Loading…
Loading…
9,057 results • Latest
REPAIRING OF C.R. AVENUE AND VIVEKANANDA ROAD FROM RAMESH DUTTA STREET TO JN OF SIMLA STREET AND VEKANANDA ROAD AT WARD NO 026 UNDER BR IV
REPAIRING OF ROADS AT J.M. AVENUE (IN PATCHES), RAJA MANINDRA ROAD (IN PATCHES) AND SURROUNDING AREAS UNDER BR I.
REPAIRS TO IP AND CONCRETE PASSAGE AT 56/C BECHU CH ST,52,53/1/A GURU PRASAD CH LANE, 25 KALIDAS SINGHI LANE,21 GIRISH VIDYARATAN LN AND OTHER PLACES IN WARD NO-38
Repairing of pot holes of asphaltum roads at different places in Ward No-23
Supplying, fitting and fixing M.H. Cover / G.P. Cover / C.P. Cover / Inspection Pit Cover in Ward No-23
RESTORATION OF COLLAPSED SEWER LINE NEAR 39 CANAL WEST ROAD ALONG WITH RAISING OF SOME DEPRESSED MANHOLES ALONG CANAL WEST ROAD IN WD NO 12 UNDER BR II
REPAIRS TO IP AND CONCRETE PASSAGES AT 18/H/17,18/H/19 GIRISH BIDYA RATAN LANE AND OTHERS UTTARAN AREA IN WARD NO-38
DEVELOPMENT OF PASSAGES FROM X-ING OF 104 M.G RD. TO 3, NIL MADHAB SEN LN. AND 8 TO 1, NIL MADHAB SEN LN. AND ROAD FROM 1 TO 3, NIL MADHAB SEN LN. IN WARD NO-44
Removal of chockage and repairing of Inspection Pits, Catch Pits etc at different places in Ward No-38
ARRANGEMENT OF NECESSARY CIVIL WORK FOR INSTALLATION OF A.C. SYSTEM AT PERSONNEL DEPARTMENT, FIRST FLOOR OF C.M.O. BUILDINGS. 2ND CALL
ROOF TREATMENT, RENOVATION OF SEWERAGE SYSTEM, OUTER SIDE REPAIRING WITH PAINTING AND SOME OTHER ANCILLARY CIVIL WORK OF STAFF QUARTER BUILDING, IN SIDE RAJA SUBODH MULLICK SQUARE BPS.
RESTRICTING AMBIENT TEMPERATURE RISE OF HT SWITCH GEAR ROOM AND CONTROL PANEL ROOM WITH CHANGE OF LIGHTS AND SWITCH AT PARK CIRCUS BPS
ARRANGEMENT OF TEMPORARY AND DECORATIVE LIGHTING SYSTEM AT HARISH MUKHERJEE ROAD AND HARISH CHATTERJEE STREET FOR ENSUING KOLKATA CHRISTMAS FESTIVAL 2025 UNDER LIGHTING ZONE-III.
REPLACEMENT OF BATHROOM PVC DOOR, PIPES AND FITTINGS WITH CHANGE OF CISTERN, BASIN, URINALS ETC AT PARK CIRCUS BPS.
TEMPORARY LIGHTING ILLUMINATION FOR EID-2026 AT NAWAB ALI PARK, EKBALPUR ROAD AND SOLO ANA MASJID WITHIN WARD NO-78 UNDER BR-IX.
ARRANGEMENT OF LIGHTING SYSTEM ON TEMPORARY BASIS AT JUDGES COURT ROAD AND SURROUNDING AREAS DURING THE FESTIVE SEASON WITHIN WARD 74.
Supply, installation and commissioning of the 2.0MGH capacity High-Tension Pump-Motor Set with its allied accessories at the River Water Lifting Station No-1, IGWTP under KMC
ARRANGEMENT OF LIGHTING SYSTEM ON TEMPORARY BASIS AT ELGIN ROAD DURING THE FESTIVE SEASON WITHIN WARD-70.
ARRANGEMENT OF LIGHTING SYSTEM ON TEMPORARY BASIS AT BAKER ROAD, BELVEDERE ROAD AND JUDGES COURT ROAD DURING THE FESTIVE SEASON WITHIN WARD-74.
TEMPORARY LIGHTING ARRANGEMENT FOR CHRISTMAS FESTIVAL-2025 AT MD. KAVI IQBAL ROAD UNDER BR-IX.
LINK CONNECTION WITH LAYING OF WATER SUPPLY 100 MM DIA. D.I. PIPE ALONG WITH INSTALLATION OF CESC METER BOX NEAR 19/5B, D P P ROAD, WARD 100, BR-X
RESTORATION OF LEAKY WATER MAIN,CHECKING WATER SCARCITY,TRIAL PIT, ETC AT G.M. ROAD, MID ROAD,P.K.ROAD AND OTHER LOCATIONS IN WARD 129 BR.XIV
REPAIRING OF ALLUMINIUM DOORS AND WINDOWS, PARTITIONS, REPLACING OF BROKEN GLASSES ,REPARING OF DAMAGED SANITARY FITTINGS WITH NECESSARY PLUMBING WORKS AND WITH RELATED ANCILLARY CIVIL WORKS AT PEACE WORLD ,MOURNERS WAITING BUILDING
MAINTENANCE OF DAMAGED PAVER BLOCK SURFACE ALONG 22 TO 32 ELLIOT ROAD, 12/H/12 TO12/H/36 BEDFORD LANE AND DIFFERENT PLACES TO PREVENT ROAD DUST IN WARD NO- 61
MAINTENANCE OF DAMAGED ROADS AND POT HOLES BY CEMENT CONCRETING ALONG 19 BEDFORD LN TO 42 RIPON LN, 1 TO 26 ELLIOT LANE AND DIFFERENT PLACES TO PREVENT ROAD DUST IN WARD NO- 61.
