Emergent restoration to sundarban embankment damaged due to New moon kotal from 11.08.2026 to 15.08.2026 for a length of 50 M from Ch. 10.200 Km to 10.250 Km at mouza-Krishnanagar on left bank of Phuldubi Khal under Sagar Irrigation sub-Division
Emergent restoration to sundarban embankment damaged due to new moon kotal on and from 11.08.2026 to 15.08.2026 for a length of 100M at mouza -Companyer Char in Block- Sagar facing left bank of Bharateswari khal under Sagar irrigation sub-division
REMOVAL OF DIPOSITED EARTH INBETWEEN CH 0.00 and CH 130.00 OF DY-10 AND OFFTAKE OF MINOR I and MINOR II OF DY-10 OF KSMC UNDER KIRNAHAR IRRIGATION SUBDIVISION BLOCK NANOOR DIST BIRBHUM
Emergent Restoration of Sundarban Embankment damaged due to Full Moon Kotal occurred on dated - 31.07.26 facing River- Bidyadhari (R/B) at a strech near house of Barun Mondal for a length 76.00 m, Mouza-Kharihat Abad, G.P.-Boyermari-I , Block-Sandes
Emergent restoration of Sundarban Embankment Bantala Sluice damaged occurred on dated 31.07.2026 during the Full Moon kotal facing River Bidyadhari (L/B) for a length 100.0 m, Mouza-Nazat G.P.- Nazat-II , Block- Sandeshkhali-I of Haroa Irrigation
Emergent restoration of Sundarban Embankment damaged occurred on dated 29.07.2026 during the Full Moon kotal near Uttar Baunia Primary Vidyalaya facing River Bidyadhari (R/B) for a length 125.0 m, Mouza-Baunia Abad, G.P.- Nazat-I , Block- Sandesh
Emergent restoration of Sarkargheri Sluice damaged occurred on dated 29.07.2026 during the Full Moon kotal facing River Bidyadhari (L/B) Mouza- Boyermari , G.P.- Nazat-II , Block- Sandeshkhali-I of Haroa Irrigation Sub-division under Basirhat I
Emergent restoration of Sundarban Embankment Damaged due to Full Moon Kotal occurred on 29/07/2026 at facing River- Metia (R/B) near Bholanath Patra fishery for a length 55.00 m, Mouza- Mohanpur, G.P.-Mohanpur, Block-Minakhan of Haroa Irrigation Su
Additional flood protection work at Paschim Ratanpur for a length of 280 m at the countryside of the Ring Bundh under GP Bilaimari, Block Ratua-I, Dist Malda.
Emergent Restoration of Sundarban Embankment Damaged due to Full Moon Kotal on 31.07.26 facing River- Bidyadhari (R/B) at a strech near Landmark of Bamanpukur Sluice for length 30.00 m, Mouza - Bamanpukur, G.P.- Bamanpukur, Block- Minakhan of Haroa I
Emergent Restoration of Sundarban Embankment damaged due to Full Moon Kotal occurred on dated - 31.07.26 near HO Rabi Sardar facing River- Chotokalagachi (R/B) for a length 252.00 m, Mouza-Bermajur, G.P.-Bermajur-II , Block-Sandeshkhali -II of Haroa
Emergent restoration of Sundarban at two different locations for total length of 785.00m,damage occurred on 01.08.2026 at Mouza-Monipur, G.P.- Monipur, Block- Sandeshkhali-II along R/B of river -Raimangal under Kalinagar Irrigation Sub-division of B
Emergent restoration of Sundarban Embankment at five different locations for a total length of 909.00 m damage occurred on 31.07.2026 at Mouza-Tushkhali and Atapur, G.P. - Korakathi Monipur respectively, Block- Sandeshkhali-II along R/B of river -C
Palliative restoration work to the right bank of river Ganga Padma for a length of 1050 m providing slope pitching and 15m length porcupine spur 30m interval at village Radhakrishnapur G.P- Sekendra and Bilborakopra, Block Raghunathganj-II and
Supply of labour watching and guarding and regulating the cross regulator gate at Ch1245 Ch1468.00 Ch1532.00 of PBC during Khariff Irrigation 2026 Block PS- Bhatar Dist.- Purba Bardhaman under Ramchandrapur (I)Section of Guskara (I)Sub Division
Desiltation of outside field channel of KNI Airport for a length of 0.50 Km in Block P S Andal, Dist. Paschim Bardhaman
Collection of soil samples from different rivers of the North Bengal rivers for undertaking sediments load study on an urgent basis for a period of 1 year to be conducted by the River Research Institute
Repairing, mainte work by Oiling, greasing and replacing of damaged parts, EM brake, dial indicator glass etc of Duak Barrage its head regulator gates inclu 43 nos regulator gates at different locations of DNMC at Block- Chopra and Islampur.
