Loading…
Loading…
10,461 live6,578 closing this weekmost from PWD and Public Works Department
10,461 results • Latest
Internal White Wash/Painting work of Govt. Resi. Qtrs. in Section No. 20 under RTC Sub Division, PWD Bhopal
AR WORK OF WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. J.A.H. CAMPUS MEDICAL-2 SECTION UNDER H.Q.1 SUB DIVISION GWALIOR
WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. H.Q. SECTION THATIPUR UNDER C-1 SUB DIVISION GWALIOR
REPAIRING OF NALA AND COVERING OF NALA WITH R.C.C. SLAB AT AYURVEDIC COLLEGE CAMPUS GWALIOR (DEPOSIT WORK)
Construction of Sukli Via Panwadi to Sukliya road length 12.20 km PAC RS.1431.12 LACS Second call on Road and Bridge SOR wef 11-04-2025 Work Period 540 days i/c rainy season
AR WORK OF WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. SCIENCE COLLEGE SECTION UNDER H.Q.1 SUB DIVISION GWALIOR
CONSTRUCTION OF ROAD FROM HOUSING BOARD COLONY KATARA HILLS (RAMESHWARAM, GAYTRI VIHAR, NANDGOAN, PAVEL WAY ) ROAD (LENGTH 2.50KM.) PAC RS. 754.21 LACS First call on Road and Bridge SOR wef 11-04-2025 Work Period 365 days i/c rainy season
CONSTRUCTION OF BOUNDARY WALL AROUND PARK AT GOVT. V.R. GIRLS COLLEGE MORAR GWALIOR (DEPOSIT WORK) UNDER H.Q.1 SUB DIVISION GWALIOR
AR WORK OF WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. TIGHRA AND KULETH SECTION UNDER C-1 SUB DIVISION GWALIOR
Internal White Wash/Painting work of Govt. Resi. Qtrs. in Section No. 16 under RTC Sub Division, PWD Bhopal
Teelakhedi , Dehariyakala, Jhagariya Sarvar Road Length 4.70 Km PAC RS. 566.66 LACS First call on Road and Bridge SOR wef 11-04-2025 Work Period 365 days i/c rainy season
AR WORK OF WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. J.A.H. CAMPUS MEDICAL-1 SECTION UNDER H.Q.1 SUB DIVISION GWALIOR
PLASTERING, FLOORING AND OTHER MISC. WORK IN M-BLOCK SECTION THATIPURA UNDER H.Q.2 SUB DIVISION GWALIOR
WHITE WASH COLOUR WASH, DISTEMPRING, PAINTING AND OTHER MANTINANCE WORK AT R.B. FORT SECTION UNDER H.Q.1 SUB DIVISION GWALIOR
WHITE WASH COLOUR WASH AND OTHER MANTINANCE WORK AT R.B. PARK HOTEL SECTION UNDER H.Q.2 SUB DIVISION GWALIOR
Construction of Tarasewaniya, Guradia, Khejda Dev, Manikhedi Kot, Bhopal Length-9.00 K.M. PAC RS. 1260.07 LACS First call on Road and Bridge SOR wef 11-04-2025 Work Period 365 days i/c rainy season
CONSTRUCTION OF ROAD FROM VIRASHA HEIGHTS TO BAWADIYA CHOURAHA ROAD (LENGTH 1.50KM.) PAC RS. 732.21 LACS First call on Road and Bridge SOR wef 11-04-2025 Work Period 365 days i/c rainy season
Internal White Wash/Painting work of Govt. Resi. Qtrs. at Mahalaxmi Parisor in Section No. 20 under RTC Sub Division, PWD Bhopal
WHITE WASH COLOUR WASH AND OTHER MANTINANCE WORK AT R.B. NORTH AND EAST SECTION UNDER H.Q.2 SUB DIVISION GWALIOR
REPAIRING AND MANTINANCE WORK AT R.B. H.Q. SECTION THATIPUR UNDER C-1 SUB DIVISION GWALIOR
All Inclusive AMC of Uninterrupted Power Supply e.g 1KVA,3KVA,6KVA and 40 KVA etc installed at Different Office Buildings at Kolkata and Howrah
W/W, C/W AND PAINTING WORK OF RESIDENTIAL BUILDING UNDER SUB DIVISION PICHHORE
STRENGTHENING OF JHALARAIYA DHURERI ROAD (TOTAL LENGTH 3.6 KM)
A.R./S.R./M.O.W. WORK OF ADMINISTRATIVE OFFICER RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 02 SHIVPURI
Widening and Strengthening work of Kakarait Pipardaha via Kandava Road (Chainage 0.000 to 5.000) Including 5 years Maintenance
STRENGTHENING OF BAGODA MEMDI SIMROL MARG (3.51 KM). HARSOLA APPROACH ROAD (1.85 KM). MHOW BHAGORA KALAKUND ROAD (0.90 KM). TOTAL PROPOSED LENGTH (6.26 KM).
