Loading…
Loading…
4,379 results • Latest
Periodical cleaning of water hyacinth over Paninala Khal from Talchitkini to Nakibasan for a length of 6.50 Km within G.P- Chistipur-I, Block-Patashpur -I, PS-Patashpur, Dist-Purba Medinipur
Rehabilitation of 6 Nos. barrage gates through replacement of rubber seal, electrical components with Solar High Mast etc, sand blasting cleaning and painting of all M.S structure of Uparkhara Mini Barrage at Tilutia, Block Nanoor, Dist Birbhum.
MR to Clearing and removal of water-hyacinth of Banitala Khal in between Mirjapur to Bandha Khal at G.P. Garbari II ,Block- Bhagabanpur-II,P.S.-Bhupatinagar,Dist.- Purba Medinipur during the year 2024-25
Construction of New Bridge Cum regulator structure at Ch. 78 over Alampur Khal at Bagpara, G.P.Satgachiya, P.S.Nodakhali, Block Budge Budge Dist-South 24 Parganas under Suburban drainage Division _Part_B_ Mechanical.
MR to removal of water Hyacinth and drainage congestion fo Dhanyashree Khal, G.P. - Bjajalal Chak , G.P. - Block - Chandipur, Dist.- Purba Medinipur
MR to removal of Water Hyacinth and drainage congastion of Dhusia Khal in Block - Chandipur and Dist.- Purba Medinipur
Special repair and painting for external face of North Block, eleven storied building of Jalasampad Bhavan, Salt Lake office building of Directorate of Commercial Taxes, WB.
MR to removal of water Hyacinth and drainage congestion of Magrajpur Khal in Block - Chandipur and Dist.- Purba Medinipur
MR to removal of water Hyacinth and drainage congestion of Ketokitola Khal in Block - Chandipur and Bhagwanpur - Iand Dist. - Purba Medinipur
MR to removal of water Hyacinth and drainage congestion of Deryadighi khal (length of work 5300 mtr) in G.P. - Mahammadpur - I, Block - Bhagwanpur - I and Dist. - Purba Medinipur
One time clearance,removal of water hyacinth of Balighai Baromile Khal from Chhatri Khal outfall to Near Dubda Choumukh RCC Bridge within Block-Egra-I and IIPS-Egra, Dist-Purba Medinipur.
Clearance removal of water hyacinth of Balighai Baromile Khal from Balighai Bus Stand to Pahari Garden including pond of Egra Irrigation office campus within Block-Egra-II and Egra Municipality,PS-Egra, Dist-Purba Medinipur
One time clearance removal of water hyacinth of Upper Kudi Diversion Channel (UKDC) from Bhai Bon Muri Ghar to Benachakri Primary School within Block-Egra-I,PS-Egra, Dist-Purba Medinipur
M/R to removal of jungle and deposited earth from canal bed in between chainage from Ch. 0.00 and Ch. 209.00 of Dy-5 of D.B.M.C under Chilla(I) Section of Rampurhat (I) Sub-Division within M.N.C.D during the year 2026-27
One time clearance , removal of water hyacinth of Baghai River in between Ch.9.50 km Ch. 14.50 km within Block-Narayangarh , Patashpur-I,PS-Narayangarh , Patashpur,Dist-Purba , Paschim Medinipur.
M/R to S/E in between 4.500 KM to 4.650 KM at M/Kumirmari facing R/B of R/Bagna in Block - Gosaba, P.S.- Sundarban Coastal, Dist-(S) 24 Pgs under JID.(2nd call to the 1st Tender of e-NIT No. WBIW/EE-I/JOY/NIT-22(e)/2025-26,S.L.- 12)
One time clearance and removal of water hyacinth of Baghai River in between Ch.15.70 km Ch.21.50 km within Block-Patashpur-I, PS-Patashpur, Dist-Purba Medinipur
Clearing water hyacinth and cutting of Jungles of P.C. (from Ch.0.00 to Ch. 40.00, Ch. 70 to Ch.180 and Ch.210 and Ch.450) in Block Mongalkote and Katwa-I, District- Purba Bardhaman in connection with Kharif Irrigation - 2026 within SO Katwa Section
M/R to removal of jungle and deposited earth from canal bed in between chainage from Ch. 0.00 and Ch.50.00 of Dy no-5A of D.B.M.C and its WC from ch. 0.00 to Ch. 80.00 under Brahmani Barrage Section of Rampurhat (I) Sub-Division within M.N.C.D duri
One Time removal of water hyacinth over Kanaidighi Khal from 1no. Wooden Bridge to Kulanjhara within Block-Contai-III ,PS-Marishda, Dist-Purba Medinipur
One Time removal of water hyacinth over Singda Khal from Singda to Pratapdighi within Block-Patashpur-II ,PS-Patashpur, Dist-Purba Medinipur
One Time removal of water hyacinth over Argoal Khal from Argoal to Harinabari within Block-Patashpur-II and Bhagwanpur-II,PS-Patashpur and Bhupatinagar, Dist-Purba Medinipur
One Time removal of water hyacinth over OCC Khal from Baromile to Satmile within Block-Contai-I,PS-Contai,Dist-Purba Medinipur
One Time removal of water hyacinth over Panipia Khal from Bhabatarini Mandir to Panipia within Block-Contai-I,PS-Contai,Dist-Purba Medinipur
Assessment of present cross sectional profile with topographical survey of Dunia Khal from ch 6km to ch 12 km within GP Kulbaria Block PS Chandipur Dist Purba Medinipur under the jurisdiction of the Executive Engineer
One time clearance and removal of water-hyacinth from Ch. 0.0 Km to Ch. 4.0 Km of Khadalgobra Khal within Block- Ramnagar-I, P.S.- Digha and Digha Mohona Coastal, Dist.- Purba Medinipur
E/R of S/E damaged due to Amabasya Kotal from 18.01.26 to 25.01.26 in between 5.550 km to 5.640 km at M/Amtali facing R/B of R/Puinjali in Block-Gosaba, P.S.-Sundarban Coastal , Dist-(S) 24 Pgs under JID.
