Loading…
Loading…
20 results • Recent activity
Drilling lowering assembly and development of mini tube well 60 metre deep
Construction of 1024 No. Manhole Chambers, 50 No. Flushing Tanks, 1024 No Inspection chambers, Laying, Jointing Testing of DI pipe, Providing Laying Jointing and Testing of HDPE Pipe 160mm dia for Zone 2
Construction of underground storage tanks of different capacity at various locations C o buffer storage tanks of 60,19,333 litre capacity provision for plant operator residence P L Jointing of distribution system gravity main of MSERW pipe 200mm etc.
Providing Laying and jointing of HDPE pipe 450mm dia at RD 350 to 2200 1850 Rmt C o Nallah Crossing 1 No. and RCC Kuhl at RD 4600 to 4800 200 Rmt 5800 to 6800 1000 Rmt. FIS Dai Di Kuhl
Construction of RCC Main Kuhl at RD 0 to 350 350 Rmt Desilting tank 1 No Providing laying and jointing of HDPE Pipe 355 mm dia at RD 350 to 2200 1850 Rmt C o Nallah Crossing 2 Nos and RCC Kuhl at RD 3200 to 3400 200 Rmt 4400 to 4600 200 Total 600 Rmt
Providing Laying and jointing of HDPE pipe 355mm dia at RD 350 to 2200 1850 Rmt, C o Nallah Crossing 1 No. and RCC Kuhl at RD 2200 to 3042.80 842.80 Rmt FIS Mian Fateh Chand Kuhl