Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
79 results • Latest
Purchase of Soil Moisture sensor
Provision of Power Supply for UPS Units and UPS Output Socket Points in Thermal Science, Thermal Management, CFD and Drone Labs
SITC of Motor Set in 3 STP of NITC
Electrical Infrastructure Improvement for Scientific Computing Lab-MAT 103
Upgradation of Electrical Panel Board at Guest House
Purchase of Fluorescence Microscope
Construction of RCC drainage system and interlocking at the back side of SOMS building
Construction of a semi-permanent structure for the storage of specimens and casting of concrete for the Concrete, Strength of Materials, and Structural Engineering Laboratories (CED)
Foundation work and retaining wall construction for proposed pre fabricated tank at MBH STP
Construction of RCC drainage system from creative zone towards NLHC
Painting and Maintenance Works for 20 nos FC Apartment
Electrical Wiring and Fixture Installation at CCD Office
Replacement of Damaged Roofing Sheet Screws at NLHC and GRTT
Construction of internal road to Filter House, Apartment A and B and closure of external access gates
Toilet Renovation and Maintenance Works of 20nos FC Apartment
Wiring for proposed cooks room at Guest House
Electrical Works for MT Lab Extension-DAP
Providing UPS Wiring and Sockets for Offshore PG Computer Labs CED
Civil works for proposed biogas plant near MHBI
Revamping works at Architectural Lab to COE Lecture Hall and Conference Room for COEUPD NITC
Purchase of Structural Sensing Kit
Construction of Rooms Under the Water Tank Near the Guest House
Electrical Infrastructure Installation at MB 307
Earth pit maintenance of substation common earthing-reg
SITC of Occupancy Sensor at Various Campus Buildings as Energy Saving Measures
Construction of shed for Waste to manure facility near Mega Boys hostel
Electrical Renovation of Concrete Lab
LEAK PROOFING OF A PORTION OF TERRACE IN THE DINING BLOCK OF MHB I
Replacing old incoming cables and DBs of quarters to accommodate the demand Phase 1