Loading…
Loading…
19,421 results • Latest
Day to day valve operation for different PWSS Zones under Bishnupur-II Block under Surface Water Based Water Supply Scheme for Arsenic Affected Areas of South 24-Pgs. District. For 01 year
Deployment of 05(five) nos. Security Guard without arm for Guarding Arrangement of office cum Store at HOOGHLY DIVISION and CHINSURAH SUB-DIVISION OFFICE under Chinsurah Sub-Division, under Hooghly Division, P.H.E Dte.
Day to day Valve operation for different PWSS Zones under Thakurpukur Maheshtala Block under Surface Water Based Water Supply Scheme for Arsenic Affected Areas of South 24-Pgs. District. For 01 year
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.16)
Operation and Maintenance of Centrifugal Sludge pump andother accessories of Main sewerage pumping station at Berhampore under G.A.P. Ph-I in the dist. Of Murshidabad.
Operation and guarding of Low lift pumping station at Lalbag GAP (Ph.-II) under MEDB, PHE Dte. in the District of Murshidabad
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at P.H. No. I and II under CHAR MAHULA W/S Scheme, Block-BERHAMPORE through Auto Motor Starter Panel at P.H. No. I AND II under of Faridpur W/S Scheme, Bloc
Day to day Operation and guarding of the pumping machinery through Auto Motor Starter Panel at ZONE I P.H. No. I, II ,III AND ZONE II P.H. No.HIGH LIFT , I, II AND ZONE III P.H. No. I, II under RAMNACHANDPUR W/S Scheme, Block NAWDA and through Au
WORK FOR MAINTANACE OF RWSS UNDER JEN SECTION-REODAR UNDER SUB DIVISION-REODAR
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.15)
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at ZONE I P.H. No. I and II, ZONE II P.H. No. I and II under MAHALANDI W/S Scheme,Block-KANDI , ZONE I P.H. No. I and II under Godhanpara W/S Scheme, Bloc
flow meter along
Annual Rate Contract for providing Household Service Connection HSCs including one Year Defect Liability Period under the Jrisdiction of City Dn. Barmer
REGULAR MAINTENANCE, GREASING, CHLORINATION, WATER SAMPLE COLLECTION AND OTHER ALLIED MAINTENANCE WORKS OF HANDPUMPS OF VILLAGES IN CHHEGAON MAKHAN BLOCK OF KHANDWA DISTRICT FOR 1 YEARS
Maintenance of distribution system of pipeline (MS/DI) from 350 mm to 150 mm within Chingripota GP and maintenance of Raising Main connecting Nandarampur, Atmarampur, Uttar Roypur, Betuabati, Buita, Jamalpur, Moukhali and Nischintapur OHR zone with
Operation and Maintenance of Iron Elimination Plant at Matiagacha W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. (For 365 Days)
Supply of chemical, glassware items for day to day water quality testing programs at Begampur Sub-District Laboratory in Baruipur Sub-Division under South 24-Parganas Water Supply Division-I, PHE Dte.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II under Kankuria -Jafrabad W/S Scheme, Dist-Murshidabad.
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.13)
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel for Jangipur S/D Hospital piped water supply scheme ,P.H. No.-III under PHE Dte. in the District of Murshidabad.
REGULAR MAINTENANCE, GREASING, CHLORINATION, WATER SAMPLE COLLECTION AND OTHER ALLIED MAINTENANCE WORKS OF HANDPUMPS OF VILLAGES IN PANDHANA BLOCK OF KHANDWA DISTRICT FOR 1 YEARS
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. I under Kankuria -Jafrabad W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. II, Zone-I under Tenya W/S Scheme, Dist-Murshidabad.
WORK FOR MAINTANACE OF RWSS ABUROAD UNDER SUB DIVISION ABUROAD
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. II, Zone-I under Sarbangapur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II under Katlamari W/S Scheme, Dist-Murshidabad.
Cleaning of Dug Wells, GSR,s and OHT including face-lifting under various WSS in Pargwal under District Capex Budget
Supply_delivery_and_replacement_of_electrical_items_of_VCB_Transformer_LT_and_ATS_Panel_at_Kamalnagar_12.09_MLD_WTP_of_Surface_based_W_S_Scheme_Purbasthali_II_Block_in_the_district_of_Purba_Bardhaman_under_Central_Mechanical_Division_PHE_Dte
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.12)
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. III , Zone-I under Saktipur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. I under Saikhpara W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II , Zone-I under Saktipur W/S Scheme, Dist-Murshidabad.
Construction of collection tank at source of WSS Bhoom Kullian in Block Kharah Balli under District Capex Budget
Supply_and_delivery_of_PET_Preform_Single_piece_Closure_Shrink_Film_and_other_consumable_materials_for_Kamalnagar_Bottling_Plant_under_CMD_PHE_Dte_Dist_Purba_Bardhaman
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. IV under Shibnagar-Laskarpur W/S Scheme, Dist-Murshidabad.
Protection work to newly constructed Tube Well building at Chaprial Block Samwan by providing crates revetment in under District Capex Budget
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. I , Zone-I under Saktipur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. II under Shibnagar-Laskarpur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II , Zone-II under Saktipur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. II under Purusattampur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. I , Zone-II under Saktipur W/S Scheme, Dist-Murshidabad.
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Haripal Block at Chandanagar Sub-Division under Hooghly Division, P.H.E. Dte. , Cluster-13.
Operation and Maintenance of Iron Elimination Plant at Ashudi W/S Scheme under Bongaon Sub-Division, P.H.E. Dte. (For 365 Days)
Supply_and_Installation_of_Submersible_Pumping_Machinery__Voltage_Stabilizer__Chlorination_System_and_Internal_House_Wiring_for_Tube_well_No__3_at_SONAIMA_Water_Supply_Scheme__BLOCK__AUSGRAM_II__under_CMD__PHE_Dte___Dist___Purba_Bardhaman_
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II under Narasinghapur W/S Scheme, Dist-Murshidabad.
A/Mtc. Sewerage Scheme Narnaul Town, District Mohindergarh for the year 2026-27-
Day to day Operation and guarding of the pumping machinery through Automatic Motor Starter Panel at P.H. No. I under Purusattampur W/S Scheme, Dist-Murshidabad.
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. II under Mithipur W/S Scheme, Dist-Murshidabad.
Sinking of250x200mm.dia.150m.deepTubeWellby DRRig methodusing UPVC pipe(CD)andUPVC deep Well Screen (RDS)underCentral Circle,PHE.DTE.(1 No.)at Bolgona RailwayPar,PumpHouse at beside mirickpara ICDS,Laying of RisingMaing,DistributionHW at Bolgona PWSS
Day to day Operation and guarding of the pumping machinery through Manual Motor Starter Panel at P.H. No. I under Mithipur W/S Scheme, Dist-Murshidabad.