Loading…
Loading…
4,380 results • Latest
One time removal of water-hyacinth of Dunia Khal in between Gargram Rankini bazar to Muradpur Vivekannda Vidyapith at G.P. Dibakarpur,Block- Chandipur,Dist.- Purba Medinipur
One Time removal of water-hyacinth of Banitala Khal in between Mirjapur to Bandha Khal at G.P. Garbari II ,Block- Bhagabanpur-II,P.S.-Bhupatinagar,Dist.- Purba Medinipur
One Time removal of water hyacinth over kaliaghai River in between ch 35.00km to 41.5km from Amgachia sluice to langalkanta wooden Bridge crossing within G,P.-Bishanupur Block and P.S.-Sabang, Dist-Paschim Medinipur.
One Time removal of water hyacinth over Paninala Khal from Talchitkini to Nakibasan for a length of 9.50 Km within G.P- Chistipur-I, Block-Patashpur -I, PS-Patashpur, Dist-Purba Medinipur
One Time removal of water hyacinth over OCC Khal from Baromile to Paltaberia within Block-Contai-I, PS-Contai, Dist-Purba Medinipur
One Time removal of water hyacinth over Panipia Khal from Bhabatarini Mandir to Panipia within Block-Contai-I, PS-Contai,Dist-Purba Medinipur
One time clearance and removal of water hyacinth of Baghai River in between Ch.10.50 km Ch.17.00 km within Block-Dantan-II, Patashpur-I,PS-Narayangarh, Patashpur,Dist-Paschim Medinipur, Purba Medinipur
One time clearance and removal of water hyacinth of O.C.C in between Ch.30.50 km Ch.34.50 km within Block-Egra-I,Egra-II, PS-Egra, Dist-Purba Medinipur
One time clearance removal of water hyacinth of Balighai Baromile Khal from Bhatda to Near Dubda Choumukh RCC Bridge within Block-Egra-I II ,PS-Egra, Dist-Purba Medinipur
One times Clearance removal of water hyacinth of Balighai Baromile Khal from Balighai Bus Stand to Pahari Garden including pond of Egra Irrigation office campus within Block-Egra-II Egra Municipality,PS-Egra, Dist-Purba Medinipur.
One time clearance and removal of water hyacinth of Upper Kudi Diversion Channel UKDC from Bhai Bon Muri Ghar to Benachakri Primary School within Block-Egra-I,PS-Egra, Dist-Purba Medinipur
One time clearance and removal of water hyacinth of Balighai Baromile Khal from Dubda SWM unit to Baromile Cross Regulator within Block-Egra-II ,PS-Egra, Dist-Purba Medinipur
One time clearance and removal of water hyacinth of Beta Khagda Khal within Block-Egra-II ,PS-Egra, Dist-Purba Medinipur.
One Time removal of water hyacinth over Kanaidihi Khal for a length of 2.0 km within Mouza- Kanaidighi ,Block-Contai-III ,PS-Marishda, Dist-Purba Medinipur
One Time removal of water hyacinth over Singda Khal from Singda to Pratapdighi within Block-Patashpur-II ,PS-Patashpur, Dist-Purba Medinipur
One time clearance and removal of water-hyacinth from Ch. 0.0 Km to Ch. 4.0 Km of Khadalgobra Khal within Block- Ramnagar-I, P.S.- Digha and Digha Mohona Coastal, Dist.- Purba Medinipur
One time clearance and removal of water-hyacinth from Ch. 0.0 Km to Ch. 9.0 Km of Ramnagar Khal within Block- Ramnagar-I and II, P.S.- Ramnagar, Dist.- Purba Medinipur
Repairing of damaged boundary wall at Egra (I) Sub-Division Office Campus at Kasba -Egra, P.S.-Egra, Dist. - PurbaMedinipur. (3rd Call)
Additional flood protection work using Bullah piling for a length of 350 m from the house of Sitaram Choudhury upto the Paschim Ratanpur Primary School under GP Bilaimari, Block Ratua-I, Dist Malda (2nd Call).
Renovation of Khejuri Section Office at Khejuri Block-Khejuri-II, Dist- PurbaMedinipur. (3rd Call)
Repair and maintenance work over right forward embankment of Hooghly River (River Side) in between 15.900 km to 16.000 km at Kadirabadchar, Mouza Kadirabadchar G.P.- Khejuri, Block- Khejuri-II, Dist. - PurbaMednipur. (2nd Call).
Reconstruction of fully damaged Single vent sluice over N.D.C Khal at RS at Mouza-Kuliyata, G.P- Talghachary-I in Block- Ramnagar-I in Dist-PurbaMedinipur.(2nd Call).
