Loading…
Loading…
10,595 results • Latest
Construction of Animal Birth and Control ABC Centre Building in Chinnagoundampalayam Tharisu Nilam S.No.366/2B1
Construction of Storm Water Drain at Ward No. 41 Siva Sakthi Nagar Extension (Komberi Kuttai Backside) in Hosur City Municipal Corporation
Dismantling and reconstruction of storm water drain in Alankadu Area Reach 2 in Ward No 43
Construction of RO Plant and Sump at Ward No.09 Avalapalli in Hosur City Municipal Corporation.
Operation and Maintenance of Existing Borewell for the period of 12 Months 01.04.2026 to 31.03.2027 in Ward No 73 West Zone
Operation and Maintenance of Existing Borewell for the period of 12 Months 01.04.2026 to 31.03.2027 in Ward No 72 West Zone
Dismantling and reconstruction of storm water drain in Alankadu Area Reach 1 in Ward No 43
Operation and Maintenance of Existing Borewell Open Well for the period of 12 Months 01.04.2026 to 31.03.2027 in Ward No 45 West Zone
Construction of Dining,Renovation of Toilet and Improvement to Circulating Area at Udayampalayam Corporation Middle School in Ward no.12, North Zone
Operation and Maintenance of Existing Borewell for the period of 12 Months 01.04.2026 to 31.03.2027 in Ward No 38 West Zone
Laying of Drink water main and Distribution pipeline for newly constructed OHT at Lawyers colony in ward no.40,West Zone.
Dismantling and reconstruction of storm water drain in Thiruvalluvar Thottam Main Road and ABT Main Road in Ward No 43
Operation and Maintenance of Existing Borewell for the period of 12 Months 01.04.2026 to 31.03.2027 in Ward No 37 West Zone
Additional improvement Works to Telugupalayam Hospital Building in Ward No.76, South Zone, Coimbatore Corporation
15CFC - Construction of Strom water drain and Culvert at Surya Layout-Main-1 (155003S022), Surya Layout cross (155003S023) Surya Layout-Main-2 (155003S024) in Ward No-03 in Palladam Municipality
Construction of Compound wall at Kavundampalayam Over Head Tank, in Ward Nos. 33 West Zone
Rejuvenation of Deep Bore well Installation of Extension of Upvc pipes Cables connecting specials at KVR Nagar Sivaskathi nagar Ayyan nagar and KRR Thottam in ward no 42
Operation and Maintenance of Existing Borewell for the period of 12 Months in Ward No 35 West Zone
15CFC - Construction of Strom water drain and Culvert at JKJ Colony 1st Main Road (155010R298) in Ward No-10 in Palladam Municipality.
Engaging the contract labour for operation of sluice valves in ward no 93 at Kumiyamuthir area water supply distribution.
Engaging the contract labour for operation of sluice valves in ward no 90 at Kumiyamuthir area water supply distribution.
Construction of Sewage Treatment Plant at koladi with SBR Technogy in Thiruverkadu Municipality
Construction of Storm water Drain and culvert at Arasupallipalayam Irumbukadai santhu Ward No 10 in Dharapuram Muncipality
Extension of borewell pipe line Ward 28 BR Main street street at Dharapuram Municipality
Dharapuram Municipality Extension of borewell pipe line Ward 16 to ward 20 at Dharapuram Municipality
Dharapuram Municipality Extension of borewell pipe line Ward 11 to ward 15 at Dharapuram Municipality
Construction of strom water drain at NGGO Nagar Main Road ward no.4 in Thirunindravur Municipality
SELECTION OF A CATERING AGENCY FOR PROVIDING FOOD TO THE SANITARY WORKERS OF DHARAPURAM MUNICIPALITY FOR A PERIOD OF 3 YEARS
Desilting of Openwell and rising work for sidewall at Balasubramaniyam salai in Sankarankovil Municipality.
Construction of Storm Water Drain at Devipattinam Street West Side in Ward No 13 at sankarankovil Municipality
Reerction of 2.0HP Submersible Pump set at New Bus stand North side Borewell at sankarankovil Municipality
Providing Paver Block Surface in Nallipalayam Government Higher Secondary North School at Ward no.10
Reconstruction of Storm Water Drain at Maruthakutty street in ward no 44 of West Zone
Repair and Maintenance of Toilet Building at AathisankaraVinayagar Kovil Street in Sankarankovil Municipality
Restoration of Cement Concrete Flooring at Annai Sathya Nagar in Ward no 45 of West Zone.
Providing Paver Block Surface in Mohanur Road Girls Higher Secondary South School at Ward no.26.
Repairs and Maintenance of UGD Machinehole Block, Pumping Main line and distribution leakages work for outsourcing labours Ward No.22, 23, 25, 32 and 33
Reconstruction of Storm Water Drain at Maruthakutty Street from Ramalinga Nagar 3rd Street to Church Road in Ward no 44 of West Zone
Providing Paver Block Surface in Mohanur Road Boys Higher Secondary South School at Ward no.26.
Maintenance and Repairs to the old damaged drainage at Thiilakar street in Udumalpet Municipality
Providing BT surface at Villaisalaiyur orphanage to Village boundary in Marurpatty.
Reconstruction of Storm Water Drain at Amman Kovil Street in Ward 43 of West Zone.
Maintenance and Repairs to the old damaged drainage at Senjeri road to Karikalan street in Udumalpet Municipality
Operation and maintenance of existing borewell in Ward No 87 for a period of Twelve Months South Zone.
Providing GI waiting shed with CC pavement in front of UPHC in Ward.No.21
Providing of Water supply Distribution main at Kandiyamman nagar in ward no 42
Providing BT at Chandrasekar Layout Cut Road in Ward No 02 at Udumalpet Municipality
Operation and Maintenance of existing borewell all areas in ward No.98 for the period of One Year
Re-Constuction of Strom Water Drain with cover slab Natarajapuram 4 th street in ward no.15 in Namakkal City Municipal Corporation
Providing CC Pavement in Natarajapuram 4th cross street at Ward.No.15 in Namakkal City Municipal Corporation