Loading…
Loading…
4,380 results • Latest
Protection work along the Left bank of river Poro for a length of 1200M. at Foskadanga Chapatali area,G.P. Banchukamari within Block-Alipurduar-I, P.S Dist Alipurduar.
Supplying of Skilled labour for collection of Gauge reading at Amgachia(I) Section in Block- Patashpur-I, PS.- Patashpur Dist.- Purba Medinipur.(3rd call)
M/R to Daspur Sluice (Single vent) over Kaliaghai Right Embankment in GP.-Bishnupur, Block and P.S- Sabang and Dist.- Paschim Medinipur.(3rd call)
Raising of old Kaliaghai bank near Gopalpur Primary School at Gopalpur in GP.- Gopalpur, Block- Patashpur-I, PS.- Patashpur, Dist.- Purba Medinipur.(3rd call)
Restoration of Amgachia sluice (Double vent)over kaliaghai Right embankment at Amgachia in GP.- Amarshi-II, Block- Patashpur-I, PS.- Patashpur, Dist.- Purba Medinipur.(3rd call)
Protection work along the Right bank of river Garam for a length of 1000 M. at Satkodali, G.P. - Banchukamari within Block- Alipurduar- I, P.S Dist-Alipurduar.
Restoration of Wooden Bridge over Ragunathpur Khal near Chuan para,GP.- Paldhui Block- Ramnagar-II, in Dist.- Purba Medinipur.(SSM)(3rd call)
Restoration of Wooden Bridge at Katmundi Khatibari, G.P.-Maitna, Block- Ramnagar-II, in Dist.- Purba Medinipur.(SSM) (3rd call)
Stacking Earth filled polythene bags for flood emergency at Sea hawk (old Digha) in PS- Digha Mohana in Block- Ramnagar-I in Dist.- Purba Medinipur.(3rd call)
Stacking Earth filled polythene bags for flood emergency at Dewli Bungalow in PS- Ramnagar in Block- Ramnagar-II in Dist.- Purba Medinipur.(3rd call)
Raising and Strengthening of left bank of Singda khal for a length of 250.00 mtr. Block- Patashpur-II, PS.- Patashpur in Dist.- Purba Medinipur.(3rd call)
Restoration of Wooden Bridge at Chakchairani over Chunkhuti Khal at GP.- Mathura in Block- Patashpur-II in Dist.- Purba Medinipur.(3rd call)
Re-Construction of Wooden Bridge at Jhawa Nayakpara over Branch of Mirjapur Khal at GP.- Bamunia, Block- Contai-II, PS.- Junput Coastal in Dist.- Purba Medinipur.(3rd call)
Re-Construction of Wooden Bridge at Bilashpur near PNB over Contai Nala at G.P.- Kusumpur, Block- Contai-III, PS.- Marishda in Dist.- Purba Medinipur.(3rd call)
Re-Construction of Wooden Bridge at Raniora over Contai Nala at GP.- Kusumpur, Block- Contai-III, PS.- Marishda in Dist.- Purba Medinipur.(3rd call)
Re-construction of wooden bridge at Fatepur over Panipia Khal at GP.- Nayaput, Block- Contai-I, PS.- Junput Coastal in Dist.- Purba Medinipur.(3rd call)
Strengthening of country side slope of sea dyke at Tiyakola Bhogpur (Length of work-200.00mtr.) at GP.- Dariapur in Block- Deshapran and Dist.- Purba Medinipur.(3rd call)
Repairing Maintainance of Wooden Bridge at Kumorpara over Mogra Khal at G.P.- Sarda in Block- Deshopran, P.S.- Contai and Dist.- Purba Medinipur.(3rd call)
Repairing Maintainance of Wooden Bridge at Sukunia Primary School over OCC canal at Mouza-Sukunia, G.P.- Kumirdah in Block- Contai-III, PS.- Marishda and Dist.- Purba Medinipur.(3rd call)
Restoration of slip at R/B of Rasulpur River for a length of work 50.00 mtr at Mouza-Uttar Dihimukundapur, GP.- Amtalia in Bock- Deshopran P.S.- Contai and Dist.- Purba Medinipur.(3rd call)
Repair and maintainance of three vented sluice near Bhaitgarh Section office over OCC canal at Bhaitgarh Mouza, GP.- Kanaidighi in Block- Contai-II PS.- Marishda, Dist.- Purba Medinipur (3rd call)
Restoration of Wooden Bridge at Rangamatia over Argoal Drainage Canal at G.P.- Argoal in Block- Patashpur-II, and Dist.- Purba Medinipur.(3rd call)(SSM Portal)
Repair and Maintenance of Different Sluice at Hingcha, Paschim sarpai, Kousalya, Kandramari, chimankhabar Dakhin Nischinta over left nad right bank of Balighai Main Drain in GP.- Boraj, Bagachauli, Block- Bhagwanpur-II,Contai-III, PS.- Bhupatinagar
Restoration of Slip at left bank of Itaberia khal for a length of work 75.00 mtr. at Mouza- Itaberia, G.P.- Mathura, Block- Patashpur-II, P.S.-Patashpur, and Dist.- Purba Medinipur.(3rd call)
Supplying and Staking Earth filled Cement bags for emergency at Mouza- Kazipatna, Block- Patashpur-I, PS.- Patashpur, Dist.- Purba Medinipur.(3rd call)
Supplying of labour for operating Baromile Lock Gate under Egra(I) sub-Division in Block- Egra-II PS.- Egra, Dist.- Purba Medinipur.(3rd call)