Renovation of Powsia Section Office at Powsia, Block - Bhagbanpur-II, Dist.- Purba Medinipur
MR Removing of water hyacinth and Floating Debris from Natun Bazar Khal at ward no 112 of K.M.C under Tollys Nullah I Sub Division of Canals Division (For the period of 180 days)( 2nd call to the 1st Tender no. WBIW/EE-II/CD/e- NIT-02(e)/2022-23
Repairing of Digha Irrigation Sub-division Office and Ramnagar Section Office buildings including sanitary and plumbing works under Contai (I) Division within Block- Ramnagar-I,P.S.- Ramnagar, Dist.- Purba Medinipur
M/R to Egra (I) Section office Building at Egra (I) Sub-Division Office campus premises in Mouza-Kasba Egra, P.S.-Egra, Dist.- Purba Medinipur
Improvement of New Changmari-Premganj Embankment along left bank of river Teesta from Ch. 0.0 KM to Ch. 2.10 KM (length 2100 M) within Block Kranti, PS Malbazar, Dist. Jalpaiguri
Repairing of barrel portion and structural portion along with replacement of mechanical components of Sapkhali sluice over Right Embankment of river Mridangabhaga at Mouza - Ramganga of P.S. patharpratima and Block Patharpratima District South 24
Repairing of barrel portion and structural portion along with replacement of mechanical components of Copamari sluice over Left Embankment of river Gobadia at Mouza - Ramganga of P.S.- patharpratima and Block Patharpratima District South 24 Pargana
MR to Sunderban embankment near sluice at mouza-Uttar Mahendrapur facing river-Gobadia (LB) for a length of 100 mtr. under Joynagar Irrigation Division Block and P.S-Patharpratima, Dist-South 24 Pgs. (Lat. -21.910288, Long. -88.367168)
MR to raising and strengthening of sundarban embankment in between ch. 10.50 km and 11.50 km. in Mouza- Garankathi along river Matla in Block and P.S.- Kultali, District -South 24 Pargans under Joynagar Irrigation Division.
Protection work along the left bank of river Atrai behind Patiram College for a length of 950m at G.P Patiram P.S. and Block Balurghat, Dist. Dakshin Dinajpur
MR to raising and strengthening of sundarban embankment in between ch. 17.50 km and 18.50 km. in Mouza- Gopaganj along river Matla in Block and P.S.- Kultali, District - South 24 Pargans under Joynagar Irrigation Division.
MR to strengthening embankment at Mouza- Nolgora along river Moni at Ch 10.40 km to 10.700 km Block- Joynagar-Il under Kultala (1) Sub-Division of Joynagar (1) Division.
Emergent Protection of Left Bank of HTC Khal at Khodambari near Nandigram-II BDO Office in, GP.- Khodambari,PS.- Nandigram,Block- Nandigram-II, Dist.- Purba Medinipur
MR to strengthening embankment at Mouza- Chuprijhora along river Thakuran at Ch 20.00 km to 20.250 km Block- Joynagar-II under Kultala (1) Sub-Division of Joynagar (1) Division.
Soil investigation work at various Chainages of OCC Khal, Champa Channel and Chhatri Channel for proposed re-excavation works within Block-Egra-I,Ramnagar-I, Dist-Purba Medinipur
MR to strengthening embankment at Mouza- Paschim radhaballavpur along river Thakuran at Ch 38.00 km to 38.40 km Block-Joynagar-II under Kultala (1) Sub-Division of Joynagar (1) Division.
Soil Investigation work at various chainages of Pichaboni khal, Ramnagar khal and Sapua khal for proposed re-excavation works within Blocks- Ramnagar-I and II, Dist.- Purba Medinipur
MR to strengthening embankment at Mouza- Chuprijhora along river Thakuran at Ch 19.30 km to 19.50 km Block- Joynagar-II under Kultala (1) Sub-Division of Joynagar (1) Division
Annual maintenance contract (AMC) in connection with remote operation, control , monitoring of Teesta Barrage through state-of-the art communication based SCADA systems and running routine maintenance , repair of associated automation, network
MR to Sundarban Embankment at Mouza-Maipith facing river-Olian inbetween 32.400 km. to 32.650 m. in Block - Kultali, P.S - Maipith coastal under Kultala (I) Sub-Division, Dist. South 24 Parganas Under Joynagar (I) Division during the year 2025-26. L
MR to Sundarban Embankment at Mouza-Bhubaneswari facing river-Thakuran inbetween 10.150 m. to 10.300 km. in Block Kultali, P.S Maipith coastal under Kultala (I) Sub-Division, Dist. South 24 Parganas Under Joynagar (I) Division during the year 2025-2
MR to the Wooden Bridge at Daripatna over Old Kaliaghai River near Tulsichara Mandir in GP.- Gokulpur, Block- Patashpur-I PS.- Patashpur, Dist.- Purba Medinipur. (3rd call)
MR to Sundarban Embankment at Mouza-Kishorimohanpur facing river-Olian inbetween 47.450 km. to 48.000 km. in Block - Kultali, P.S - Maipith coastal under Kultala (I) Sub-Division, Dist.- South 24 Parganas Under Joynagar (1) Division during the year
Soil Investigation work for proposed construction of Tide-gauge Observatory Station over Negua Diversion Channel in Block- Ramnagar-I, P.S.-Digha Mohona Coastal, Dist.- Purba Medinipur.
MR to raising and strengthening of sundarban embankment in between ch. 22.10 km and 23.10 km. in Mouza- Shyamnagar along river Thakuran in Block and P.S.- Kultali, District - South 24 Pargans under Joynagar Irrigation Division.
MR to Sundarban Embankment from Ch 14.1 kM to Ch 14.2 for a length of 100.00 mtr facing right bank of river Moni in mouza - Kumarpara, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the district of South 24 Pgs.
MR to Sunderban embankment by repairing of 08 nos. ghogh at moura-Indranarayanpur (over AILA embankment) facing river-Mridangabhanga (RB) under Joynagar Irrigation Division Block and P.S-Patharpratima, Dist-South 24 Pgs (Lat 21.907233, Long. -88.3849
Emergent repairing of right embankment of Kaliaghai river in between ch 46.0 km to 51.50 km in Bhagwanpur-I Block at Mouza- Bhagwanpur and Dist-Purba Medinipur