Construction of Sundarban embankment along left bank of river Chotokalagachi from 2.6 km to 3.03 km (length of 0.43 km) at Dwarir Jungle within Block- Sandeshkhali-II, PS- Sandeshkhali, District- North 24 Pgs.
Bank protection with CC lining for a length of 50 m at the left bank 50m at right bank of Balarampur Main Khal along with Rehabilitation of Balarampur Sluice within GPFalta Block PS Falta Dist South 24 ParganasMECH PART
Maintenance and repair Servicing of screw hoisting system and embedded parts of 3 vented Raypur Sluice 3 vented Godakhali Sluice 5 vent Churial Sluice 10 vented sluice Pujali Existing Dist24 PRGS South during the year of 202627
PreMonsoon Maintenance repair work of submersible Centrifugal pumpmotor sets including painting of inlet bar screensgratings at Kurebhanga pumping stations in the Block PS Canning District South 24 PGS during the years 202627
Premonsoon maintenance repair work of rope drum hoisting mechanism painting of flap draw shutters covers sf of ropes etc of 10 vent sluice at Chemaguri PSSagar DistSouth 24 PGS during the years 202627
Anti-Erosion work to the Right bank of River Padma at AOR of BOP Atrosia and Renu for a total length of 1830.00 m in Bloc kand P.S. Lalgola, Dist. Murshidabad
Protection work along left embankment of river Hooghly length 800 mtr near Chotonodir Par in Ward No. 14 under Diamond Harbour Municipality, P.S. Diamond Harbour, Dist. South 24 Parganas.
Premonsoon maintenance repair work of 9 vent and 10 vent sluice including replacement of damaged flap draw shutters of Bagjola canal at Ghusighata PSHaroa Dist South 24 PGS during the year 202627
Premonsoon Maintence repair work of 16 vents sluice and 20 vents sliuce including replacement of Damaged draw shutters flap shuters Stengthening the Trestle bridge Painting of steel iron surface to the trestle bridge iron caging railing electric
Annual Maintenance Contract AMC in connection with operation and running routine maintenance of VT pumps with allied Electro Mechanical system of VT pumps of 2nd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District S
Emergent restoration of 04 nos Spillway gate by SITC of steel wire rope along with other allied works at Karrior (I) Scheme in district Purulia
Annual Maintenance Contract AMC in connection with operation and running routine maintenance of VT pumps with allied Electro Mechanical system of VT pumps at Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas dur
Anti-Erosion work (Length 1000 M) along with improvement of embankment (Length 1300 M) along both bank of river Kantakhali at Mouzas- Laskarnagar, Rajnagar, Angnara and Tangramari in Block P.S. - Hasnabad, District- North 24 Parganas
Protection work along the right bank of river Singimari (Mansai) From Ch. 1600 meter to 2800 meter at Dakshin Singimari, Chatt Singimari and Andaran Singimari area within G.P.- B.R. Chatra, Block an P.S. Sitai, Dist. Coochbehar(PIN-736167) (Sorasori
Emergent work to mitigate the water logging problems..Diesel surface dewatering pump portable pumps on hire basis at Saratpally (Dakshin pally) G.P- Bankra-3 and at Jame Masjid road, G.P- Bankra-1 of Block- Domjor, Dist. Howrah.
Complete wiring and modification of electrical system including S and F of LED luminaries and Air conditioning machines at 1st floor of newly renovated bungalow at FF Block, Sech Abasan, Salt Lake City, Kol - 700106.
AMC for all Electrical installations, AC machines, operation of DG set, water pump, operation of motorized gates at newly renovated bungalow at Sech Niwas, FF Block, Salt Lake, Kol-106 during 2026-27 (w.e.f. 16.09.2026 to 31.03.2027 -197 Days)
Complete Outdoor illumination at Car Parking area for VVIP car parking at newly renovated Bungalow at FF Block, Sech Abasan, Salt Lake City, Kol - 700106.
Supply, installation, testing and commissioning of Public Address System at Newly renovated bungalow at FF Block Sech Abasan, Salt Lake city, Kol - 700106.
Supply, installation, testing and commissioning of one (01) no video conferencing room bar kit system including 98 inch television (1 No), All in one PC and printers at Newly renovated bungalow at FF Block Sech Abasan, Salt Lake City, Kol - 700106.
Supply, installation, testing and commissioning of one (01) no video conferencing system at the meeting room cum conference hall at ground floor of newly renovated bungalow at FF Block, Sech Abasan, Salt Lake City, Kol - 700106.
Supply, installation, testing and commissioning of different electrical appliances for newly renovated bungalow at FF block, Sech Abasan, Salt Lake City Kol - 700106.
Hiring,operation of 1no 62.5KVA Silent DG set (for 3 months) and 1no 125KVA silent DG set (for 3 months (on selected days)..for conducting meeting of the Honble Chief Minister of West Bengal at Sech Abasan, FF Block, Salt Lake City, Kolkata-700106.
Gopiballavpur Rest Shed night watchman and labour supply
Champa Right Canal Silt clearance
Periodical MR of Sepoybundh
Emergent restoration of 04nos Spillway gate by SITC of steel wire rope at RamchandrapurI Scheme in district Purulia.