Improvement of canal system of Kopai South Main Canal of Mayurakshi reservoir project from Ch 1779.23 to Ch 2000.92 (Total working length 6.76 Km) in Ketugram I block of Purba Bardhaman District
Restoration of damaged right bank of Lower Bagjola Khal from 14.400 km to 14.480 km at Block Bhangar II , Ps Polerhat and Dist South 24 paraganas
Bank protection work on R/B of river Ganga for a length of 400.00M In between Ch.19400M to Ch.19800M of ds of Farakka Barrage at Vill Chachanda, Block and P.S. Samserganj, Dist.Murshidabad
Protection work along the left bank of river Gialndi at Satvendi (Total Length- 350 m) within Block and PS Dhupguri, Dist Jalpaiguri 2 nd call
Supply of empty Cement Polythene Bags and Nylon cages netting for emergency flood fighting measures at Basanti (I) Sub-Division at Block and PS Basanti, Dist-(S)24 Pgs under JID.(2nd call to the 1st Tender of WBIW/EE-I/JOY/NIT-22(e)/2025 -26,S.L.- 36
Protection work along the right bank of river Neora for a length of 150 M at Baguladhura, GP Bidhannagar, Block and PS Matiali, Dist. Jalpaiguri
M/R to Mahisara and Laxmangheri lead channel and sluices at M/Moukhali -Kumrakhali Block-Canning-II,P.S.- Canning Dist-(S) 24 Pgs under JID.(2nd call to the 1st Tender of e-NIT No. WBIW/EE-I/JOY/NIT-22(e)/2025-26
M/R to Sundarban Embankment in between 2.860 KM to 3.072 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba Dist-South 24 Paraganas under Joynagar Irrigation Division.
Emergent restoration of Sundarban Embankment damaged during Full Moon Kotal on and from 30.07.2026 to 03.08.2026 for a length of 30.0 M from ch 24.150 KM to 24.180 KM at Mouza- Brajaballavpur facing river Walls Creek(L/B) under Patharpratima Irrigat
M/R to Sundarban Embankment in between 3.100 KM to 3.286 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.250 KM to 4.370 KM at mouza Puinjali facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.100 KM to 4.220 KM at mouza Puinjai facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment at Mouza Kumirmari in Between 5.800 KM to 5.840 KM at left Bank of River Sarsa at Block- Gosaba, P.S. Sundarban Coastal ,Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.700 KM to 4.950 KM at mouza Puinjai facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal, Dist-South 24 Paraganas under Joynagar Irrigation Division.
Protection work along the Left bank of river Gilandi for a Length of 175 meter near Beltoli Village within Jharalta-I G.P, Block and P.S.- Dhupguri, Dist Jalpaiguri
Emergent restoration of Sundarban Embankment damaged occurred on dated 13.07.2026 during the New Moon kotal near HO Sankar Singha facing River Bidyadhari (R/B) for a length 95.0 m, Mouza-Baunia Abad, G.P.- Nazat-I , Block- Sandeshkhali-I of Haroa Ir
Bank Protection work along the right bank of river Chauli adjacent to the Graveyard and Funeral area for a length of 250 m in Block and P.S.- Rajganj, District Jalpaiguri. Ref Sarasari Mukhyamantri
Emergent restoration of Sundarban Embankment damaged during New Moon Kotal from 14.07.2026 to 16.07.2026 for a length of 80.00 m. near H/O Nur Islam, Mouza- Durga Mandap, G.P- Durga Mandap, Block-Sandeshkhali-II, along L/B of river - Boalia of Kalina
RE-EXCAVATION OF DEFUNCT MONIKHALI KHAL PARNASHREE KHAL BY MEANS OF PONTOON MOUNTED EXCAVATOR FROM PARNASHREE AIRPORT AREA (0.00) M TO NEW MONIKHALI KHAL (590.00) M, PARNASHREE PUMPING STATION DOWN STREAM (0.00) M TO DEFUNCT MONIKHALI KHAL (370.00)
M/R to operation of regulator gates and structures including canal bank monitoring in connection with Kharif Irrigation-2026 for the period July26 to October26 from ch.190 to ch. 410 of Dy-11 of Gramsalika (I) Section under Kuli (I) Sub-Division
Emergent restoration of Sundarban Embankment damaged due to Full moon kotal on and from 30.07.2026 to 03.08.2026 from Ch. 3.50 km. to Ch.3.73 Km. for a length of 230.00 metre facing L/B of River Chenargang at Mouza Patibunia under Mousuni
Emergent restoration of Sundarban Embankment damaged due to full moon kotal on and from 29.07.2026 to 03.08.2026 from Ch. 28.36 km. to Ch.28.56 Km. for a length of 200.00 metre facing R/B of river Chenargang at Mouza Mousuni under Mousuni
Emergent restoration of Sundarban embankment damaged due to Full Moon kotal on and from 30.07.2026 to 01 .08.2026 for a length of 24.00 M in between Ch 13.360 km and Ch. 13.384 km facing river L/B of Edwards Creek at Mouza Amrabati of Block- Namkha