Loading…
Loading…
1,281 results • Latest
Permanent Restoration of Maroge Balihote to Adhwa Road Stage I Pkg No JK04 22 Phase V Length 24.325 Km Block and District Ramban PIU RAMBAN
Construction and Maintenance of road from L043-(Link Road) Chill to Bagodh (Using Waste Plastics), Package No. JK14-4220, PMGSY-IV (Batch-I, 2026-27), Block Ramnagar, District Udhampur, (Length - 2.00 km)
Construction and Maintenance of road from L083-(Link Road) Bhatyari to Karali (Using Waste Plastics), Package No. JK14-4221, PMGSY-IV (Batch-I, 2026-27), Block Ramnagar, District Udhampur, (Length - 2.00 km)
Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report and Getting it vetted from DIQC NIT IIT for 22 No. of missing bridges
Permanent Restoration of Seri Rakhwala to Bhagatpur road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-174, Block Marh, District Jammu
Permanent Restoration of Chowadhi Rewali Ward No-6 to Ward No-8 road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-96, Block Purmandal, District Jammu
Permanent Restoration of Gazian to Mahshian road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-144, Block Miransahib, District Jammu
Construction and Maintenance of Road L027-(Link Road) KM 6th Gangalwar to Sarsi Part I road to Gigrota Package No. JK04-4029, PMGSY-IV, Batch-I of 2026-27, Block-Khellani, District Doda Length 5.000 Kms
Construction and Maintenance of Road from L079-(Link road) Budhan Lancha KM 4th PMGSY Road to Hill Package No. JK20-4249, PMGSY-IV, Batch-I of 2026-27, Block-Thuroo, District Reasi. (Using Waste Plastics 6.450 Kms) Length 6.450 Kms
Construction and Maintenance of Road L033-(Link road)Mandi Loran Road km 4.3 to HundiNar Package No. JK11-4056, PMGSY-IV, Batch-I of 2026-27, Block-Loran, District Poonch (Using Waste Plastics Length 6.563 Kms) Length 6.563 Kms
Construction and Maintenance of Road from L040-(Link Road) Ghordi Khas to manlal Km 11th to Karlah Mandal Package No. JK14-4051, PMGSY-IV, Batch-I of 2026-27, Block-Chanunta Dalsar, District Udhampur. (Using Waste Plastics 3.850 Kms) Length 3.850 Kms
Construction and Maintenance of Road from L022-MS Kanneity to Moh Sarpanch(Link Road) Package No. JK12-4204, PMGSY-IV, Batch-I of 2026-27, Block-Nowshera, District Rajouri (Using Waste Plastics Length 4.000 Kms) Length 4.000 Kms
Construction and Maintenance of Road L048-Link from km 2nd of Hasplote Pangai road to Danna Katarian Package No. JK12-4558, PMGSY-IV, Batch-I of 2026-27, Block-Thanamandi, District Rajouri Length 3.300 Kms
Permanent restoration of roads T01-T02 Km 38th to Jakhole, JK07-280, Block Barnoti and NH1A Km 55th to Surara Pkg No. JK07-WB01 District Kathua
Permanent restoration works of road namely Manjakote to Mangalnar Length 7 Km, Nelli to Hayatpura Length 8.00 Km
Permanent Restoration of Road MRL-01 Jandial to Rabta Package No.- JK05-3012, Length 17 Km , Block MATHWAR, and JABTA TO CHALLANI PACKAGE NO.JK05-97,LENGTH 5 KM, BLOCK PURMANDAL, DISTRICT JAMMU.
