Loading…
Loading…
1,580 results • Latest
Repairing of bearing seats of gearbox for conveyor system of section II of CHP Jayant Project, NCL.
Repairing, maintenance, overhauling and filtration of 11 nos. of transformer at various distribution substations in township, Block-B Area.
SHACKLE, D, 50TON, SLING WEB, 6M, 20T, POLYSTR, RND, TWIN PTH, SLING WEB, 10M, 12T, POLYSTR, RND, TWIN PTH, LADDER, 30FT, FBR, HELMET, SFTY, PLYPRLN, 540MM, W LAMP, 30LMN, WHISTLE, MOUTH, LADDER, FRP, EXTENDED 12M, F ELECTRICAL USE, CPLG HOSE, MXF, F FIRE FGHTNG HOSE 63MM, SUIT FIRE PROTECTIVE, FRE FIGHTING, EXTINGUISHER FIRE, ABC, 5KG, EXTINGUISHER FIRE, DCP, 5KG, EXTINGUISHER FIRE, MECH FOAM, 9L, FLODLIGHT, LED 350 W, 110 TO 270V, LONG RANGE, LIFE BUOY, RING, UV PRF NYLON, IS MMD APRVD, JACKET SAFETY, LIFE, L, HELMET, SFTY, HDPE, IS 2925, 540 TO 590MM, WHITE, GLV, HND, CANVAS, FREE SZ, F HNDLNG IRON, EXTINGUISHER FIRE, CO2, 5KG, JACKET SAFETY, FLURSCNT, L, KIT, SFTY, HARNESS, FULL BODY, ANGL GRINDER, 1200W, 230V, 100MM, 10000RPM, GAS, DA, W CYLINDER, CYL COMPRESSED GAS, O2 99.99 PCT, 7CUM, TORCH CUTTING, GAS, W NOZZLE 250X450MM, SHOVEL, RND NOSE, 13X10 1 BY 4IN, SHOVEL, HND, SQ NOSE, 300 X 230, THK 1.52MM, SHACKLE, D, 80TON, SHACKLE, D, 10MT, SHACKLE, D, 4MT, SHACKLE, D, SCRW, FRGD STL, 25TON, SHACKLE, D, SCRW, FRGD STL, 05TON, SHOVEL, 300MM, 4 PRONGS, CROWBAR, 1680MM, 11 KG, JACK, MECH, 50TON, CROWBAR, 150MM, 31 MM, SHACKLE, D, 3TON, SHACKLE, D, 1TON, CROWBAR, OCTGNL, 1650MM, WD 29 MM, BLOCK TACKLE, CHN PLLY, 1.5TON, BLOCK TACKLE, CHN PLLY, 3TON, BLOCK TACKLE, CHN PLLY, 10TON, REGULATOR PRESSURE, DBL STGE, F OXYGEN, REGULATOR, PRESSURE, D.A.GAS DBL STAGE, ARRESTER, DA, TO BE FITTED AT REGULATOR, ARRESTER, O2, TO BE FITTED AT REGULATOR, DIVIDER, DNGR PYRAMID, FBR GLS, F RD, GLV ELEC, HND, 33KV, W ISI SPCIFCATN, WRENCH SET, BX, 8 TO 32MM, W SPANNER RACHED, FRAME HAND HACKSAW, W BLADE 12 INCH, SOCKET WRENCH SET, 8 TO 32MM, 1BY 2IN, APRON, LTHR, WLDNG, GLV, HND, FULL, LTHR, F WLDG, WELDING SCREEN, HELMET, SLBT, GOGGLES, PLN, WHT, BELT SAFETY, 3M, 10MM, 2000KG, IS 3521, SLING WEB, 2M, 1000KG, POLYSTR, RND ENDLESS, SLING WEB, 4M, 30TON, POLYSTR, EYE, SLING WEB, 5M, 2000KGS, POLYSTR, SLING WEB, 8M, 10000KGS, POLYSTR, SLING WEB, 5M, 8TON, NYLN, PLYSTR, SLING WEB, 10M, 5TON, NYLN, PLYSTR, ENDLESS, SLING WEB, 6M, 25T, POLYSTR, RND, TWIN PTH, SLING WEB, 6M, 16TON, POLYSTR, DBL PLY
Complete repairing of motors of 250 KW (04 nos.) and 187 kW (04 no) required at CHP, Jayant Project
Repairing of 03 Nos. 50Ton hydraulic jacks and pump and 06 Nos. chain pulley blocks used in CHP, Jayant Project.
Annual maintenance and replacing damaged spares (including repairing) of 100 kVA DG set installed at GM office, Block-B Area for 02 years.
Spares of Mineline Private Limited
Construction of 100-bed Boys Hostel at Government Polytechnic College, Pachaur, Singrauli (M.P.)
