Loading…
Loading…
992 results • Latest
State Plan 2025-26 - Replacing of old, under sized and damaged sewer line with new SW Sewer line, Rajiv Nagar - Sewer work-Sewerage Work
State Plan-2025-26-Replacing of old ,undersized and damaged SW line at CSM Nagar House no 10 to 76 in Vazhuthacadu ward -Sewerage Work
KWA -Mace of Hiring of Car or Jeep vehicle below 1500 cc on hire basis to attend day to day duties under Water Supply Sub Division Mattannur for a period of 1 year
DEPOSIT-PMGSY Utility Shifting WSS to Cheekode and Adjoining VillagesShifting Existing Distribution Lines and Other Utilities due to PMGSY Road Upgradation Work along Akkode Aroor Chellikkara Kakkovu PMGSY RoadPipeline Work
Others Hiring of vehicle below 1500cc for day to day maintenance activities under Water Works Section Kowdiar for the year 2025 26 Hiring of vehicle with driver below 1500cc with GPS and having a seating capacity of not more than 7 persons for mai
state plan 2021 2022Appendix 5-Providing and laying 200mm PVC 160mm PVC from railway gate to KilithattumukkuPipeline Work
OandM - Water Supply Schemes-JICA KWSS TO MEENADU AND ADJ VILLAGES-Replacement of damaged Soft starter of Treated Water Reservoir Pump No.201 at 73 MLD WTP Panamkuttimala , Supply and installation of a new soft starter for TWR Pump 201
State Plan 2025 26 Optimization of Production and Transmission Rennovation of WTP CRWSS to Sreemoolanagaram and Kanjoor Panchayaths Supply and Fixing Electro magnetic Flow Meter 3 nos 150mm 200mm 300mm at 13.5 MLD WTP Chowara General Civil
DEPOSIT Ranni Angadi Grama Panchayat KDP 2025 26 Project No 134 WSS to Chavaramplavu Extension of pipeline in Irulukuzhi to Kulakutti stretch of Ebenezer Thondada Kulakutti road Letter No SC 1592843226 Pipeline Work
DEPOSIT Ranni Block Panchayat RWSS to Ranni Pazhavangadi Vadasserikkara Letter No A3 11 2026 KDP 2025 2026 Extension of pipe line at Ward 4 and Ward 9 of Ranni Pazhavangadi Grama Panchayat Pipeline Work
Facility Management Services - LumpSum Based - Commercial; O&M for Electronics Work; Consumables to be provided by service provider (inclusive in contract cost)
DEPOSIT- PMGSY Road Widening Utility shifting and Connection shifting at Vayillamkunnu temple to Mandazhy road PIPE LINE WORK-pipe line maintenance work -Pipeline Work
State Plan State Plan works under Nedumkandam section 2023 24 Supply erection and commissioning of borewell submersible pumpset in TWSS to Kattappana in Kattappana Muncipality General Civil Work
DEPOSITLaying distribution main of 63mm PVC pipe for a length of 48m along Peediyakkal Road bylane in division 43 of Kochi Corporation-Pipeline Work
DEPOSITProviding water connection to The Super Specialty Block of Government General HospitalGeneral hospital Ernakulam in Dvn 39 old of Kochi Corporation Pipeline work
DEPOSITVechoochira Grama Panchayat RWSS to Vechoochira Extension of pipe line Project No 288 2026 at various wards 9 Locations in Vechoochira Grama Panchayat Pipeline Work
O and M - Water Supply Schemes - Maintenance work - ARWSS to Kumily and Chakkupallam - Kumily WTP roof leak proofing work
State Plan-2025-26 - Optimisation of production and transmission -RWSS to Marykulam - Installation of standby submersible pump set and allied works
O and M Water Supply Schemes TWSS Annual Maintenance of Water Supply Distribution network of Cheruvaikkal area under Pongummoodu section for the year 2026_2027
O and M Water Supply Schemes Annual Maintenance of the Water Supply Distribution Network in Powdikkonam Zone Under Kazhakkuttam Section for 2026 27
O and M Water Supply Schemes Annual Maintenance of the Water Supply Distribution Network in Manvila Zone Under Kazhakuttom Section for 2026 27
DEPOSIT 2024 Replacing damaged portions of 100 mm GI 65 mm GI and 50 mm GI pipes of TWSS to Illichary in Muttom GP Ward 11 Muttom GP Project No 185 25
DEPOSIT-2024 Replacement of corroded 25 mm GI pipe line with 40 mm GI pipe line from Kollamkunnu GLT to Olikkal area of RWSS to Muttom in Muttom GP Ward 5 6Muttom GP Project No. 183 25
Deposit work Replacing existing pipeline in Cholakkandi SC Nagar area in Malappuram Village
GENERAL-Hire of vehicles-for the use of Projects Division,Kannur.-for dry lease mode
