Loading…
Loading…
4,779 results • Latest
Construction and Maintenance of Road from L024-Batergam Auwoora Km 2nd RD 100 to Takiya Jam Mohammad, Sanctioned Length 4.000 Km Carriageway Width 3.75 mtr. PMGSY-IV (Batch-I, 2026-27), Package No. JK08-4026, PMGSY Division Kupwara
Permanent restoration of Chitterkote Gundigujran road Package No JK08171
Construction and Maintenance OF Road from L028 -(LINK ROAD) FROM KM 2ND OF TOWARA DODLA ROAD TO DUCK Package No. JK07-4033, PMGSY-IV, Batch-I of 2026-27, Block-BHOOND, District Kathua(Using Waste Plastics) Length 3.000 Kms
Construction and Maintenance of L027-link road Kerni Colony new Basti road km 0.5 to Pawan Therari , PACKAGE NO. JK11-4072, PMGSY-IV, Batch-I of 2026-27 Block- NSSB DISTRICT POONCH (using waste Plastic LENGTH -3.03 Kms)
Permanent Restoration of Jamotia to Pail via Bade Pail road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-80, Block Bhalwal Brahmana, District Jammu
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year Maintenance (BW)
Construction and Maintenance of Road from Dildar Teetwal Km 9 RD300 to Beiadi, Sanctioned Length 4.500 km, Carriageway Width 3.75 mtr. PMGSY-IV (Batch-I, 2026-27), Package No. JK08-4040, PMGSY Division Kupwara
Construction and Maintenance of Road from L021- Dudi Chuntwari Km 6 RD 100 to Chuntwari Bala, Sanctioned L-4.500 km, Carriageway Width 3.75mtr PMGSY-IV (Batch-I, 2026-27) (Waste Plastic Technology), Package No. JK08-4012, PMGSY Div Kupwara.
MH30105 Proposed Construction and Maintenance of Road From VR-81 to Dehnoli - Katkariwadi Road Km. 0/00 to 1/250 Km Taluka - Murbad, Dist -Thane
UT034215 L093- Rishikesh Badrinath NH to Jaikandi Gwaad MR Stage I And II
UT084411, L094- Maithanaghat to Khitothiya MR Stage -1 and II, Length- 3.910km.
UT094572 Construction of L076- Kafaldungri Sanghar Bastey Motor Road to Salkot Motor Road Stage- I and II
L074-Garbadhar To Galagad Motor Road Stage I and II with 5 Year Maintenance Under PBMC
UT024125-Leti to Sisakhani MR Stage-II, Length-3.00 Km
L021-Gairlekh-Pathriya MR Stage-I and II, Length-2.00 Km
UT024123-Chaura to Kholiyagaon MR Stage-II, Length-8.400 Km
Permanent Restoration of road from Katwalt to Gali Mandola, Under Package No. JK14-307, Block Chenani, District Udhampur
UT01451 L036-L047 Korichina Bagwali MR to Dotal Gaon Motor Road, Length 7.00 Km. Stage-I and II
Permanent Restoration on road from Block Boundary Chenani to Dalsar Khas Pkg No JK14 505
Permanent Restoration on road froMm Roun to Sudgar JK14356
Permanent Restoration on road fromGathyal Morh to salara Pkg No JK14 663
Construction and maintenance of road from L026 Link Road Gingal to Bijhama RD 6500 to Jabadar Length 1 60 Kms Stage Complete Carriageway width 3 75Mtrs PMGSY IV Batch I 2026-27 Package No JK03 4509 PMGSY Division Uri
Construction and Maintenance of road from L115-(Link Road) km 8th Jib Thathi road to Patta Kotli (Using Waste Plastics), Package No. JK14-4020, PMGSY-IV (Batch-I, 2026-27), Block Udhampur, District Udhampur, (Length - 2.410 km)
Providing and erecting Hoarding, Banner, Poster and Flag for Pathasree and Banglar Bari from Vidyasagar Setu to Kona More up and down in the district of Howrah
Construction of 3 Km Concrete Road from Dhalhara Upa Sasthya Kendra to Bagchari Bus Stand within Keshpur Block in the district of Paschim Medinipur. Length 2.570Km
Ekrasol To Satsol Pitch Rd. within KESHPUR Block in Paschim Medinipur District Length 1.771 Km
Construction and Maintenance of Roads and LSBs
Construction and Maintenance of Road L031-Guzzer Gurinall End Point to Aripora Package No. JK17-4023, PMGSY-IV, Batch-I of 2026-27, Block-Inderwal, District Kishtwar Length 2.600 Kms Adv. Cost excluding maintt. but inclusive of GST Rs. 595.35 Lacs
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
UT24136-Naugaon-Kotyura MR Stage-I and II, Length-5.50 Km
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
UT24132-Garur-Dhyonai-Kot Tulari MR Stage-I and II, Length-3.78 Km
Permanent Restoration of L056-Gorda to Jakhar road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-154, Block Mathwar, District Jammu
Permanent Restoration of Rabita to Parade road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-86, Block Mathwar, District Jammu
L030- Almora Takula Bageshwar MR to Churari Barali MR, Stage I and II with 5 Years Maintenance under PBMC
Shifting of electrical installation from PMGSY Road MUKUNDAPUR TO BOYRA VIA BHOYDA , BLOCK HAROA, North 24 Parganas.( Under the supervision of Baduria Division, WBSEDCL
UT01432 L034-Masi Aadigaon Jaurasi MR KM 07 to Timil Gaon Motor Road, Length 8.620 Km. Stage I and II
Permanent Restoration of MRL18-Sohal to Sangrampur Via Bamhal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-3008, Block Akhnoor, District JammuV
UT084545 Vithyani to Dhunga Gadina Motor Road Stage I and II
Maintenance (Patch repair) of Road from Damodarpur to Paschim kalinagarkachari
L028-Vijaynagar Khokhara road to Vijaynagar Pal Bhiloda to Pravath road To Damor faliyu Road L030-Dadhvav Piplodi Road to Suka Pada Faliyu Road L048-Dalpatpura approach road To Barot Faliyu L119-Royanmala Khetra Approach road To Damor Vadera Bara Fa
CONSTRUCTION OF VARIOUS ROADS OF TALUKA VIJAYNAGAR UNDER PMGSY IV BATCH I 2026 27 PACKAGE NO GJ 21 P2 TA VIJAYNAGAR DIST. SABARKANTHA
UT084421 Charekh to Dhargoan Motor Road Stage I and II
Permanent Restoration of L053-Sohal to Budgal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-168, Block Akhnoor, District Jammu
Shifting of electrical installation from PMGSY Road DHANPOTA BAZAR TO KUCHIA BAZAR VIA KAMARGATHI , BLOCK Haroa, North 24 Parganas ( Under the supervision of Baduria Division, WBSEDCL)
L030 Nawakot-Jogiyana to Titriya Tipri Stage I and II
Permanent Restoration of L074-Kailiwala to Patrada road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-157, Block Akhnoor, District Jammu
Restoration of 09 No. PMGSY Roads under the jurisdiction of PMGSY Division Jammu on Emergency basis i.e. (Motorable paths only) by way of clearance of slips likely to occur during Financial Year 2026-27 (Group-05)
UT 034152 GOPESHWAR POKHARI MR TO BACHHER MR STAGE I AND II