MR to Sundarban Embankment in between Ch 34.60 km to ch 35.32 km for a length of 220 mtr facing left bank of river -Thakuran in mouza -Purba Jata, G.P - Kankandighi, Block - Mathurapur II, P.S- Raidighi under JID in the dist of SPgs
Fabrication supply storing at site installation commissioning of trashrack bar screen gratingfloor Gratting Repairing of MS Bar screen including Painting at Forebay bridge during the year 202627
MR to Sundarban Embankment in between from Ch 29.20 km to ch 29.65 km for a length of 250mtr facing left bank of river Puckchora in mouza - Domkol, G.P - Nagendrapiur, Block - Mathurapur II, P.S- Raidighi under JID in the dist of S24Pgs
MR to Sundarban Embankment Inbetween from Ch 17.35 km to ch 18.00 km for a length of 350 mtr facing left bank of river Thakuran in mouza -Purba Sridharpur, G.P - Nagendrapiur, Block - Mathurapur II, P.S-Raidighi under JID in Dst. S24Pgs
MR to Sundarban Embankment in between from Ch 9.25 km to ch 9.60 km for a length of 120 mtr facing Right bank of river -Moni in mouza -Kumrapara, G.P- Kumrapara, Block - Mathurapur II, P.S- Raidighi under JID in Dist S24Pgs.
Emergent supplying of empty cement gunny bag, polythene bag and Nylon cage netting for immediate restoration of damaged Sundarabn embankment during monsoon and kotal period for Raidighi Irrigation Sub Divson under Joynagar Irrigation Division.
Premonsoon maintenance and repair of EOT crane cooling pump system submersible pumpswith accessories of at 3rd Additional Chowbaga Pumping station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
MR Sundarban Embankment from Ch 52.230 km to Ch 52.265 KM for a length of 35.00 mtr facing Left bank of river Sutarbag in mouza - Dk. Joykrishnapur, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the district of S 24 Pgs
MR to Sundarban Embankment from Ch 14.30 km to ch 14.450 km for a length of 150 mtr facing Right bank of river -Moni in mouza -Kumrapara, G.P - Kumrapara, Block - Mathurapur II, P.S- Raidighi under JID in the district of S24Pgs.
MR To Sunderban Embankment For A Length Of 70 M At Mouza -Sridharnagar Facing River - Dhanchi (LB) Under Joynagar (1) Division Block-Patharpratima, Dist-South 24 Pgs.
MR to Sunderban embankment at mouza-Upendranagar facing river-Pakhirala (LB) for a length of 150 mtr. under Joynagar (I) Division Block, P.S-Patharpratima, Dist-South 24 Pgs.
MR of Sundarban Embankment For Two Nos Ghoge Facing River Jagaddal LB) At Mouza-Rakhalpur Under Joynagar (1) Division-Ii, Block -Patharpratima Dist. - South 24 Pgs.
MR To Sunderban Embankment At Mouza-Taranagar Facing River-Gobadia For A Length Of 80.00mtr.(Ch 36.61 To 36.68) Under Joynagar Irrigation Division Block,P.S- Patharpratima, Dist-South 24pgs.
MR to Sunderban Embankment At Mouza- Digampur Maity Geri Facing River-Mridangabhanga(RB) For A Length Of 50.00mtr.(Ch 10.5 To 10.55) Under Joynagar Irrigation Division Block ,P.S-Patharpratima, Dist-South 24pgs.
MR to Sundarban Embankment For A Length Of 200 Mtr.(Ch 54.900to 55.100) At Mouja-Kuemari, Facing River-Nakchara, For The Year 2026-27under Joynagar Irrigation Division, Block,Ps - Patharpratima, Dist-South 24 Parganas.
MR to the Sundarban Embankment in between ch.6.50 to 6.55 km.facing RB of river Beledona in Mouza - Dongajora in Block - Kultali, P.S.-Kultali in District South 24 Paraganas.
