Loading…
Loading…
4,380 results • Latest
Clearing and removing weeds floating water hyacinth at Ch735.40 Kabilpur gate, Ch820 Kulut bridge, Ch860 Samserpur bridge, Ch900 Maheshpurbridge, Ch961 Bele Harishpur gate 1005 Sonatikri Bridge, Ch1065 Paniseola gate, Ch1105 Bhagabati under CISD of L
PreMonsoon Maintenance repair work of switchgear HT Relay ACB MCCB LT Starter control panel including allied works at Additional Uttarbhag pumping station under MDMD PS Baruipur Block Canning all in the district of South 24 PGS during the year 20
Operation of 3 Nos. Regulator gates at Ch753, Ch846 and Ch1001 of Kana Damodar of Dashghara Irrigation Section under Champadanga Irrigation Subdivision of Lower Damodar Irrigation Division during Kharif Irrigation 2026 - 2027.
PreMonsoon Maintenance repair work of Switchgear transformer VCB HT RelayACB MCCB LT Starter control panel including allied works at 2nd Additional Uttarbhag pumping station under MDMD PS Baruipur Block Baruipur in the district of South 24 PGS
Operation of 2 Nos. Regulator gates at Ch490 and 590 of Kana Damodar, during Khariff irrigation, 2026 of Dashghara Irrigation Section under Champadanga Irrigation Subdivision of Lower Damodar Irrigation Division during Kharif Irrigation 2026-27
Clearing and removing weeds and floating water hyacinth at ch753 Sarampara reg. gate, Ch725 Nalthoba Bridge, Ch846 Mirzapur reg. gate, Ch930 Loknath Bridge, ch1001 Loknath reg. gate of River Kana Damodar for a length of 870 M under CISD of LDID.
Clearing and removing weeds and floating water hyacinth at ch. 490 Sri Krishnapur reg gate, Ch 575 Dasghara Station Bazar Bridge, Ch 590 Dasghara reg gate of River Kana Damodar for a length of 600 Mtr. in Block PS Dhaniakhali under CISD of LDID
Protection work along left bank of River Jalangi for a length of 400.00 M at Gopinathpur Dafadar Para within Block-Tehatta-II, P.S.-Palashipara, Dist-Nadia.
Construction of Sundarban embankment for a length of 800 m along the Left Bank of river Jagaddal at Mouza - Sridharnagar, Block and PSPatharpratima, DistSouth 24 Parganas
PreMonsoon Maintenance repair work of switchgear transformer VCBHT RelayACBMCCB LT Starter control panel including allied works of VT pumps at Kurebhanga pumping stations at PS Canning Block Canning all in the district of South 24 PGS during the
Construction of Sundarban embankment for a length of 620 m from Ch. 22.5 k.m to Ch. 23.125 k.m at Mouza - Chemaguri facing Bay of Bengal in Block and P.S-Sagar
PreMonsoon Maintenance repair work of electrical installations such as switchgear transformer VCB HT Relay ACB MCCB LT Starter control panel including allied works of VT pumps and routine maintenance of 33KV substaion at Bagjola pumping station
Bank Protection work to the Right bank of River Kalindri for a Length of 300m near Kalindri High School, Village Palpara, G.P Dharampur, Block and P.S Manikchak, Mouza Islampur, Dist Malda
M/R to Minor B of Dy 15 of BBC in between Ch 0 Ch127 for a length of 3.871 km and ghoge repairing at mouza Shyamsundarpur, Chakmajuriprasadpur, Block Taldangra under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the
Maintenance and repair to Dy 15 of Bishnupur Branch Canal from Ch 168 to Ch 175 for a total length 0.2134km with repairing 2(Two) nos outlet structure and ghoges at Mouza Chakmajuriprasadpur, Block-Taldangra under Vishnupur Irrigation Sub Division
M R to Inspection path of Bishnupur Branch Canal inbetween Ch 1250 and Ch 1310 L B under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2026-27
Annual Maintainace of Dy14 of Bishnupur Branch Canal from Ch 51 to Ch 120 for a total length of 2.103 km. Mouza Chak Nakaijhuri, Nakaijkuri Bhagabanbat PS Block Onda under Vishnupur Irrigation sub division of Bankura Irrigation Division