MAINTENANCE AND RENOVATION WORK OF JUDGES RESIDENTIAL BUILDING SECTION SHIVPURI AND KARERA UNDER SUB DIVISION NO. 02 SHIVPURI
STRENGTHENING OF CHAIDIPURA, ROLLAY, RAMPURIYA APPROACH ROAD (TOTAL LENGTH 2.90 KM)
MAINTENANCE AND RENOVATION WORK OF JUDGES NON-RESIDENTIAL BUILDING SECTION POHARI AND KOLARAS UNDER SUB DIVISION NO. 01 SHIVPURI
MAINTENANCE AND RENOVATION WORK OF JUDGES RESIDENTIAL BUILDING SECTION PICHHORE AND KHANIYADHANA UNDER SUB DIVISION PICHHORE
Upgradation of 03 Nos Operation Theatres as Ductless Modular OTs in Pediatrics Surgery at SMGS Hospital, Jammu
STRENGTHENING OF SANGHVI APPROACH ROAD (TOTAL LENGTH 3.70 KM)
STRENGTHENING OF OSROD, BETMA SALAMPUR INAYATPURA, BISNAWADA RIJLAI APPROACH RROADS (TOTAL LENGTH 4.74 KM)
STRENGTHENING OF MHOWGAON BHATKHEDI ROAD (2.69 KM). NAHAR KHODRA CHASYA SHERKUND GOKLYA MARG (1.60 KM). KELOD NANDLAI ROAD (2.00 KM). BALAJI MANDIR APPROACH ROAD (0.50 KM). AND VISHWASNAGAR APPROACH ROAD (0.85 KM). TOTAL PROPOSED LENGTH (7.64 KM)
W/W, C/W AND PAINTING WORK OF RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 01 SHIVPURI
W/W, C/W AND PAINTING WORK OF NON-RESIDENTIAL BUILDING UNDER DIVISION SHIVPURI
MAINTENANCE AND RENOVATION WORK OF JUDGES NON-RESIDENTIAL BUILDING SECTION PICHHORE AND KHANIYADHANA UNDER SUB DIVISION PICHHORE
MAINTENANCE AND RENOVATION WORK OF JUDGES RESIDENTIAL BUILDING SECTION POHARI AND KOLARAS UNDER SUB DIVISION NO. 01 SHIVPURI
Comprehensive Servicing and Maintenance of 4 Nos. Kone Make 13 Persons passenger lifts and 1 No. Kone make 20 Persons lifts in New C type NC-1 (190 Nos.) Quarters at Todhunter Nagar, Saidapet, Chennai-15 for the year 2026-2027 From October 2026 to
MAINTENANCE AND RENOVATION WORK OF JUDGES NON-RESIDENTIAL BUILDING SECTION SHIVPURI AND KARERA UNDER SUB DIVISION NO. 02 SHIVPURI
W/W, C/W AND PAINTING WORK OF RESIDENTIAL BUILDING UNDER SUB DIVISION NO. 02 SHIVPURI
Construction of Various Missing Link Roads under Pkg No. RJ-29-27/ML/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt Sikar
Renewal of Various Non Patchable Roads under pkg. No. RJ-29-16/NP/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt. Sikar
Renewal of Various Non Patchable Roads under pkg. No. RJ-29-17/NP/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt. Sikar
Construction of Various Missing Link Roads under Pkg No. RJ-29-29/ML/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt Sikar
Construction of Various Missing Link Roads under Pkg No. RJ-29-28/ML/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt Sikar
Construction of Various Missing Link Roads under Pkg No. RJ-29-26/ML/SKR/LXGH/ 2026-27 under Dn Laxmangarh Distt Sikar
Construction of road Nh-28 to saraiya via Ambedkartola haraiyan link Road - Length 2-20 km including 5-year maintenance- Lot No 17 of 19
Construction of Sariya Nahar Puliya to Semari house of Ram Daras Chauhan Link Road - Length 1-50 km including 5-year maintenance- Lot No 6 of 19
Construction of padar to Nibahi link road via narkatiya mata sthan in Vikas Khand Brahmpur - Length 3-70 km including 5-year maintenance- Lot No 13 of 19