Annual maintenance contract for operation of Electro-mechanically operated 05 nos. Draw and mechanically operated 05 nos Flap shutter and cleaning of the sill beam portion of these gates at Nafar Khal sluice gate, Dist- Nadia, during the year 2026-27
Emergent restoration of 02 nos HR gate other allied works at TatkoI Scheme.
Replacement of 5nos Draw shutters 8nos Flap shutters Total 10nos replacement of all embedded parts and installation of new hoisting system for f lap shutter of Teljana sluice gates block HarishchandrapurII PS Harischandrapur Dist Malda
Maintenance and repair to the right embankment of Tangra Branch Khal for a length of 200 M near Tangra Rest shed in GP - Karanjali, Mouza - Krishnachandrapur, Block and P.S - Kulpi, Dist. - South 24 Pgs.
Emergent restoration of Sundarban river embankment damaged from 15.06.2026 to 17.06.2026 due to New Moon kotal for a length of 65.00 m. of R/B of river Dansa near Parghata ferry ghat at Mouza-Parghata, Block- Hasnabad in the jurisdiction of Kalinag
Improvement of Canal ..... C.C. lining of Mossanpur Water Course of Dy 3 of D.B.M.C. ...... Rampurhat 1 block Dist. Birbhum of Hastikanda Irr Sec of Mollarpur Irr Sub Divn under MNC Division during 2017 18
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Radharma Khal from ch. 0 km to 3.0 km within Block PS.Gaighata, Dist.North 24 Pgs.
Clearing and removing water hyacinth, weeds and aquatic jungle from Ch. 0.00 to Ch. 155.00 of Sajibur Drainage Channel (off-taking from CD at Ch. 46.00 of KD Canal) and Ch. 0.00 to Ch. 105.00 of Sarangpur Drainage Channel under Jamalpur (I) Section w
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Kalna Channel from Ch. 0.00 to Ch. 118.00 under Jamalpur Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026-27
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between ch. 0.00_115.00 of KN1 Canal and ch. 0.00_106.00 of KN2 under Jamalpur (I) Section within Jamalpur Irrigation Sub-Division in the year 2026-27.
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between ch. 3034.00_3171.00 of Eden Canal and ch. 0.00_285.00 of Kana Damodar canal under Jamalpur (I) Section within Jamalpur Irrigation Sub-Division in the year 2026
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Kana Nadi Canal from Ch.0.00 to 285.00 under Jamalpur Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026-27.
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Salalpur Channel from Ch.0.00 to Ch. 125.00 and Sarangpur Channel from Ch.0.00 to Ch. 50.00 under Chanchai Irrigation Section of Jamalpur Irrigation Sub-Division during
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Br-II Canal from Ch.0.00 to Ch. 207.00 under Chanchai Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026-27
M/R to Eden Canal by removal of water hyacinth, aquatic weeds and clearing dense congestion from canal bed and banks near U/S and D/S of hydraulic structures between Ch. 2805_Ch.3034 under Chanchai (I) Section of Jamalpur (I) Sub-Division wi
M/R to canal by repairing ghoges, damaged canal banks and operation of 20 nos gates other than main regulator gates at different locations of KN4 (5 gates), N1 (6 gates), N1B (4 gates), and N1A (5 gate) within Dhaniakhali Blocks under Dhaniakhali (I)
M/R to canal by repairing ghoges, damaged canal banks and operation of 8 gates other than main regulator gates at different locations of KN-I (2 gates), KN-II (2 gates), Kalna Channel (2 gates), Shergarh (1 gate) and 270 W.C. (1 gate) within Jamalpur
Operation and Maintenance of Cross Regulator Gate at at Ch.274 of Branch-2 Canal and Regulation of Canal System from Ch. 210 (D/S) to cross Reg. Structure at Ch. 370 (U/S) during Kharif Irrigation 2026 under Jaugram Irrigation Section of JISD
Operation_Maintenance of Cross Regulator gates at Ch.102.00, Ch 175 of Branch-I Canal and Regulation of Canal System from Ch. 0.00 to Ch. 175.00 during Kharif Irrigation 2026 under Chanchai (I) Section of Jamalpur (I) Sub-Division
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.0.00_Ch.285.00 of Canal Dy. N1B of N1 of Kana Nadi, Block- Dhaniakhali and Polba under Dhaniakhali (I) Section of Jamalpur Irrigation Sub-Division in 2026-27
Clearing and removing water hyacinth under AMC for the period of 12 month including thick and thorny jungles of Kaijuri Khal from ch 1.500 km to 4.00 km .at G.P- Swarupnagar Banglani, Block P.S- Swarupnagar, Dist- North 24 Pgs.
Protection work for a length of 500.00 M along the left bank of river Sui from Satanus House to Khalil Rahamans House via Mofizuddin House at village Pukuria
Protection work for a length of 300m along the right bank of river Sui from Doli deoyalchock pachim Eidgaha to Doli deoyalchock Purba Eidgaha