Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
18,087 live7,743 closing this weekmost from Central Railway and Western Railway
18,087 results • Latest
Brake gear arrangement of WAG7 loco (Except brake cylinder) with Pin &bushes (In Bogie Set) as per CLW Drg. No.06/1/19/108 Alt.4 .Quantity & specification as per Annexure 'A' attached. Mn Steel Pins & bushes should be as per IRS:R-65.
OHE Modification work against S&T/FZR's Sanctioned work under PH-29 in c/w Provision of Integrated Power Supply System (IPS) at 60 Nos. mid section interlocked L-xing Gates over Firozpur division.
Running Contract for Inj.Carboplatin 150 mg in Vial Packing.
Madurai Division : Replacement of damaged Elastomeric bearing in PSC bridges in Br.no 2210, 2202, 2234 (PUU-QLN) 29, 60, 68 (TEN-TCN) 288(VPT-MNM) & 57 (DG- PLNI) - Total 8 Nos.
SOLE BAR Length-2400 mm Material & Specification:- IRS M-41/97 Gr.I ( as per Annexure - XII of RDSO/2011/CG/CMI-01,amndt.-1 & 2) Drawing No. : - RDSO/SK-CG- 10101 alt. (nil) .
Tungsten Carbide Circular Saw Blade 180 mm dia X 2.5 mm width X 60 Nos. of Teeth X 25.4 mm Bore Dia. H.W. Make- BOSCH or Similar.
SSE / P.way / SCT section - Annual maintenance of track in between SNKL-TSI-EDP and KKY-TSI stations for a period of Two year.
Design, manufacture, supply at site, erection, testing & commissioning of heavy duty passenger Elevator (Lift) of 20 persons (1360 Kgs) capacity complete with all associated accessories and safety devices.
Madurai Division: Improvement to Platform surface in TYM, CTND, SUX and SQD station (NSG6 - 4 stations) under SSE/Works/KKDI
Tender for Running Contract for SEALED MAINTENANCE FREE VRLA BATTERY SET OF 60 CELLS (STACKABLE), IN COMBINATION OF 55+5 CELLS FOR SMPS BASED INTEGRATED POWER SUPPLY SYSTEM, EACH CELL OF 2 VOLT/300 AH CAPACITY
Madurai division :Obtaining authentication for the existing leftover Railway land plans, reconstructing missing Railway land plans, and obtaining certification from the State Revenue Department authorities.
Operation and maintenance including spare parts during repair of Inoculum Generation Plant, capacity of 100 cubic meter capacity at Carriage Repair Workshop, Harnaut for three years.
Supply of 4 star or above 280-300 Liter capacity frost free Refrigerator with eco-friendly refrigerant , 01 year machine warranty & 10 year compressor warranty
JACK FOR GOVERNOR INJECTOR LINKAGE as pe [JACK FOR GOVERNOR INJECTOR LINKAGE as per Drg. No. MT01GM0140 ALT B]
LED Light Fitting for Berth Reading Light ( Transverse lower berth - LHS) for LHB Coaches
1. Hygrostat Sensor (52266726) 2. Servo Motor for Return Air Outlet (Damper Motor) (52266727)
Coupling Dummy F-3 as per EMD Part No.80 [Coupling Dummy F-3 as per EMD Part No.8029839. Warranty Period 30 months from the date of Supply.]
Supply Set of Preventive maintenance items required for Engine of Make Perkins, Model no-4006D-E23TAG2P, SL No: DGBF0171S17514G of 750 KVA Gen-set . 1) FUEL FILTER (Primary)-5172762:PK-6nos. 2) FUEL FILTER (Secondary )-5381439:PK- 4nos. 3) OIL FILTER-4324909:PK-6nos. 4) COOLANT INHIBITOR-21820263:PK-40liters
Augmentation of water supply arrangement at Adityapur (ADTP) Railway Station (2nd Call).
Nut hex lock -5/8-11-nylok to EMD part n [Nut hex lock -5/8-11-nylok to EMD part no 8032747,DLW Pt. no-19350326.]
Disc (O.D. 160mm) for LHB Drawing No. : ICF Drg. No. AAA05058, Alt.-d. or latest Material & Specification: As per drawing.
Additional Work of Phase-I for development of RRP (Rairangpur) station under ABSS.