MR to the Sundarban Embankment in between ch.8.00 to 8.15 km.facing LB of river Moni in Mouza Paraganas. Nalgora in Block Jainagar-II P.S.-Kultali in District South 24
MR to the Sundarban Embankment in between ch.11.30 to 11.455 km.facing RB of river Beledona in Mouza - Benimadhbpur in Block - Kultali, P.S.-Kultali in District South 24 Paraganas.
MR To Sluices At Mouza Ramganga, Dk.Mahendrapur, Dk.Gobindopur, Jogindrapur, Indraprastha, Dk.Shibpur, Rajrajeshwarpur, Facing River-Mridangabhanga, Gobadia For The Year 2026-27 Under Joynagar (I) Division, Block , P.S-Patharpratima, Dist-S 24 Pgs
MR to Sundarban Embankment along with single vent sluice at Nandakumarpur facing left bank of River Mridangabhanga in Mouza -Nandakumarpur, Block- Mathurapur- II, P.S- Raidighi under Joynagar Irrigation Division in the district of South 24 Pgs.
Carrying out detailed topographic Hydrographic survey of PanipiaKhal From Bhabatarini Mondir to Soula under Contai Irrigation Sub-Division
Geotechnical investigation for construction of proposed Ganga Arati Ghat over PanipiaKhal(near Soula Ganga Mondir) in Block-Contai-I, G.P.- Nayaput, P.S-Junput coastal, Dist-PurbaMedinipur
MR to Sundarban Embankment at Mouza-Kaikhali facing confluence point of river-Matla Nobipukur inbetween 0.000 km. to 0.200 km. in Block P.S.- Kultali under Kultala (1) Sub-Division, Dist. South 24 Parganas Under Joynagar (1) Division
MR to Chuprijhora Two vented masonary sluice at mouza - chuprijhora along river - Thakuran in P.S.- Kultali, Block- Joynagar II in District South 24 Paraganas.
MR to Single Vent Sluice (Bishali Sluice) At Mouza-Ramganga, Facing River-Mridangabhanga Under Joynagar Irr. Divn. Block Ps-Patharpratima, Dist-South 24 Pgs. For The Year 2026-27.
MR to Single Vent Sluice (Mannar Gheri) At Mouza-Laxmijanardanpur, Facing River-Atherogachi Khal Under Joynagar Irr. Divn. Block Ps-Patharpratima, Dist-South 24 Pgs. For The Year 2026-27.
Emergent restoration to Sundarban Embankment damaged due to New moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 100.00 M in between ch.13.800 Km to 13.900 Km facing Bay of Bengal at Mouza Shibpur under Sagar Irrigation
Premonsoon maintenance and repair of Supply fitting and fixing of submersible pumpswith accessories of GI pipe PVC pipe and Peets valve etc at Additional Chowbaga Pumping station under MDMD at Paschim Chowbhaga PS Anandapur District South 2
The Fabrication supply storing at site installation commissioning of trashrack bar screen grating repairing of MS Bar screen parrallel gratting for new grating including Painting of gratings of inlet at Additional Chowbaga Pumping Stati
Supply installation testing commissioning of Kirloskar make 30 KVA 3Ph liquid cooled DG set with Standard control panel as per CPCB IV norms coupled with KG make alternator at Keorapukur Pumping Station in PS Regent Park District South 24 PGS
Replacement of 8 nos draw shutters 6 nos at 14vent sluice at Dhosa and 2 nos at 4vent Lenin sluice and servicing of all hoisting system all within the Block PS Baruipur Dist24 PRGS South
Replacement of 6 nos damaged shutters 3no Draw shutter and 3 nos flap shutter and servicing of screw hoisting system of 3 vented Balarampur Sluice and servicing of 32 nos sluices shutters at Hanra Chitamari Garankati Kulpi Tangra all with in Ku
Emergent restoration of Sundarban Embankment damaged due to New moon kotal on and from 11.08.2026 to 15.08.2026 from Ch. 8.93 km. to Ch.9.06 Km. for a length of 130.00 metre facing Bay of Bengal at Mouza Baliara under Mousuni (I) Sub - Division
Clearing and removing of solid or semisolid and water hyacinth over Keorapukur khal from Ch. 6300 m.Mallickpur Bridge to 10400 m. under Tollys Nullah subdivision of Canals Division for the period of 90 days
REWINDING AND NECESSARY REPAIRING OF 180HP 132 KLW 3 PHASE SQURREL CAGE INDUCTION MOTOR AT ADDITIONAL UTTARBHAG PUMPING STATION DURING YEAR 202627
Emergent restoration of Sundarban embankment damaged due to New Moon kotal on from 11.08.2026 to 15.08.2026 for a length of 60 m in between Ch.7.3 km to Ch 7.36 km. km facing river Hatania-Doania (R) at Mouza-Dwariknagar under Mousuni
Clearing and removing of solid or semisolid and water hyacinth over Keorapukur khal from Ch. 1000 m.old pump house to 6300 m.Mallickpur Bridge under Tollys Nullah subdivision of Canals Division for the period of 105 days .