Maintenance and repair to Dy 15 of Bishnupur Branch Canal from Ch 65 to Ch115 for a total length 1.524km at Mouza Douni Jaypu Tatar Block Taldangra under Vishnupur Irrigation Sub Division of Bankura Irrigation Division during the year 2026 27
Repairing of ghoges of BBC at different location during kharif irrigation 2026 in between Ch 1470 and Ch1515 of BBC for a length of 1.372km at Mouza Mahish Doba Block Onda under Vishnupur Irrigation Sub Division of Bankura Irrigation Division
Emergent restoration of Sundarban Embankment damaged due to New moon kotal on and from 11.08.2026 to 15.08.2026 from Ch. 8.80 km. to Ch.8.85 Km. for a length of 50.00 metre facing Bay of Bengal at Mouza Patibunia under Mousuni (I)
Annual Maintainace of Dy18 of Bishnupur Branch Canal inbetween 0 to Ch 65 of BBC total length of 1.981 km at Mouza Mohishdoba PS Block Onda under VI SubDivision of Bankura Irrigation Division, Bankura
Emergent restoration to Sundarban embankment damaged due to Full moon kotal on from 30.07.2026 to 03.08.2026 for a length of 95 m from Ch.4.91 km to 4.942 km 6.04 km to 6.103 km at Mouza-Uttar Dakshin Narayanganj, in Block- Namkhana facing
Annual Maintainace of DY19 of Bishnupur Branch CanalBBC inbetween 0 to Ch 201 of BBC total length of 6.126 km at MouzaBhedua,Benabandhi,Kharbaribadani , Katabari PS and Block Onda under VI SubDivision of Bankura Irrigation Divis
Emergent restoration of dry brick pitching at Sundarban Embankment damaged due to Full moon kotal on and from 30.07.2026 to 03.08.2026 from Ch. 12.340 km. to Ch.12.370 Km. for a length of 30.00 metre facing R/B of river Chenargang at Mouza Baliara
Annual Maintainace of Dy17 of Bishnupur Branch Canal inbetween Ch 0 and Ch 90 and its MinorA inbetween Ch0 and Ch40 at Mouza Majuriprasadpur P S Block Taldangra Dist Bankura under Vishnupur Irrigation Sub-Division of Ba
Emergent restoration of damaged sundarban embankment due to New Moon Kotal on and from 11.08.2026 to 15.08.2026 in between Ch.14.32 Km. Ch. 14.40 Km. for a length of 60.0 m at Mouza- Dakshin Surendraganj facing river Jagaddal under Patharpratima
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.2026 to 15.08.2026 in between Ch..0.5 Km to 1.0 Km for a length 75.00 Mtr.and 2 Nos. ghoges repairing at mouza - Dakshin Shibganj Near Gazir khal
Clearing and removing weeds and floating water Hyacinth in between Ch 476 and Ch 1366 for a length of 4000 mtr of Dy1 Canal of Kana Damodar in Block PS Tarakeswar, Jangipara, District Hooghly Under CISD of LDID
Operation and Maintenance of 6 nos Cross Regulator gates of Kana Damodar canal and 5 nos Cross Regulator gates of Dy2 of Kana Damodar canal for Kharif Irrigation Period 2026 27 including maintenance of upstream and downstream of the gates under CISD
Removal of water hyacinth an water weeds in Dy2 of Kana Damodar and Kana Damador for a length of 2200 Mtr during Kharif Irrigation 2026 27 within Antpur I Section under Champadanga Irrigation SubDivision in PS Block Jangipara, Hooghly under EEI LDI
Emergent restoration of Sundarban Embankment damaged during New Moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 80.0 M from ch 1.900 KM to 1.980 KM at Mouza- Gobindapur Abad facing river Saptamukhi under Patharpratima Irrigation Sub
Emergent restoration to sundarban embankment damaged due to new moon kotal on and from 11.08.2026 to 15.08.2026 for a length of 220 M at mouza -Sumatinagar in Block- Sagar facing left bank of river Muriganga under Sagar irrigation sub-division
