Loading…
Loading…
14 results • Recent activity
Towards providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering,Coursed Rubble Masonry,centering and shuttering including strutting, propping, etc. as mentioned in BoQ.
Towards supply, installation, testing and commissioning of suitable wattage street light fixtures, supplying and laying of one number PVC insulated and PVC sheathed 4 Core 10 SQMM copper armoured power cable of 1.1 KV grade ,etc.as mentioned in BoQ
Earth work in excavation by manual means in foundation trenches or drains, filling available excavated earth, supplying and filling in plinth with sand under floors,providing and laying in position cement concrete ,etc. as mentioned in BoQ
Towards the dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually,demolishing brick work manually,providing and laying in position cement concrete of specified grade,etc. as mentioned in BoQ.
Earth work excavation by mechanical means,excavating trenches of required width for pipes, cables, etc ,providing and laying in position cement concrete of specified grade excluding, reinforced cement concrete, etc. as mentioned in BoQ
The scope of work shall include supply of good quality conservation materials such as stone lime, special size old bricks, sukhi 1st class machine made, brick khoa,mud(day) of good quality, coarse sand, non-modular bricks,etc. as mentioned in BoQ