Loading…
Loading…
3,576 live1,531 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,576 results • Latest
Loharu Town Annual Mtc. Works for STPSewage Loharu Town Annual Mtc Works for STP/Sewage
Consultancy Works
Consultancy charges Survey and Estimates parepared Sub Divn No. 2 Hansi
Sohla Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Sohla by DTH Rig
Annual maintenance STP/sewage scheme Siwani Town Annual maintenance STP/sewage scheme Siwani Town
Loharu Town Annual Mtc Works for STPSewage
Loharu Town Annual Mtc Works for STPSewage Loharu Town Annual Mtc Works for STP/Sewage
Pall Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Pall by DTH Rig
Upgradation and Renovation of 5.00 MLD STP Unit I Baldev Nagar in JAL HI AMRIT Under AMRUT 2.0.
Name of Schme Improvement and Augmentation of WSS Lok Bhawan Jammu Phase II under UT Capex Budget. Name of Work 1.Providing and laying of rising main and allied works at Lok Bhawan. 2. Construction of Pump room building at Lok Bhawan.
Installation of Bore well and allied items for irrigation purpose at Kharchak Yarikhah Khansahib near the land of Gul Mir, Block Khansahib, Yarikhah in District Budgam).(Part-A)
Construction of Borewell near House of Tariq Khan at Bunmalpora in District Budgam).
Construction of 02 No of Borewell 01 near house of AB. Rehman Mir and second near house of Mudasir Ahmad Ganie at Shirpor, Sherabad khore in District Baramulla.
Installation of Bore well Tube well near House of Gh Hassan Sheikh at Golpora KKA, Block Narbal, Kawoosa Khalisa in District Budgam)
Special repair and maintenance of damaged HDPE distribution pipe line and FHTC and other allied works at Hudaraite and Adjoining Mouzas of Rajarhat Zone- II etc.
Special maintance work For increasing the functionality of House hold tap connection within command area of Thakdari under Thakdari W-S Scheme etc.
Special maintainance at Patharghata under Patharghata W-S scheme etc.
NIT-14/2026-27/2055-2069
NIT-13/2026-27/2055-2069
Design, supply, installation, testing and successful commissioning of Modernization of Command Area Development at Kaksar Cluster Kargil (EPC Mode) (Under M-CADWM Scheme in UT Ladakh)
Construction of Bore well at Batdar Amberkhar Damhall Block Achabal, in District Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at Dawa Bagh Brariangan, In District Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at Brariangan Ward A-B, in District Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at Gursui Mohalla Vail nagbal Mohalla Block Mattan, In District Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at NHO Jabar Ahmad S/o Ab Rashid Cheer pora Mohalla Rakhi Brah Shangus, In District Ananatnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at Sadia Pansalpora Syed Mohalla Vailnagbal, in District Anantnag.
Construction of Bore well at AraKhoshipora Block Shshabad NLO Mohd Yousuf Wani and Others, in District Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at Village Ganigund Bakerwan Mohalla Block Mattan, In district Anantnag.
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at NHO Master Mohammad Yousuf Dhamabal RakhiBrah Ward No 7, in District Anantnag.
Annual Rate Contract for providing Household Service Connections( HSCs) including one Year Defect Liability Period in UWSS Pindwara Recieved by Jal Mitra
Annual Rate Contract for construction Commissioning of 150mm diameter tube wells at Block Khandela under the jurisdiction of Division Khandela Two year defect Liability period
Construction of distribution system of Wani Mohalla Hayan with water connection to H O Mohammad Akbar Zargar under CDF
Balance work under JJM at Village Umri Block Panna based on TW. i.c pipeline, OHT, Sump well etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Works related to repairing of Hand pump under Sub Division Sirohi
NIT NO 14/2026-27 Work for Shifting and new laying of old and deep polluted 200mm DI rising main pipe line between Phardod pump house to Borwa ESR
Construction of Mobile Van Shed at the premises of Jhargram Division Office, PHE Dte.
Construction of switch room for bulk consumer connection of WBSEDCL at Jhargram PHE office campus within Jhargram Division PHE Dte.
Re-Laying of damaged pipeline over existing causeway at Ch 18.00 Kmp on Parihati-Jamboni-Fekoghat Road(SH-9) pipe water supply scheme for Tulibor and its adjoining mouzas PWSS within Jamboni Block under Jhargram Division PHE Dte.
Re Laying pipe across the culvert at different places on the road Parihati-Jamboni-Fekoghat within Jamboni Block under Jhargram Division, PHE Dte
Repair to worn-out components of 10000 GPH x 150 meter head HC pump set along with allied works at pumping station Gangera
Repair to worn-out components of 10000 GPH x 150 meter head HC pump set along with allied works at pumping station Ramnagar stage-0.
supply, errection, Testing and Commissioning of Air Blower and 2 Nos. Sludge Motor pump 7.50 HP
Work Of Providing, Laying, Jointing, Testing and Commissioning of Pipeline for Drinking Water Supply in Municipal Area of Baswa, District Dausa including 05 year O and M after completion of one year defect liability period, Under BA
Repairing and relaying of damaged pipelines at Pipulbaria area under Anandapur PWSS.
Relaying of pipelines at Gobindapur area under Karimpur Jalangi Zone-XB PWSS damaged due to construction of cement concrete road
Relaying of pipeline damaged due to construction of drain by Tehatta Gram Panchayat at Tehatta Mouza of Tehatta PWSS
Upkeepment of Office campus and gardening work for the office of the Executive Engineer, Northern Mechanical Division, PHE Dte
Work of construction of 200mm diameter tube wells in all strata supply and installation of submersible pump sets and other allied works as per financial offer testing commissioning with 2 year defect liability period under PHED Division Alwar
Work of Removal Polluted Water supply under PHED City Sub Division Gangapur City