M/R to S/E in between 0.00 km to 0.200 km at M- Purba Sripatinagar Facing R/B of R- Thakuran Under JID in Block and P.S. Patharpratima, Dist. South 24 Parganas for the year of 2025-26 (Lat. -21.826209, Long. -88.49345) (2nd call)
M/R to Sundarban Embankment facing Sibua at Mouza - Dk. Kashinagar for a length of 400 m from 18.36 km to 18.76 km Block and P.S. - Patharpratima, Dist. - South 24 Parganas under Joynagar Irrigation Division. .(2nd call)
M/R to S/E from 6.33 KM to 6.45 KM for the length of 120 M at M -Sagarmadhabpur Facing L/B of R - Gobadia Under JID in Block and P.S-Patharpratima, Dist. - South 24 Pgs for the year of 2025-26. .(2nd call)
Construction of new sluice over left embankment of river Kalua at mouza Abad Gangadharpur of P.S Dhola and Block Patharpratima District South 24 Parganas.
PreMonsoon Maintenance repair work of VT pumps and allied mechanical work at Additional Uttarbhag pumping station under MDMD Distric South 24 Parganas during the year 202627
M R To 4 Nos Sluice Gate With Necessary Accessories Civil Work At Mz- Ramnagar Abad, D.K Durgapur, Purnachandrapur, Indranarayanpur Facing River Gobadia , Mridangabhanga For The Year 2026-27 Under JID S24 pgs (2nd call eNIT_05_Sl32)
MR To Sluices At Mz-Purbadwarikapur,Laxmijanardanpur, Maheshpur, Kumarpur, etc for the year 2026-27 under Joynagar (I) Division, Block, PS- Patharpratima, Dist- South 24 Parganas.(2nd Call to original eNIT-WBIW/EEII/JOY/NIT- 5(e)/2025-26, Sl-29)
MR to Sundarban Embankment at Mz-Nagenabad facing river-Gurakhal inbetween 28.700 km. to 29.000 km. in Block - Kultali, P.S - Maipith coastal under Kultala (1) Sub-Division Dist. S24 pgs Under JID.(2nd Call of eNIT_05(e)_25-26_Sl_28)
PreMonsoon Maintenance repair work of VT pumps and allied mechanical work at Keorapukur pumping station at PS Regent Park District South 24 Parganas during the year 202627
Supply of emergency flood fighting materials for the year 2026-2027 under Joynagar Irrigation Division. Block,P.S.-Patharpratima, Dist-South 24 Parganas. (2nd Call to original eNIT-WBIW/EEII/JOY/NIT- 5(e)/2025-26, Sl-24)
Anti-erosion work to the right bank of river Mahananda including improvement of bank slope for protection of river bank from EjabulHoque house to HamidurRahaman house for a length of 400 m at Raninagar, Block-Ratua-II, Malda (2nd Call).
