Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
18,480 live8,242 closing this weekmost from Central Railway and Western Railway
18,480 results • Latest
Provision for reliability improvement and upkeep/sustaining of various components/parts of Medha make EI at 04 stations (SBNR, RMSR, APH, KYNT) in SOG-APH sections over Bikaner division
SUPPLY OF WASH BASIN TAP FOR LAVATORY OF VB CHAIR CAR COACHES MAKE: JAQUAR MODEL: ORP-CHR 10037 PM (OR) MAKE: M/s HINDWARE Model: F36004CP OR SIMILAR SUITABLE FOR VB CHAIR CAR COACHES.
Kit 6 YLY for ELGI RR66101W Compressor consists of 54 items as per Annexure enclosed.
ANGULAR CONTACT SPRING COMPLETE FOR PC-8 [ANGULAR CONTACT SPRING COMPLETE FOR PC-8 RELAYS (FIXED CONTACT) AS PER ABB DRG.NO. INA 516497-R2.]
Jabalpur- Construction of new Running Room having capacity of 80 beds at JBP under Assistant Divisional Engineer (HQ) Jabalpur sub-division.
HVN-66 INSULATING LINER FOR USE WITH WIDER PSC SLEEPER TO DRAWING NO. RDSO/T-8746 SUITABLE FOR 60KG (UIC)/ 60E1 & 52 KG RAILS (APPLICABLE FOR DRAWING NO. RT-8751).
AMC of Medha make 180KVA Static inverter (SIV) fitted in DLSN/SPJ based electric Locomotives as per RDSO'S SMI no. RDSO/2016/EL/SMI/0291 (REV"0") dated 21/06/2016 for three years with OEM on single tender basis.
Battery operated brushless motor rail bolt tightening device
TRANSFORMER OIL DISSOLVE GAS ANALYSIS, GAS EXTRACTION APPARATUS COMPLETE SET CONSISTS OF GLASS FITTING VALVES ALL CONNECTING TUBING AND PVC TUBING AND STAND
Heavy Repair to RE officer rest house at jhansi under ADEN/HQ-II/JHS.
Provision of new station building in lieu of old deteriorated, and provision of new water supply and drainage system at TTO on ASR-KEMK section under ADEN-II/ASR
ESD WORKSTATION IN 40 X 40 ALUMINIUM EXTRUSION WITH ESD POWDER COATING 1000L X 750W X 750H ALONG WITH FOOT STAND AND THE POWER SWITCHES WITH THE WHITE BOARD. INCLUDING INSTALLATION AND COMMISSIONING AT SITE. MAKE/BRAND: G G ELECTRONICS OR SIMILAR.
Augmentation/upgradation of facilities & infrastructure in various lobbies/Crew depots including logistics and furnishing and misc items at JHS division.
Supply and commissioning of Light weight towing trolley set
Grit Blasting & Painting of ICF/LHB Bogie frame including it's components and Shot Blasting/Shot peening & primer painting of coil springs of ICF Bogie at Kharagpur workshop
Set of glass for cab meters for 3- Phase locomotive as per drawing no.TRS/GMO /E4/ 3PH/048.ECR
Cleaning of Traction Motor Blower filters, Machine room blower filters, oil cooling blower roof dynamic filter with radiator and Hotel load filter of 3 phase WAP-7 Electric Locos at Electric Loco Shed, Santragachi for two years.
Compressed Oxygen Gas confirm to IS: 309/2005(Fourth revision).
SHELL GADUS S5 V42 P2.5 GREASE FOR AXLE BOX BEARING OF WAG-9 LOCO
Display board made of aluminium composite panel