition slip, store ledger, FORM D monthly/weekly, Store Register, HEMM LOGBOOK, Notice PAYSLIP RECEIVING REGISTER (FOR DOB), Application/Object receiving register(FOR DOB), Details of checking Register(FOR DOB), Flat File, Cover File, Tag File, Paper Pin, Stapler Pin- NO 10, Stapler machine No.- 10, Stapler Machine No.- 24/6, Stapler Pin – 24/6, Gems clip, Pencil Refill(RED/BLUE), Office Pen, Whitener, Stamp pad, Stamp pad ink, Gum Pot, Eraser Cloth Duster, Pencil carbon Small, Pencil Carbon, BIG Ruled Register( 192 page), Arch File, White Paper, Ruled Paper, Envelope, Punching Machine
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service, Hiring of Mobile crusher for crushing of ROM coal discharging (-) 100 mm size crushed coal at stockpiles of Durgapur OCM including feeding arrangement through ..
Shot Firing Cables (foruseotherthanin Shafts) ISIMarkedto IS5950 (Q2)
Complete repairing of two nos. 275 HP, 3.3KV, 3 Phase Auto Transformer starter panel at NSOCP
Overhauling of the RO plant with statutory replacement of consumable items, i.e., membrane, carbon, gravel, and spun filter of the 2000 LPH RO plant installed at the transit camp behind the PO office and the new Pit office at intervals of 06 months,
Provision of Temporary Canteen-cum-Dining with a Room for CISF under Amrapali OCP of A-C Area, CCL.
Monsoon plan of NSOCP Ph-II and Ph-IV of NSOCP under Kunustoria Area
Repairing n rewinding of 1 MVA, 11KV/3.3KV Power Transformer of NSOCP under Kunustoria Area
Repairing Rewinding of HT Motors of various capacities (ie 600KW, 650KW, and 750KW) followed by testing
Repairing of cables and related parts of of Russian Shovel sl no. 521 of ABOCP Mine of Block-II Area
Providing and Fixing Roof Ridges in Electrical, Machine and HAR Sections and Replacement of Old Gutters with New Gutters in Engine Transmission and Rehabilitation Sections at Central Workshop IB Valley
Repair of damaged Transformers due to thunderstorm, different location under Kunustoria Area
Preparatory work for ministerial visit at Jagannath Area.
Supply, Installation and Commissioning of CCTV Surveillance System at Creche, CMPDI RI-IV Nagpur
Custom Bid for Services - Repairing and RTO passing Work of truck mounted dust suppression Vehicle no MH34BZ2344 of MOCM Similar Category Operation And Maintenance Of Other Machines And Plants
Repair and maintenance work after dismantling of gear box installed at Drive shaft of Rotary Breaker unit 203-A at ROM Section of Moonidih Coal Washery.
Collection of Iron steel materials from different stores, regional stores and other agency for Moonidih Coal Washery.
Dismantling, Repairing/ Strengthening and Replacement of damaged parts of Unit 203-A Rotary Breaker along with alignment of its complete body at ROM Section of Moonidih Coal Washery.
Painting of outer surface of EKG 10 Shovel at ABOCP Block-II Area .
Digital Medical X-Ray Films (V3) (Q2) (PACOnly)
Changing of damaged and worn-out Electromag screen WP-1 screen hanging structure/ rubber pad structure at Washery Building of Moonidih Coal Washery
REPAIRING AND MAINTENANCE OF C9 DRAIN NEAR C PATCH C V AREA.
mechanical repairing of weighbridge platforms on as and when required basis for the period of 1 year at Sayal- D Project (B-S Area).
Cleaning of 05 nos. 10 cu.m Shovel (3 nos. Rope Shovel and 2 nos. Hydraulic Shovel) on labour charge basis as per current labour rate for 730 days
Cleaning and repairing of 06 nos radiators applicable for RT9130-120T, RT880-70T-02 nos, RT-30T-02 nos, RT620 Huskey Cranes.
Repairing/ Overhauling of Engine, king pin, hanger, leaf spring and wheel greasing of TATA make Hyva JH10AE-2825 of Moonidih Coal Washery.