Permanent restoration of damaged roads of block Kathua, Nagri and Keerian Gandyal Pkg No. JK07-251, JK07-03, JK07-149, JK07-252, JK07-253, JK07-255, JK07-03, JK07-81, JK07-41, JK07-77, JK07-258, JK07-01, JK07-42
Permanent Restoration (Flood) of various roads from Machhedi to Drabber, Pkg No. JK07-205 (Length 38.80 Km, Block Lohai Malhar, Kishanpur to Lornu Pkg No. JK07-WB03 (Length 10 Km), Block Billawar, Riar to Baggan Part-II, Pkg No. JK07-221 Lngth 10km
Permanent Restoration of Road from Sangambatti to Sigdi, Package No. JK04-256, under SASCI-I
Permanent restoration work of roads namely Sabzi to Chalabagla Pkg No. JK12-136 Block Darhal, Sora Bridge to Khablan JK12-138 Block Thannamandi, L031 to Bari Darhal (Length 8.2 Km) JK12-329 Block Darhal
Permanent Restoration of Road from Udil Gujran to Batwari, Package No. JK04-258, under SASCI-I
Permanent Restoration of T01 to Dhalot via Talour road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK21-3004, Block Sumb, District Samba Call 2nd
Permanent Restoration of T01 to Talour road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-220, Block Sumb, District Samba Call 2nd
Permanent Restoration of Talour to Markoli road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-165, Block Samba, District Samba .Call 2nd
Permanent Restoration of Rakh Ambatali to Manohar Gopala road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-164, Block Sumb, District Samba Call 2nd
Permanent Restoration of Bharatgarh to Hardulivian road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-163, Block Nud, District Samba Call-2nd
Permanent Restoration of Bhalwal to Pindi Via Rajpora road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-3003, Block Pragwal, District Jammu
Permanent Restoration of Mehra Mandlik to Gangwan and Link Road to Sujatpur road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-01, Block Marh, District Jammu
Permanent Restoration of Kachrial (Shmuan) to Chaprial road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-205, Block Samwan, District Jammu
Permanent Restoration of Sarna to Mahurgarh road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-124, Block Samba, District Samba
Permanent Restoration of Nud to Sarain road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-100, Block Samba, District Samba
Permanent Restoration of Baleeni to Kattal Batal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-132, Block Nagrota, District Jammu
Permanent Restoration of Sari Khurad to Suhawada road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-162, Block Dansal, District Jammu
Permanent Restoration of Jagti to Bamyal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05- 194, Block Dansal, District Jammu
Construction and Maintenance of Road from L025-(Link Route) Rajani to kamala Package No. JK05-4044, PMGSY-IV, Batch-I of 2026-27, Block-Samwan, District Jammu Length 4.000 Kms
Construction and Maintenance of Road L037-link road bhalwal To Ambkhori Package No. JK12-4406, PMGSY-IV, Batch-I of 2026-27, Block-Sunderbani, District Rajouri (Using Waste Plastics Length 5.220 Kms) Length 5.220 Kms
Construction and Maintenance of Road L024-(Link Road) From Nagrota Kharmath Road KM 2nd to Nakki Package No. JK07-4011, PMGSY-IV, Batch-I of 2026-27, Block-Basohli, District Kathua (Using Waste Plastics Length 8.500 Kms) Length 8.500 Kms
Construction and Maintenance of Road from L034-(Link Road) LOWER RAJWALTA TO Moh. Rehan Bural Padhal Package No. JK07-4542, PMGSY-IV, Batch-I of 2026-27, Block-Nagrota Gujroo, District Kathua (Using Waste Plastics Length 11.800 Kms) Length 11.800 Kms
Construction and Maintenance of Road L027-(Link Road) From Mahanpur Basholi Road KM 18th to Dugagran Package No. JK07-4043, PMGSY-IV, Batch-I of 2026-27, Block-Dhar Mahanpur, District Kathua (Using Open Graded Premix Carpet (OGPC) Length 8.000 Kms) L
Permanent Restoration of Roads from Gagar to Bhimdassa JK14-94
Permanent Restoration of PMGSY road from Kenthamorh to Mahakund, Package No. JK14-45, Distt. Ramban, (Under SASCI)
Construction and Maintenance of Road from L024-(Link Route) Papar Abtara to Papar Brahmana Package No. JK21-4006, PMGSY-IV, Batch-I of 2026-27, Block-Nud, District Jammu Length 4.230 Kms
Construction and Maintenance of Road L095-(Link road) Railway road Sumber to Ragdhar Sarla Package No. JK19-4285, PMGSY-IV, Batch-I of 2026-27, Block-Sangaldan, District Ramban (Using Waste Plastics Length 5.000 Kms) Length 5.000 Kms
Construction and Maintenance of Road L041-(Link Road)Km 2nd of Bharat Keshwan road to Gujjar Basti-Drumri Package No. JK04-4037, PMGSY-IV, Batch-I of 2026-27, Block-Dali Udhyanpur, District Doda Length 4.000 Kms
Construction and Maintenance of Road L042- KM 15TH OF BRO BASUNI ROAD TO DABSI Package No. JK11-4577, PMGSY-IV, Batch-I of 2026-27, Block-Mankote, District Poonch (Using Waste Plastics Length 5.500) Length 5.500 Kms
Construction and Maintenance of Road from L022-(Link Route) Khara to Devsthan Package No. JK21-4005, PMGSY-IV, Batch-I of 2026-27, Block-Purmandal, District Jammu Length 4.600 Kms
Permanent restoration of damaged road Broh to Dungiote JK12-143, road from Dhok Banyar to Meenika JK12-WB01 length 12.60
Permanent Restoration work on Bhatyas to Tendla road
Permanent Restoration on Lo26-Khara km 13th of TKN Road to Tanta road
Permanent restoration work of road ZSBMS to Shahpur, Block NSSB, District Poonch, Package no. JK11-100