Loading…
Loading…
18,058 results • Latest
Construction of Bal Bhawan in Distt. Charkhi (Pdg, Solar Power Plant Only)
Construction of Govt. College for Girls, Mangali, District Hisar (Pdg. 30 KW Rooftop Solar Power Plant Only)
INSTALLATION OF SOLAR ENERGY SYSTEM WITH BATTERY 1. 4 KW IN GHANGAS PATI CHOUPAL AT VILLAGE DHAKAL BLOCK NARWANA 2. 5 KW IN PRIMARY SCHOOL AT VILLAGE KALWAN BLOCK UJHANA 3. 5 KW IN AMBEDKAR LIBRARY AT VILLAGE KHANPUR BLOCK
Repair and Renovation of Manhole Chamber, Hiring of Suction Tanker, repair of sewer line of various sizes damaged during laying of Storm Water pipe line in Zone-II in MC Sirsa
Construction of toilets near HDFC ATM Gaushala road, ward-02, MC Mahendergarh.
Widening and Strengthening of Road
PROVIDING SEWERGE FACILITY and 2.00 MLD STP .
AUGMENTATION OF W/S SCHEME BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE SHAMGARH DISTRICT KARNAL
Forestry works
Providing and Fixing RCC Drain Covers over Existing Drain from Saini Sabha to Dholposh Ashram Disposal Point and from Nathuwala Chowk to Panchmukhi Hanuman Mandir, MC Mahendergarh
Construction of boundary wall in slaughter house in MC Sohna
Forestry works
Construction of Government Women College at village Padha (Assandh) in Karnal District. (Balance Work) (CM Announcement No. 20951 dated 10.04.2018 (Re-invited)
Installation of Gazibo in ward No. 23 at MC Kaithal (RECALL)
Collection and Carriage of Stone Chipping 13.2mm to 11.2mm gauge and Stone Metal 53mm to 22.4mm gauge at Ambala Cantt store for providing patch work on various roads under Provincial Division No.2, PWD BandR BR., Ambala Cantt during the year 2026-27
Collection and Carriage of Stone Chipping 13.2mm to 11.2mm gauge and Stone Metal 53mm to 22.4mm gauge at Adhoya store for providing patch work on various roads under Provincial Division No.2, PWD BandR Br., Ambala Cantt during the year 2026-27.
Estimate for laying RCC pipe for making temporary path at RD 900 Hadwa Gangoli Link Drain.
Providing of PVC Barricade, Traffic Cone, Caution Tape at various Location under MCG Jurisdiction. (Re-Call)(EE-HQ)
A/Mtc. Sewerage Scheme Narnaul Town, District Mohindergarh for the year 2026-27-
IEC activities under SWM IEC and Other in MC Mahendergarh
Balance work M40 of Pataudi road from Umang bhardwaj chowk to gadoli puliya in ward no 9 division 1A UNDER MCG
E-Tender for Supply Medicine and Consumable (PMMA Intraocular Lens (6mm) 19.50, 20.50,21.50,22,22.50, Blade 2.8, Inj. Mitomycin 20mg etc.) at KCGMC, Karnal
Construction of RMC -40 road, Laying of 400mm dia Sewerage line and 100mm dia Water Supply Pipe line at revenue rasta near Kila Colony in Village Badshahpur, Ward No. 18, Division-1B, Zone-1 under MCG.(Re-Call)
Forestry works
Reconstruction and repair of streets at various street in ward no 12 at MC Kalanaur
Diversion of water supply line at F Block Booster in Ward No. 4 Division 3 A under MCG. Re-call
Plantation Work at Kail Plant in Municipal Corporation, Yamunanagar-Jagadhr (FOR L/C SOCIETY LTD)
Providing Food and Catering Servicies during Research Conclave day 2026
Upgradation of sump well in Ward no. 4 Division 3A under MCG. Re-call
Providing and fixing 600 LPM and 110 mtr head submersible pumpset and all other works contingent thereto at tubewell inside main water works Tohana Town.
Estimate for SITC of VRV Air conditioning in classroom of 2nd and 3rd Floor (prefab room) of Computer Science and Engineering Department in the J.C. Bose University of Science and Technology YMCA Faridabad.
Maint of Plantation Campa Scheme in Madlauda Block
Maint Campa Scheme in Panipat Block
Pdg. Emergency Rescue Device (ERD) for 04 lifts installed at New PWD Rest House Gurugram
Providing of Food and Catering Services during Convocation 26
A/mtc water supply
CONSTRUCTION OF COMMUNITY CENTRE AT SECTOR 19, MC FARIDABAD.
Constructing VR Bridge RD 515 Badola Minor
Barsalu Const of ILPB street and drain etc
construction of Hall near general( Rajput) choupal in Village Batour, Block Barwala, District Panchkula (MPLADS)
Construction of Community hall at sector-14 faridabad ward no-35
Construction of Community Centre in sector-16, Ward No 36, Old Faridabad
Construction of 550 Sft. area Quarter and Re-construction of Boundary Wall in the Campus of PWD Rest House at Gharaunda in Karnal Distt.(Re-invited)
Yamuna Nagar Town, Construction of Pump Chamber at Patashgarh, District Yamuna Nagar. under District Plan 2026 2027 Construction of Pump Chamber of size 8 x 10 at Patashgarh and all other works contingent thereto.
CONSTRUCTION OF COMMUNITY CENTRE AT BOOSTING STATION SECTOR 10 and11, MC FARIDABAD.
CONSTRUCTION OF COMMUNITY CENTRE AT SECTOR 16A, MC FARIDABAD.
Construction of Community Centre at Sector 9 ward no 37 Faridabad
Annual Repair for 4 Nos. Staff Quarters in the Premises of S.E Karnal Circle PWD BandR BR. Karnal Distt. for the Year 2026-27 (Re-invited)
Construction of IPB road Pardeep kabadi Ambala road to hshop of Sanjiv Bakshi in ward no. 13.(Recall)