- Repairing of 04 nos. Front Suspension applicable to CAT777E, 100T dumpers.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper, Isuzu Dmax, Tata Xenon; The vehicle Should not have completed three years from the date of its first registration at the time of bid opening date; less than 10000..
Repairing of Radiator Assembly of BH100 Model Dumpers of Block-B Project
Repairing of Alternator assembly of BH100 and CAT777E Model Dumpers of Block-B Project
SCREEN GP MAGENTIC Part No. 4S8603, HOSE AND TUBE AS No. 4569159, HOSE AND TUBE AS No. 4569157, ARM AS-TIGHTENER BELT DRIVE No. 3803121, PLATE AS No. 3000056, VALVE SHUTOFF No. 2353589, BRACKET No. 2175693
Spares of Pulleys for 24 96 Dragline
SPHERICAL ROLLER BEARING PART No. 90320053
Metal Oxide Surge Arresters Without Gaps For A.C. Systems (V2) Conforming to IS 15086 (Part 4) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number ( ) : GEM/2025/B/6114401 Dated : 28-04-2025 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Estimated Bid Value 223800 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 4 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : STAFF OFFICER (MM) NCL Singrauli Madhya Pradesh, COAL INDIA LIMITED, Northern Coalfields Limited, Ministry of Coal (Swapneel Pipaliya) UIN Number NCTGC2415P MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
SEAL KIT, Part No. 349112420000, SEAL KIT, Part No. 349112310000, SEAL KIT, Part No. 349112390000, AUTOMATIC DRAIN VALVE, Part No. 950AS02285, AUTOMATIC DRAIN VALVE KIT15, Part No. 950SK00116, SEAL KIT, Part No. 349112460000, AIR CYLINDER, Part No. 355AS02087, BUSH, Part No. 758TH21155, BUSH, Part No. 758TH21171
Facility Management Services - LumpSum Based - Hospitality; Housekeeping; Consumables to be provided by service provider (inclusive in contract cost)
Procurement of Spares of Air Compressors (IRMake) for use in Draglines
Dismantling/assembling of both sides track frames, removal of damaged/broken guard track bolts, repairing/re-threading of damaged mounting holes,fitting of track guards in both track frames of IDM-70 (19) drill machine of East section.
AMC 05 Nos. of Air Conditioners fitted in Operator Cabin of REL-750E (1, 4 and 5), REL-650D (6 and 7) Drills of Jayant Project for the period of One Year (365Days).
Oil Seal Part No– DRS660X3000S2020, Liner 1 Part No– DRS660X3000S111, Liner 2 Part No– DRS660X3000S112, Liner 3 Part No– DRS660X3000S113
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero, Mahindra TUV300, Mahindra Scorpio; The offered vehicles should not have completed 3 years from the date of its first registration from RTO at the time of last date of su..
Repairing of brake assembly of Vehicle No UP64AT7276 Fire Tender and replacement work of windshield of Vehicle No UP64BT7775 Road Sweeping Machine at Krishnashila Project
Day to day repair and maintenance of Air Conditioners and Water Coolers installed at various locations of Krishnashila Mines for Two 02 years at Krishnashila Project
Hiring of 12/14 Ton Crane for Heavy Material Handling at EnM Field and CHP Section for 365 Days as and when Required at Krishnashila Project
WHEEL BLOWER, Part No. 4741258, MOTOR, Part No. 4741252, SWITCH, Part No. 4741256, MONITOR- PHASE, Part No. 4753167, THERMOSTAT, Part No. 4741264, DRIVER FILTER, Part No. 1214733, TRANSFORMER, Part No. 4741296
Hiring of Diesel Pump Slurry Pumps Submersible Pump required at Krishnashila CHP during Monsoon 2026 at Krishnashila Project
Installation Dismantling and Shifting of PumpMotorPontoonStarter Field Switches Pipelines flexible andor MS andor GI etc Cables Hoses along with all other related accessories before andor During Monsoon 2026 as and when required for monsoon
Core Assy Radiator, 9Y3318, Spider Assy Fan (8- Blade), 3627762
Facility Management Services - LumpSum Based - Industrial; Operation of fire fighting at coal stock yard on daily basis for 365 days at Nigahi Project; Consumables to be provided by service provider (inclusive in contract cost)
Part No-3094391, PAN OIL
Battery operated Torque Wrench 800, Battery operated Torque Wrench 500