M R to Sundarban embankment for a length of 300.0mtr (57.80-58.10) at mouja-Kuemari Facing River-Nakchara, for the year 2026-27 under Joynagar Irrigation Division, Block,PS- Patharpratima, Dist-South 24 Parganas.(2nd Call eNIT_05_EEII_25_26, Sl_22)
Premonsoon maintenance and repair of allied mechanical works and electrical installations such as Relay LT Starter control panel including allied works of inclined pump at Kalagachia ward no142KMC and centrifugal pump at Kabardanga ward no144K
Premonsoon maintenance and repair of VT pumps and allied mechanical works of 3rd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Premonsoon maintenance and repair of VT pumps and allied mechanical works of 2nd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Premonsoon maintenance and repair of VT pumps and allied mechanical works of Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Premonsoon maintenance and repair of VT pumps and allied mechanical works of Chowbhaga Pumping station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Irrigation Precautionary Measure for Salboni Branch Canal (S.B.C) in between Ch. 0.00 to Ch. 400.00 in connection with Rabi Irrigation during FY 2026-27 under Tilaghagri Section of Kangsabati Canals Division No.-I, Amlagora, Paschim Medinipur
Clearing and removing weeds floating water Hyacinth inbetween Ch 0 and Ch 403 of Metekhal, inbetween Ch445.85 and Ch712 of River Koushiki, inbetween Ch350 and Ch495 for Dy. N3 Canal, in between Ch215 and Ch.- 396 for Dy K1etc under CISD.
Protection work along right bank of river Fulahar from 21.5 KM to 21.90 KM of Bhutni Diara circuit embankment for a length 400 M at Aladia within GP- Uttar Chandipur, Block - Manikchak, P.S- Bhutni, Dist.- Malda
Operation Maintenance of 20 nos. Regulator gates 2 Nos. on Dy. N3, 5 Nos. on K1, 6 Nos. on K1A, 4 Nos. on Metekhal 3 Nos. on River Koushiki for Kharif Irrigation Period 2026-27 including maintenance of upstream downstream of the gates under CISD
Premonsoon maintenance and repair of HT electrical installations such as switchgear transformer VCB HT Relay ACB control panel including allied works of 3rdACPS CPSACPS2nd ACPS at Paschim Chowbhaga PS Anandapur District South 24 Parganas duri
M/R to canal bank at different straches inbetween Ch0 Monirumbati Head Regulator Gate and Ch 476 Jiara at LB and RB side of Dy D1 Canal for a length of 50.00 mtr. during Kharif Irrigation peroid in Block P.S.- Dhaniyakhali Tarakswar under CISD
Premonsoon maintenance and repair of HT electrical installations such as switchgear transformer VCB HT Relay ACB Premonsoon maintenance and repair of LT motors of VT pumps of CPS ACPS 2nd ACPS at Paschim Chowbhaga PS Anandapur District South
Premonsoon maintenance and repair of electrical installations such as ACB MCCB LT Starter control panel including allied works of Chowbhaga Pumping station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Clearing and removing weeds, floating water Hyacinth inbetween Ch285 and Ch476 of Kana Damodar and Gobindo Khal for a total length of 335 m in Block P.S. Jamalpur, Dhaniakhali, District Hooghly and in between Ch0 and Ch476 Jiara of DyD1 under CISD
Premonsoon maintenance and repair of electrical installations such as ACB MCCB LT Starter control panel including allied works of 2nd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the
Operation of 15 Nos. Regulator gates at different chainages of Kananadi canal, Dy N2 of Kananadi, river Koushiki canal, Dy K1 of river Koushiki canal, during khariff irrigation of Haripal Irrigation Section under CISD in the year 2026 27.
Clearing and removing weeds floating water hyacinth and Jungle cutting in between ch.0 ch445 at different streches of River Koushiki and in between ch70 Ch140 for a length of 2400 Mtr. in Haripal Irrigation Section in Block Haripal under CISD
PreMonsoon Maintenance repair work of switchgear transformer VCBHT RelayACBMCCB LT Starter control panel at Keorapukur pumping station PS Regent Park Distric South 24 Parganas during the year 202627
PreMonsoon Maintenance repair work of Switchgear transformer VCB HT RelayACB MCCB LT Starter control panel including allied works at Uttarbhag pumping station under MDMD PS Baruipur Block Baruipur in the district of South 24 PGS during the year
Bank protection work to the right bank of river Fulahar at village Rashidpur for a length of 1200 m in Block- Harishchandrapur-II, P.S.-Harishchandrapur, Dist-Malda.(2nd Call)