Supplying of Skilled Labour for taking Gauge reading at Sonakania River Gauge.(3rd call)
M/R to the Wooden Bridge at Kultikiri near Mandalpara over Kultikiri Canal in Mouza- Dubda, G.P.- Paniparul, Block- Egra-II, PS.- Egra, and Dist.- Purba Medinipur.(3rd call)
M/R to the Wooden Bridge at Bahalia over OCC Khal in GP.- Jumki, Block- Egra-I, PS.- Egra, and Dist.- Purba Medinipur.(3rd call)
M/R to the Wooden Bridge at Tamalda over Panchrol Canal in Mouza- Sonapada, G.P.- Panchrol, Block- Egra-I, P.S.- Egra, and Dist.- Purba Medinipur.(3rd call)
Restoration of Bank Slip of Baghai Embankment (RB) at Ch. 22.10 km (Total Length of work 48.00 mtr.) at Mouza -Maheshpur, Block- Patashpur-I, PS.- Patashpur, and Dist.- Purba Medinipur. (3rd call)
Restoration of Bank Slip of Baghai Embankment (LB) at Ch. 8.60 km (Total Length of work 80.00 mtr.) at Mouza -Shashinda, Block- Narayangarh, P.S.- Belda, and Dist.- Paschim Medinipur. (3rd call)
Restoration of Bank Slip of Baghai Embankment (RB) at Ch. 8.30 km (Total Length of work 60.00 mtr.) at Mouza -Shashinda, Block- Narayangarh, P.S.- Belda, and Dist.- Paschim Medinipur. (3rd call)
Restoration of Bank Slip of Baghai Embankment (RB) at Ch. 23.00 km (Total Length of restoration 51.00 mtr.) at Mouza -Ayma Barbaria, Block- Patashpur-I, P.S.- Patashpur, and Dist.- Purba Medinipur.(3rd call)
Restoration of Bank Slip of Baghai Embankment (RB) at Ch. 21.70 km (Total Length of work 49.00 mtr.) at Mouza -Amarpur, Block- Patashpur-I, PS.- Patashpur, and ,Dist.- Paschim Medinipur. (3rd call)
Restoration of Bank Slip of Baghai Embankment (RB) at Ch. 18.50 km (Total Length of work 35.00 mtr.) at Mouza- Kallubar, Block- Patashpur-I, PS.- Patashpur, and ,Dist.- Paschim Medinipur. (3rd call)
M/R to Sundarban Embankment in between 4.300 KM to 4.550 KM at mouza Kumirmari facing Left bank of river Sarsa in Block - Gosaba, P.S.- Sundarban Coastal, Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 7.350 KM to 7.620 KM at mouza Dayapur facing left bank of river Gomor in Block - Gosaba, P.S.- Gosaba, Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to damaged S/E in between 0.00 km to 0.15 km for a length of 150 metre near confluence point of R/Hogol, Hana and Kartal along the right bank of river Hogol at M/Hogolduri in Block Basanti, P.S.- Basanti, Dist. (S) 24 Pgs Under JID
M/R to damaged Sundarban Embankment in between 5.49 Km. to 5.65 Km for a length of 160 mtr. at mouza Sonakhali along the Right bank of river Hogol in Block and P.S. - Basanti, Dist. - South 24 Parganas under Joynagar Irrigation Division.
M/R to S/E in between 3.300 KM to 3.467 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba Dist-South 24 Pgs under JID.
M/R to damaged wooden bridge over Laskarpur Khal outfalling to river Matla near Jharkhali Bunglow at Mouza-Laskarpur in Block- Basanti, P.S.- Jharkhali Costal, Dist.- South 24 Parganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 2.690 KM to 2.830 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba, Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 5.000 KM to 5.200 KM at mouza Kumirmari facing Right bank of river Bagna in Block - Gosaba, P.S.- Sundarban Coastal, Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 6.500 KM to 6.660 KM at mouza Amlamethi facing right bank of river Gomor in Block - Gosaba, P.S.- Gosaba Dist-South 24 Paraganas under Joynagar Irrigation Division.
Maintenance and repair to Sundarban Embankment in between Ch. 16.870 km. to Ch. 17.260 km. at mouza Budhakhali, Block Canning-I, P.S Canning, Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to damaged Sundarban Embankment in beween Ch.31.0 km and Ch. 33.0 km for a length of 200m at mouza Choto Banashyamnagar facing river Chalchera under Patharpratima Irrigation Sub- Division of Kakdwip Irrigation Division within block patharprati
Strengthening of Bank protection work along the left Bank of river Teesta for a length of 2000 m at GP Kuchlibari Block Mekliganj DistCoochbehar
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.2026 to 15.08.2026 in between Ch.38.975 KM to Ch.39.125 KM for a length 120.00 Mtr. at mouza - Paschim Surendranagar facing river Saptamukhi (L/B)
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.2026 to 15.08.2026 in between Ch.22.300 KM to Ch.22.500 KM for a length 70.00 Mtr.and 2 Nos. ghoges repairing at mouza - Uttar Gopalnagar facing river