Procurement of centralized spares sub-assemblies of Revathi Equipment Ltd make drills RECP-650, RECP-750E and RECP-850E against MB 2025-26
Conclusion of Rate Contract for Supply of Spares of Kirloskar make Pumps for 02 years
GEAR CASE BOTTOM KBH280, INPUT STAGE ASSLY KBH280, INTERMEDIATE A STG ASSLY KBH280, GEAR CASE TOP KBH280
SCRAPER GEARED MOTOR Part no. TB2486, SCRAPER GEAR BOX Part No. - TB2206
GREASE NIPPLE-part no.-000525910, MOUTH PIECE-part no.-000449510, GREASE PUMP-part no.-AH4200, AIR OPERATED OIL PUMP-part no.-AN4200, OIL CONTROL VALVE-part no.-000321921, GREASE HOSE ASSY-part no.- 3343, PRE SET OIL FILL METER-part no.-0009162116, GRES PISTAL ASSY-part no.-2188, AIR HOSE-part no.-250401370, REPAIR KIT OF OIL PUMP-part no.-13046968A, REPAIR KIT OF GREASE PUMP-part no.-000469680, OIL HOSE ASSY-part no.-000328341, QUICK COUPLER ASSY-part no.-000515400, Z SWIVEL-part no.-000449520, HOSE FITTING-part no.- 000450280, NON RETURN VALVE ASSY-part no.-000314712, HOSE-part no.-0710271004, FILTER ELEMANT-part no.- 000317821, AIR FILTER ASSY-part no.-000213970, PRESSURE SWITCH ASSY.-part no.-00031075A, DRAIN VALVE AUTOMATIC-part no.-A069321, KIT NON RETURN VALVE ASSEMBLY 2 BSP-part no.-022400849
TUBE_360986, TUBE_3609187, TUBE_3609188, TUBE_3609189, TUBE_3605601, TUBE_3550551, TUBE AS WATER_4496127, TUBE AS WATER_4356257, TUBE AS WATER_4357954, ADAPTER_3E5276, ELBOW_5P4318, CONNECTOR _PORT_1P1376, Bolt_2D6374, strainer_4N0913, ELBOW_2301294, ELBOW_2301296, FUEL RETURN LINES REAR_4569157, FUEL RETURN LINES REAR_4569159, FROM FUEL FILTER TO FUEL BLOCK FRONT_3758202, FUEL_TRANSFER_PUMP _TO_FUEL_ FILTER_3764254, manifold_4341522, Bracket as_4308202, shaft stub rear_2241219, shaft stub rear_2241221, cover_2738703, bell as suction_8N2104, tube_1162699, tube_3780254, BOLT_6K3771, HARNESS AS INJECTOR_5145313
Filtration of Transformer Oil of Transformers installed at Krishnashila Project and Repairing Rewinding of 100 KVA 25 KVA and 6.6 kV Auto Transformers required for Monsoon 2026 at Krishnashila Project
Repair maintenance Testing and Commissioning of Field Switch Motor Starter and HT Feeders of Main Workshop substation s for Monsoon 2026 at Krishnashila Project
Repairing and Strengthening of HT overhead lines GOAB Switches Cable termination Kit Erection Dismantling Rerouting SAG tightening of HT overhead lines as required of any feeders of CHP Mines Field and Township for Monsoon 2026 as and when required..
Supply Installation and Commissioning Making of maintenance-free earthing with earthing pits Lighting Arrestors Surge Arrestors at various locations of mines and CHP feeders in view of safe and reliable operations as per requirement for monsoon 2026
Repairing of 10UPH6 10UPH4 Make Kirloskar and 03 Nos of Wilo MandP Pumps required for monsoon 2026 at Krishnashila Project
Fabrication of One New Pontoon and Repairing of 04 Nos existing pontoon floating drum structure including their shed and railings and fixing of mesh grizzly on existing and newly fabricated ladders/ stairs and its strengthening for monsoon 2026 at Kr
Fabrication of universal joint moving units and MS Bends of different sizes and repairing of Non Return Valve Sluice Valve required for monsoon 2026 at Krishnashila Project
Offloading of demounting and mounting work of 05 (five) nos. of engines and 05 (five) numbers of transmissions for 17 (seventeen) numbers of dumpers and water tankers of Khadia Project, for a period of 01 (one) year (365 days).
CONTROLLER PULL DOWN Part No. 2657826349, FITTING HYD Part No.95352738, SWITCH LIMIT Part No.57055840, DUCT HOSE 3 X 20 LG Part No.2658626638, PRESSURIZER AC Part No.2658625826, KIT ELECTRICAL AC Part No.2658665243, HOSE ASSLY Part No.2658678761, HOSE ASSLY Part No.2658678768, WIRE HARNESS Part No.2658678831, O- RING Part No.2658694385, HOSE ASSLY Part No.2658694413, HOSE ASSLY Part No.2658694420, FILTER Part No.2659618963, SUB XOVER 6.63R P by 8 BE BX Part No.57003154, ROD SEAL ASSY- VERTICAL Part No.57426793
Refrigerant Charging and maintaining of the air conditioning system in Operators Cabin of Dozers and Drills, Working at Bina Project.
TOOLS AND CONSUMABLES FOR FIELD WORKSHOP