Emergent restoration to Sundarban embankment damaged due to New moon kotal on from 11.08.2026 to 15.08.2026 for a length of 60m from Ch. 3.65 km to 3.71 km at Mouza-Uttar Narayanganj, in Block- Namkhana facing left bank of Muriganga under Mou
Emergent 10 (Ten) nos ghoge repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 100.00 m in between Ch 7.00 km and ch 8.50 Km, Ch 16.30 Km to ch 16.310 Km,Ch 14.00 km and ch 14.50 Km
Procurement of lubricants for 10 nos different permanent pump houses at Chowbhaga4nos Uttarbhag3nos Keorapukur Bagjola and Kurebhanga in the district of South and north 24 PGS during the year of 202627
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 200.00 m in between ch 10.00 km to 10.20 Km of Banstala river right embankment at Mouza Taktipur, Block Kakdwip
Clearing and removing of solid/semi solid and Water Hyacinth over Keorapukur khal from ch. 10400.00 m. to 14500.00m. (under Tollys Nullah ( I) Sub Division of Canals Division for 2023-24 .
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 300.00 m in between ch 4.00 km to 4.30 Km of Banstala river left embankment at Mouza Koaberia, Block Kakdwip under Kakdwip
Premonsoon Oiling greasing of 61 nos gates and replacement of damage spares at different location at Kultali Dabu Keyatala and Bagpara all within the District of South and North 24 Parganas during the year 202627
AMC for taking rainfall gauge report at Chowbhaga preparation of daily report ofpump operation of all major pump houses and dusting cleaning of site office room at Chowbhaga under MDMD during the year 202627
Emergent restoration to sundarban embankment damaged due to new moon kotal on and from 11.08.2026 to 15.08.2026 for a length of 205 M in between Ch. 1.050 Km to 1.300 Km at mouza -Phuldubi in Block- Sagar facing left bank of river Hooghly under Sagar
Clearing and removing water hyacinth from Godakhali Branch khal from Metharpole to Dhancheberia for length of 2000 metre, Block - Budge Budge II, District South 24 Parganas under Canals Division during the year of 2026. (2nd call)
Replacement of old damaged submersible pump allied plumbing works of cooling system at Utterbhagh Pumping Station Block PS Baruipuri DistSouth 24 parganas
Emergent restoration to Sundarban Embankment damaged due to New moon Kotal on and from 12.08.2026 to 15.08.2026 for a length of 110.00 M in between ch.1.400 Km to 1.510 Km facing Bay of Bengal at Mouza Mahishamari under Sagar Irrigation
Bank protection with CC lining for a length of 165 m at the left bank of Kantakhali Main Khal alongwith Rehabilitation of Kantakhali Sluice within GP Mallickpur Block PS Falta Dist South 24 ParganasMECH PART