Loading…
Loading…
106 results • Recent activity
MR to Spillway gates and head regulator gates including gate operation gauge painting and gauge reading for Kharif Irrigation in cw Tatko I Scheme during the year 2026-27.
M/R to Guard wall near 195m, 525m of LBMC-1 and 950m of LBMC-2 in connection with Fuljore I Scheme.
M/R to Down side retaining wall of the pipe culvert near 5450m and bank strengthening in between 5650 m to 5900 m of LBMC in connection with Tatko I Scheme.
MR to inlet pipe at 4350,4380,4450 and 4510m respectively along with lining repair in between 4350 to 4510m in cw Futiary I Scheme at P.S- Hura, Dist- Purulia during the year 2025-26.
Maintenance and repair of spillway portion of Bandajore Irrigation Scheme at P.S. Raghunathpur, Block. Raghunathpur-II, District- Purulia.
M/R to Inspection path in between Ch. 36.00 to Ch. 68.00 of DY-3 of Bandhu Main Canal of Bandhu (I) Scheme under Purulia Construction Division (I) in Block and P.S.-Arsha, Dist.-Purulia