ELECTRIFICATION WORK FOR COMMUNITY HALL INCLUDING WARD OFFICE AND ICDS UNIT AT 16 JADUNATH DEY ROAD IN WARD NO-47
REPAIRING OF UTTARAN IP ,PAVER BLOCK SURFACE AT 19 GOABAN ST.,33,34 GORACHAND BOSE RD, 32/2 SAHITYA PARISHAD ST, ETC IN WARD NO.16
RESTORATION OF F.W. SUPPLY BY REPAIRING OF LEAKS OF 150 MM, 250 MM. AND 300 MM. DIA. MAINS NEAR 10/2 C.N. ROY RD, 19 KUSTIA RD, 20 TOPSIA RD. AND DIFFERENT SPOTS IN WD. NO. 66.
MENDING OF ROAD SURFACE INCLUDING FOOTPATH NEAR 400,401/1,398,JNAN GOSWAMI SARANI, BLOCK-G, NEW ALIPORE, ETC IN WARD NO-81, BR-X.(SCHEME ID -APAS/01/160/7/0002)
SHIFTING OF EXISTING SERVICE MAINS, REPAIRING OF DAMAGED PIPES,FITTINGS,HSC AND ALLIED WORKS FOR EXECUTION OF SANDD DEPTT.S WORK NEAR 22,413/1,377 HARIDEVPUR NEW ROAD,29A,319/G B.B.ROAD, 1227,234,514D/1 U.A.K.SARANI ETC. IN W-122, BR-XIII
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT ATABAGAN D BLOCK AREA FROM PRE. NO.93/1 TO SANI MANDIR IN WARD NO. 111 UNDER BR XI
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT GHOSH PARA ROAD FROM V-53/6 TO V-54/43 GHOSH PARA ROAD IN WARD NO. 111 UNDER BR XI
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT BANDIPUR ROAD FROM 291 TO B-25 BANDIPUR ROAD IN WARD NO. 113 UNDER BR XI
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT ATABAGAN B BLOCK AREA FROM PRE. NO. B60/1 TO 100,BORAL MAIN ROAD IN WARD NO. 111 UNDER BR XI
CONSTRUCTION OF WOMENS TOILET COMPLEX CUM BABY CARE ROOMS UNDER KOLKATAR 10 DIGANTA SCHEME AT 25/3, OPPOSITE OF ASHUBABU BAZAR, PAIKPARA IN WARD NO 03 UNDER BOROUGH-01
RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT SAHID BENOY BOSE ROAD FROM 1 NO.SAHID BENOY BOSE ROAD TO BENOY BALLIKA GIRLS SCHOOL IN WARD NO. 113 UNDER BR XI
STRENGTHENING OF LEAKY PORTION OF 1500 MM X 1200 MM DIA Y-CONNECTION POINT ON DELIVERY MANIFOLD OF CWPS-III WITH OTHER ALLIED WORKS UNDER GRWW.
CONSTRUCTION OF SURFACE DRAIN FROM TRANSFORMER ROOM TO MAIN GATE AT STATION NUMBER 4 AT TALLAH PUMPING STATION
REPAIRING WORKS AT HIGH MAST IN FRONT OF BRC CLUB, RABINDRANATH STATUE AND ADJACENT AREAS OF DEBAKI BOSE LANE AND LAKE-GARDENS STATION ROAD AND FLYOVER UNDER BR-X.
IMPROVEMENT OF LTG. SYSTEM AT P.A.SHAH ROAD CONNECTOR TO GANGULY PUKUR IN WARD NO-92, BR-X
REPAIRING OF STREET LIGHTING ARRANGEMENT AT DURGAPUR BRIDGE AND ADJACENT AREAS UNDER BR-X
IMPROVEMENT OF ST. LTG. SYSTEM AT NORTH ROAD AND SURROUNDING AREAS IN WARD NO-93, BR-X.
REPAIRING OF STREET LIGHTING SYSTEM AT DAS PARA AND SURROUNDING AREAS IN WARD NO.92, BR-X
DEVELOPMENT OF STREET LIGHTING ARRANGEMENT AT DINESH DAS SARANI, NEW ALIPORE G BLOCK AND ADJACENT AREAS IN WARD NO-81, BR-X.
REPAIRING OF PARK LIGHTING SYSTEM AT JAGANNATH GHOSH ROAD IN WARD NO-91, BR-X.
IMPROVEMENT OF BUSTEE LIGHTING SYSTEM AT NETAJI BUSTEE AREAS IN WARD NO.92, BR-X
PREVENTIVE MAINTENANCE OF GEARBOXES OF INSTALLED BUTTERFLY VALVES AT TALLAH PUMPING STATION.
INSTALLATION OF LIGHTING SYSTEM AT 4G, 6/1G , 4G, 4G/1A NAKTALA ROAD IN WARD 100 BR-X 152/256.
INSTALLATION WORKS OF STREET LIGHT AT NEW POLE WITH FITTING NEAR 298 GANGULY BAGAN IN WARD 100 BR-X 152/267.
RENOVATION WORKS OF ST. LIGHTING 3 DC B.G LANE IN WARD NO-100, BR-X 152/275