Loading…
Loading…
3,458 results • Latest
Procurement of Fire Fighting Canvas Bucket Fire fighting
Procurement of SAfety MAterials
Repairing of winding engine of no. 6 pit of Porascole West Colliery
Installation of keps and girder at pit no. 2 of Central Kajora Colliery
Repairing of 500 kVA, 11 kV/440 V transformer installed at POB plant under Kajora Area
Lowering of 150-meter head,550V submersible pump-motor set along with 6-inch dia MS Pipe (16 Nos in borehole) at new borehole near Siduli 5 number pit by CL Jambad Colliery under Kenda Area and joining of 6 inches dia MS pipes (500 meters approx.)
Extension of 3.3 KV overhead line erection from CL Jambad Power substation to Siduli 5 No New Borehole Site for submersible operation for water supply arrangement of nearby village
DRILL SPARES
Construction of 14 nos closing preparatory Isolation stopping depillaring panel-21 at Satgram Incline
Comprehensive AMC of 05 Nos. of Road Weighbridges at various locations under Bankola Area for floating open tender enquiry.
Construction of 02 nos. air crossing required for proposed depillaring panel BSP-13 in R-VI (Bogra) Seam of J. K. Nagar Colliery
Whitewashing along Travelling Roadway in R-VIII Nega Seam at Nimcha Pit No. 3 and 4 under Nimcha (R) Colliery
Drilling of 05 ( five) nos of NX size borehole and rimming of 02 ( two) nos borehole upto 140M ( 300mm dia) at Satgram Incline
Repairing of isolation stoppings in Satgram (R-V) seam at Chapui khas Colliery
Construction of 10 Nos. Ventilation Stopping at proposed depillaring Panel-22 at Satgram Incline
Hiring of tractor mounted (without diesel) single stage belt driven centrifugal pump/diesel operated pump (01 Set) fitted on same bedplate/base of nominal discharge from 35LPS to 75 LPS with head 22 to 48 Mtr., with suction pipe for dewatering of SNC
Procurement of Lubricants
Changing of damaged sheet of CHP drive and trippler shed worstly damaged by storm of Parbelia group under Sodepur Area.
Repairing of Qtr. no BEQ/05/10 at Saheb Para of Parbelia Colliery of sri Hareram Singh, Mechanical Fitter of Parbelia Colliery of sodepur Area.
Salvaging of Various Electrical equipment in different places of Madhaipur Colliery and Installation of 500KVA,11KV/550V Transformer at Madhaipur Colliery
Repairing of 01(One) no of Volcano make 6 stage pump and Repairing of 01 no Pluro-II 6 stage pump at south samla unit of MSAM Colliery and REPAIRING OF 01 NO ROTODYNE 6 STAGE PUMP FOR MANDERBONI UNIT OF MSAM COLLIERY
Repairing of chute and allied fittings by fabrication work for smooth coal handling at Mini CHP of Pit No. B and 2 under Pandaveswar colliery, Pandaveswar Area
Changing, Repairing and maintenances of Cable Work, Gang Operating Switch etc at Manderboni Colliery.
Repairing/ Rewinding of one 250 KW, 3.3KV, 1480RPM, Bharat Heavy Electrical Ltd. Make, Motor Sl.No. AC-11132H4D at Khottadih OCP under Pandaveswar Area
FABRICATION, SUPPLY and FITTING OF D BLOCK and SHAFT FOR THE USE IN RETURN PULLEY OF ENDLESS HAULAGE AT MANDARBONI COLLIERY UNDER PANDABESWAR AREA
Preparation of roof bolts by threading for Khottadih colliery
Repairing of existing Cage Catcher at all four nos. of A-B and 1-2 Pit for safe and smooth winding operation to comply DGMS violation under Pandaveswar colliery, Pandaveswar Area
Fabrication and replacement of chute at 1.2belt discharge and Miscellaneous Conveyor Jobs at Khottadih Colliery
Repairing of winding engine drum brake and other allied fittings at Pit No. B and fabrication and fitting of 4 set of GM bushes for cross head piston cylinder at pit no. A for safe and smooth winding operations under Pandaveswar colliery, Pandaveswar
Making of 06(six) nos of vulcanizing joint in 1000mm steel cord belt of Khottadih Colliery
Epoxy Straight Through Jointing Kit as per IS-10333: 1982, suitable for 6.6KV 3 Core, 120 SQMM Cable
Construction of 08 Eight nos. of P.C.C. ventilation stopping in between 27 EL and 28 EL off 1 dip to 8 dip in 2/7 incline of Shampur-B Colliery.
Item schedule 1, Item schedule 2, Item schedule 3, Item schedule 4, Item schedule 5, Item schedule 6
Repair and renovation works at Bungalow 01 related to change of occupancy under Kunustoria Area, ECL
MISCELLANEOUS STORE MATERIAL 910
OEM Pump Spares IPB 150X200 4 and 5 Stage from Wilo
HEAD SHIELD, FACE SHIELD, VOLT DETECTOR, WEB SLING, TEST KIT, W SPRINKLER, PALLET
Annual maintenance of VVIP Bungalows (as and when required basis) for a period of two years under ECL HQ.
Repair or replacement or shifting of various IT related equipment along with installation of Capture and play back card at Bankola Area.
Dismantling, transportation, unloading and assembling of 01no BG-825 Motor Grader, sl no- 25108 from Kunustoria Area to Nakrakonda Kumardih B OCP, Bankola Area.
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Strengthening of Embankment against Pusai River at Chapapur Colliery under CB Group of Mines, Mugma Area.
1. Erection and construction of illumination circuit 2. 550V overhead line erection at CLJ OCP 3. Renovation and extension of 3.3KV overhead line 4. Cleaning of 5 nos electrical substation 5. Supply and fitting of 60 nos of street light
1. Diversion of OH lines near Sal Danga 2. Extension of 3.3 KV OH Line at Dhulbad 3. Installation of 11KV-440V Transformer HT -LT switch 4. supply installation of Pole Tower Light 5. Urgent extension of 11 KV and 550V OH Line
Renovation of domestic overhead lines of length approx. 2.5km of colony under JK Pit of Siduli Colliery
Engagement for contractual manpower for firefighting at active fire zone near Quarry 2 for period of 180 days of New Kenda Colliery, Kenda Area
Miscellaneous repairing of Diesel Bowser and Engine Assembly SN WB39C1413 of CL Jambad OCP Kenda Area
Miscellaneous repairing of REL C650 Drill Machine Sl No 6021635 of CL Jambad OCP