Loading…
Loading…
4,731 results • Latest
Annual maintenance of sewerage Scheme in Sector - 14, U/E, Sonipat
Annual maintenance of Public Health Services for Sector - 14, U/E, Sonipat.
Annual maintenance of Public Health Services in Sector - 15, Urban Estate, Sonipat
Annual maintenance estimate for public health services in Sector - 13, U/E, Sonipat
Annual maintenance of Public Health Services for Sector - 15, U/E, Sonipat
Annual maintenance estimate for public health services in Sector - 13, U/E, Sonipat
Annual maintenance estimate for public health services in Sector - 7, Urban Estate, Gohana
Annual maintenance of Water supply and sewerage scheme in Sector - 23, U/E, Sonipat
Annual maintenance of internal roads in Sector - 7, U/E, Sonipat
Annual maintenance of Public Health Services for Sector - 7, U/E, Sonipat
HEW 77 Supply, cartage, installation, testing and commissioning of 1 No. 4 KVA inverter with 4 Nos. tubular batteries i.cbattery rack/stand, DC/AC cables, connectors, testing and handing over, as per site requirements and directions of EIC.
Estimate for improvement of Water Supply Scheme in Sector 17 I UE Jagadhri Installing of 2 nos TWs of size 250mm x 200mm with discharge of 12000 Glns. to 15000 Glns per Hrs. and all other works continent thereto complete in all respect (Includ
Improvement of Parks including Repair of toe wall, Construction of Cement Concrete Footpath and Rain Shelter and all other works contingent thereto in various parks in Mandi Township Kosli (Rewari). (Including three years defect liability period free
Annual Maintenance of Water Supply and Sewerage Scheme in Sector 6 Dharuhera 2026-27
Annual maintenance estimate of Master Water Supply Rewari for the year 2025-26
Construction of Nursing College at Sadat Nagar, Rewari
UP-GRADATION AND STRENGTHENING OF INFRASTRUCTURE (SEWERAGE) INTERNAL AND EXTERNAL STORM WATER DRAINAGE, CONSTRUCTION OF ROADS, ELECTRIFICATION AND 15 MLD CETP INDUSTRIAL SECTOR-21and26, BHIWANI (REVISED)
Rough Cost Estimate for Construction of Roads, Providing and laying of Water supply, Sewerage and SWD lines for development of 1 MARLA plots under Mukhyamantri Awas Yojana (MMSAY) in Julana Jind (DEPOSIT WORK)
ANNUAL MAINTENANCE ESTIMATE FOR WATER SUPPLY AND SEWERAGE SCHEME IN SECTOR-6P, HANSI (2025-26) (iv)
A/ mtc estimate for water supply scheme in sector 6,7,8 9, U/E Jind.
A/mtc estimate for sewerage scheme of sector- 13P Hisar for the year 2025-2026.
Annual maintenance estimate of Boosting station in Sector -11 extn.,Jind.
A/ Mtc estimate for roads in City Center Bhiwani for the year 2025-26.
A/mtc of external sewerage scheme in Urban Estate, Jind.2025-2026
A/mtc of internal SWD Scheme in Sector-6,7,8,9 Jind 2025-2026.
A/mtc of Sewerage Scheme in Sector-65, Faridabad. Pro. and laying of 200 MM dia HDPE pipe in-front of plot No. 2523, Sector-65, Fbd. complete in all respect and all other works contingent thereto.
ANNUAL MAINTENANCE OF INTERNAL WATER SUPPLY SCHEME IN SECTOR-1and4 HISAR (2025-26
Clean. and desilting of 200 mm, 300mm, 400 mm, 600mm, dia chocked sewerlines using bucket type sewer cleaning machine complete in all resp. in Sec 56A and Ashiyana Scheme, Fbd and all other works contingent thereto incl.1 year mtc. and defect libilit
A/ Mtc estimate for roads in City Center Bhiwani for the year 2025-26.
A/Mtc estimate for Roads in Sector-8, Charkhi Dadri for the Year 2025-26
A/mtc estimate of 15 MLD STP Zone-III, Hisar for the year 2025-2026
Annual Maintenance Estimate of Sewerage Scheme in Secor 27and28A Hisar 2025-26.
Work of hiring of Super Sucker machine including cost of diesel, driver and operator with sewer man/ helper complete in all respect for cleaning of internal sewerage network of Sector-9A, Bahadurgarh and all other works contingent thereto
Work of hiring of Super Sucker machine including cost of diesel, driver and operator with sewer man/ helper complete in all respect for cleaning of internal sewerage network of Sector-6, Bahadurgarh and all other works contingent thereto
Providing and Laying of 90mm HDPE Tertiary Water Line near Sky School and near Community Centre in Sector 21 Panchkula
Development of Parking in front of N.H and Clinic sites adjoining GH 111 in Sector 20 Panchkula
Repair and Replacement of D.I Pipe 500mm dia with M.J Collar 500mm dia in N.H Slip Road in Village Majri Sector 2 Panchkula
AMtc of Town Park in Sector 34 UE Ambala Cantt Deployment of Security guard and Sweeper for toilet block at Town Park complete in all respect and all other works contingent thereto
IProviding and Laying Shifting of Sewerline near GH 6 and TWell No. KV 6 Green Belt in Sector 20 Panchkula
Repair and Renovation of CBD Sewerage in Sector 12 A Panchkula
Providing U/G Cable, Street Light and Poles to replace existing life lived / damaged / missing cable and poles on dividing road of Sector 6-7, Sec. 7-8, Sec. 8-9, Stadium-Sec. 9 Road, outer road Sec. 7, Sec. 8, Sec. 9, STP and Water Works at Jind
HEW 113 Repair and jointing of Missing/Damage water supply line from various locations in Sector-76, 77 and 78 Faridabad and all other works continent thereto
HEW 115 Providing and fixing of RCC planks with RCC Column for Boundary wall in Sector-20A, Faridabad and all other works contingent thereto.
K-4 A/mtc of EPHS in various Sector UE Karnal
Supply and placing liquid chlorine and providing and fixing of Dozer
Prov. 200 KVA T/F, HT/LT line and street lights in recently vacated area in sector-8, Panipat
AMtc of EPHS in Sector 8 9 and 10 UE Ambala City and Sector 3 and 4 Naraingarh Job work of attending complaints of sewerage and attending complaints of water supply line operation and watch and ward of Canal base water works complete in all respect
AMtc of EPHS in Sector 1 Jail Land and 7 UE Ambala City and Sector 32 and 34 Ambala Cantt Job work of attending complaints of sewerage and attending complaints of water supply line operation and watch and ward of Canal base water works contingent the
Empanelment of Chartered Accountant Firm for the period 01.04.2026 to 31.03.2027 in Gymkhana Club, Sector-6, Panchkula.