Emergent restoration to Sundarban Embankment damaged due to New moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 150.00 M In between Ch. 4.900 KM and 5.050 Km at Mouza - Goramara in Block-Sagar facing Right bank of Muriganga
Emergent restoration of 2 No single vented damaged sluice Mandirtala Sluice, Kashtala sluice damaged due to New moon Kotal on and from 11.08.2026 to 15.08.2026 at mouza- Mandirtala Kashtala Respectively on left bank of river Hoogly right
Bathymetric Survey of Sutarbag river from Satpukuria 07 vented sluice to Sutarbag Bridge ( L-14.50 km.), Khari Khal from Koutala Rd to Kharapara(L-7.50.Km.)and Br. Canal of Moni at Nalua(L-2.20 Km.)flowing through different mz. under JID (2nd call)
Annual maintenance and repairing of 3 Phase Automatic Float Boost Battery Charger for 110 Volt including 150 AH Lead Acetate Battery Bank at Uttarbhag Pumping Station during the year 202627
Detailed topographical and hydrographical survey for Kumari river from origin to upstream of reservoir area of barrage of the said rivers complete in all respect under Burdwan Investigation and Planning Division in financial year 2026-27
Annual maintenance and repairing of 3 Phase Automatic Float Boost Battery Charger for 110 Volt including 150 AH Lead Acetate Battery Bank at Bagjola Pumping Station during the year 202627
Detailed topographical and hydrographical survey for Kangsabati river from origin to upstream of reservoir area of dam of the said rivers complete in all respect under Burdwan Investigation and Planning Division in financial year 2026-27
WatchingguardingjunglecuttingLodhashulirestshed
Servicing repairing maintenance of one number 66KV KW HP 467 626 HT motors vide MC No VFHM47842 make Crompton Greaves for 250 Cusec VT pumps at Uttarbhag Pumping Station under MDMD at PS Baruipur Distric South 24 Parganas during the year 202627
M/R to the sundarban embankment for a length of 125.00 mtr approach to river Thakuran at mouza-Chuprijhora, Block-Jaynagar-II, PS -Kultali under Kultala Irrigation Sub-Division under Jaynagar Irrigation Division.
M/R to the Sundarban Embankment along river Thakuran in between ch. 18.70 to 18.96 in Mouza - Chuprijhora in Block - Jainagar-II P.S.-Kultali in District South 24 Paraganas
M/R to Sundarban Embankment by repairing ghoge facing R/B of river Moni in Mouza -Nalgora in P.S.- kultali, Block- Jaynagar II in District South 24 Paraganas
M R to Sundarban Embankment at Mouza Deulbari debipur facing river chituri inbetween 15.500 km. to 15.600 km. in Block and P.S. Kultali under Kultala (1) Sub Division, Dist. South 24 Parganas Under Joynagar (1) Division.
Supply of empty cement polythene bags and nylon crate to the Hd.Qtr Section godown under Kultala (I) Sub Division, Dist. South 24 Parganas Under Joynagar (I) Division
MR to Sundarban Embankment at Mouza Debipur gurguria facing river Thakuran inbetween 12.200 km. to 12.250 km. in Block Kultali, P.S - Maipith coastal under Kultala (1) Sub Division Dist. South 24 Parganas Under Joynagar (I) Division.
MR to Sundarban Embankment at Mouza Madhyagurguria facing river Petkulchand inbetween 6.200 km. to 6.950 km. in Block Kultali, P.S Maipith coastal under Kultala (1) Sub Division, Dist. South 24 Parganas Under Joynagar (I) Division
MR to Sundarban Embankment at Mouza Maipith facing river Gurakhal inbetween 32.200 km. to 32.550 km. in Block Kultali, P.S Maipith coastal under Kultala (1) Sub Division, Dist.South 24 Parganas Under Joynagar (1) Division.
M R to Sundarban Embankment at Mouza Shyamnagar facing riverThakuran inbetween 20.600 km. to 21.000 km. in Block and P.S. Kultali under Kultala (1) SubDivision, Dist. South 24 Parganas Under Joynagar (1) Division