Loading…
Loading…
4,782 results • Latest
Permanent Restoration of L074-Kailiwala to Patrada road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-157, Block Akhnoor, District Jammu
Restoration of 09 No. PMGSY Roads under the jurisdiction of PMGSY Division Jammu on Emergency basis i.e. (Motorable paths only) by way of clearance of slips likely to occur during Financial Year 2026-27 (Group-05)
UT 034152 GOPESHWAR POKHARI MR TO BACHHER MR STAGE I AND II
Shifting of electrical installation from PMGSY Road FULBAGAN MORE TO BANGLANI , BLOCK SWARUPNAGAR, North 24 Parganas ( Under the supervision of Baduria Division, WBSEDCL)
Restoration of 05 No. PMGSY Roads under the jurisdiction of PMGSY Division Jammu on Emergency basis i.e. (Motorable paths only) by way of clearance of slips likely to occur during Financial Year 2026-27 (Group-04)
Maintenance (Patch repair) of Road from Parbatipur to Madhyapara
Permanent Restoration of Rehian to Khanwal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-88, Block Samba, District Samba Call 3rd
Permanent Restoration of L027-Khery to Rehal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-178, Block Bishnah, District Jammu
Maintenance (Patch Repair) of Road from Baniban to Syadpuruptosyadpur
Shifting of electrical installation from PMGSY Road BITHARI BAKULTALA TO HAKIMPUR SWARUPDAHA, BLOCK SWARUPNAGAR, North 24 Parganas. Under the supervision of Baduria Division, WBSEDCL
Restoration of 08 No. PMGSY Roads under the jurisdiction of PMGSY Division Jammu on Emergency basis i.e. (Motorable paths only) by way of clearance of slips likely to occur during Financial Year 2026-27 (Group-01)
Shifting of electrical installation from PMGSY road JASAIKATI HALDERPARA TO SANNYA , BLOCK BADURIA, North 24 Parganas. ( Under the supervision of Baduria Division, WBSEDCL )
Restoration of 08 No. PMGSY Roads under the jurisdiction of PMGSY Division Jammu on Emergency basis i.e. (Motorable paths only) by way of clearance of slips likely to occur during Financial Year 2026-27 (Group-02)
Shifting of electrical installation from PMGSY road ATURIA TO KULIA , BLOCK BADURIA, North 24 Parganas. (Under the supervision of Baduria Division, WBSEDCL )
Permanent Restoration on road from Lerh Khas to Parkha Pkg No JK14 306
Permanent Restoration on road from Gole to Baley Pkg No JK14 204
Permanent Restoration on road from Koi to Kolakh Pkg No JK14 719
Permanent Restoration road from Package No. JK14 302
Construction of barrack G12 with a capacity of 200 persons for Yuva Kalyan - Prantiya Rakshak Dal in village-parwar west tehsil-sarojini Nagar in Lucknow district
Slip clearance of Chailusain Devikhet MR Km 5 to Bamoli
Flood Damage Restoration of road from Sasodhar Pator House to Dhananjoy Singh House under Binpur G.P With in Binpur - I Block in the district of Jhargram. Road Length - 650.00 Mtr. (under State Fund)
Slip clearance of Mala to Sirasu
Slip clearance of Pokhal Mandlu MR to Khamana Kinsur to Pokhata
Permanent Restoration of road from L021- Gran to Sukhal Ghathi Part-II, JK14-544, Length-15.125 Kms
Construction and Maintenance of L023-link road Chaktroo Timbra road km 0.700 to U Timbra , PACKAGE NO. JK11-4066, PMGSY-IV, Batch-I of 2026-27 Block- Sathra DISTRICT POONCH (using waste Plastic LENGTH - 2.00 Kms)
Construction and Maintenance of road from L028 Km 1st of Basoni Hansal road to Khana Goda Gopal, Package No. JK11-4534, PMGSY-IV, Batch-I of 2026-27, Block Balakote District Poonch. (Using Waste Plastics) Length 2.92 Kms
Construction and Maintenance of road from L024 (Link road ) Km 1st of Hiranagar OSK road to Rakh Sarkar Package No. JK07-4017, PMGSY-IV, Batch-I of 2026-27, Block Hiranagar, District Kathua (Using Waste Plastic) Length 2.60 Kms)
Construction and Maintenance of road from L028 (Link road) Seri Khwaja Malhan road Km 3.400 to Chakli, Package No. JK11-4120, PMGSY-IV, Batch-I of 2026-27, Block Lassana, District Poonch. Using Waste Plastic, Length-3.0 Kms
Construction and Maintenance of L023-(Link Road)Mundamar Sanglagalli Km 3.0 to Jabber Maiwala, Package No. - JK11-4093, PMGSY-IV, Batch-I of 2026-27 Block- Surankote DISTRICT POONCH (using waste Plastic Length 2.0 km)
Construction and Maintenance of road from L031 PMGSY road Naian Sangpur to Gurah (Link Road) Package No. JK12-4062, PMGSY-IV, Batch-I of 2026-27, Block Doongi, District Rajouri. (Using Waste Plastics) Length 3.075 Kms
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
epair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Kalikakhali Saradeshwari Balika Vidyapith to Ramkrishnamath via Satya Sahoo House within Chandipur Block.
Sk Moinuddins House to Kalaberia Pitch Road via Kalaberia Old Bridge
Seva Sangha Club to Bacchipur Artoyik Prathamik Vidyalay with guardwall