State Plan-2024-25--Renovation of existing civil structures - Repair work and renovation of Kondotty Section office building-General Civil Work-1
State Plan DRW 2025 26 CWSS to Cheekode and Adjoining Villages Source improvement AND Water conservation Desilting and Cleaning of Intake Well at Erattamuzhi General Civil Work
State Plan 2025-26- Replacement of old and damaged AC pipes with 110mm PVC pipe from Moonnu kallinmood Jn. to konnammood Jn in Neyyattinkara-Pipeline Work
O M - Water Supply Schemes-DRW(2026) -RWSS to Vellamunda-Cleaning of the natural weir at Pulinjal inVellamunda-Pipeline Work
Laying 350mm and 200mm DI K9 pipe in Kadappara to Manappattuchira Sebiyoor road and Sebiyoor to Mundangamattom road
DEPOSIT Additional Work PWD No LSN 7092 2024 Chittar Mankayam road work Budget Work 2024 25 20 Upgradation with BM BC For 1.100 km Overlay with 20mm CC For 7.000 km Relaying KWA damaged pipe lines towards Old Bus stand Pipeline Work
DEPOSITWork.CARWSS to Alakkode and Adjoining Villages. Pipeline Extension of 40 mm GI pipes and Providing Water Connection to households in a water scarcity area at Idivettippara colony in Alakode Panchayath.General Civil Work
Providing water supply to Infra Proxim by laying 63mm PVC pipe from Chandrathil road in Kochi corporation Div 34 old 38 New Pipeline Work
Masjid Road Replacing of old 63mm PVC pipe with new 90mm PVC pipe 6kg per cm2 in Div 20 of Kochi Corporation Pipeline Work
DEPOSIT-Alappad Grama Panchayath- CWSS to Oachira ,Alappad,Clappana and Karunagappally-Construction of New Pump house and allied works of tubewell constructed by GWD at ward No. 2 in Alappad Panchayth
Water Supply Schemes - Running Maintenance Contract for FY 2025-26 Rectification of Leaks in UWSS Urban Water Supply Scheme for Kalpetta Municipality
DEPOSIT 2024 Pipe line extension to Pachilaamkunnu using 40 mm GI pipe in Muttom GP Ward 4 Muttom GP Project No 184 25
DEPOSIT-DEPOSIT- Inland Navigation-Mahi canal--KWA Utility Shifting at kaliyamvallli bridge -Supply Laying Testing and Commissioning of 355mm HDPE Pipe across Badagara mahe canal -Pipeline Work
DEPOSIT PWD Rebuilding of Naranath Bridge Shifting of KWA utilities relaying of 350mm MS pipe with 400mm HDPE pipe Pipeline Work
State Plan 2022 23 OPTIMIZATION OF PRODUCTION AND TRANSMISSION WSS to Anjarakandy Peralassery and adjoining Panchayath Replacing AC Distribution with DI K9 pipe at Muzhappilangad Panchayath Pipeline
State Plan 2023 24 Construction Renovation of Civil Structures owned by KWA WSS to Kannur and adjoining Panchayath Strengthening work of water tank at Thana General Civil Work
DEPOSIT Ranni Block Panchayat RWSS to Ranni Pazhavangadi Vadasserikkara Letter No 4659418 2025 KDP 2026 Project No 57 2026 Extension of pipe line at Kollam Padi - Parakkalethu Padi road in Ward 6 of Ranni Grama PanchayatPipeline Work
Jal Jeevan Mission (JJM)-Augumentation of WSS to Pattazhi, Pattazhi Vadakkekara, Mylom and Thalavoor panchayath--Augmentation of Pookkunnimala WTP in Pattazhy to 16.5 MLD-Pipeline Work
O and M Water Supply Schemes RWSS To Sasthamcotta Annual Maintenance 2026 and 2027 rectification of Leakages Breakages Blockages in AC PVC CI pumping main and distribution lines to various places of Sasthamcotta Panchayath General Civil Work
In this estimate, provisions have been made for rectifying leakages in various classes and diameters of pipes Conveyance of chemicals for watertreatmentfrom division store to WTP,Washing tanks and clearing vegetation
Procuring MS Barrels, Rubber Rings and other necessary Specials
DEPOSIT Jilla Panchayath WSS to Nagamala Supplying and Fixing Iron removal Plant Pressure Filter at Nagamala in Thenmala Pt General Civil Work
Oand M Water Supply Schemes Others Hiring of vehicle for the use of Blue brigade under WW section Kuriathy for the year 2026 27General Civil
State Plan-2025-26-UWSS to Koothattukulam-Replacement of Clear water pumping main from Moongankunnu to Valaikkunnu GL Tank (NodeIII)-Pipeline Work
State Plan 2025-26 - Improving Water Supply by laying of 160mm PVC pipe from Pattom - Chalakkuzhi Lane entrance up to Chalakkuzhy bridge in Pattom ward under Kowdiar section