Loading…
Loading…
10,461 live6,578 closing this weekmost from PWD and Public Works Department
10,461 results • Latest
Construction of Pich Road in Bhaluan Village to Kharhari Tola link Road - Length 1-50 km including 5-year maintenance- Lot No 8 of 19
Construction of Matiyara Tuble To bhaksa Chadrao West link road - Length 1-20 km including 5-year maintenance- Lot No 2 of 19
Construction of nausad kalani bandha to panchayat bhawan pipri link road - Length 1-30 km including 5-year maintenance- Lot No 16 of 19
Construction of Mahuadabar Girls School to Rampur Maloli Link Road- Length 1-50 km including 5-year maintenance- Lot No 5 of 19
Construction of Khajni Main Road Khanipur Chauraha to house of Pappu Pal via House of Ramashanker Singh Link Road - Length 1-35 km including 5-year maintenance- Lot No 3 of 19
Construction of Primary School Darba to Alagatpur Puliya Link Road Length 1-00 km including 5-year maintenance- Lot No 1 of 19
Construction of Manjhariya bistol anusuthik to jharna via angabadi kendra chakkia tola link road- Length 2-50 km including 5-year maintenance- Lot No 18 of 19
Construction of village Punraha to pakadihar to Thakurai mundera link road- Length 4-00 km including 5-year maintenance- Lot No 10 of 19
Construction of jungal mathiya road to primary school bhauapar link road - Length 1-65 km including 5-year maintenance- Lot No 14 of 19
Construction of a link road from Kali Mata Ji Temple in Gram Panchayat Bhadsar to Bajrang Bali Temple - Length 1-35 km including 5-year maintenance- Lot No 4 of 19
Construction of Rajdhani Main Road to Amahiya HP Verma School Link Road - Length 2-20 km including 5-year maintenance- Lot No 9 of 19
Construction of Ahiroli patkholi underpass link road - Length 2-10 km including 5-year maintenance- Lot No 19 of 19
Construction of Khutahan-Khajni Road to Basdila Mod Rampur via Muktinath Seths house Link Road - Length 1-00 km including 5-year maintenance- Lot No 7 of 19
Construction of Kamlesh Sharma house in village karmaha Situted At Phutahwa Sonbarsa Road to Railway Bridge Link Road in Vikas Khand Sardarnagar - Length 1-80 km including 5-year maintenance- Lot No 11 of 19
construction of 70 M span actual 100 m at site motorable bridge including approach road from Dhandani to Thichka via Owain
Construction of Road and Rapta at Dangipar Mirjapur ODR to Vinod Ramanand House in Hakkabad - Length 2-50 km including 5-year maintenance- Lot No 15 of 19
Construction of Rampur-Rakba Road km-2 to Gularband via Nishad tola Link Road - Length 1-20 km including 5-year maintenance- Lot No 12 of 19
Remodeling of damaged building of MS Block at Govt.HS Damjan.
ROUND TABLES, ROOM CHAIRS, Matress, MATTRESSES 75X72 EP+ FOAM 5", MATTRESESS 75X72 BONDED FOAM 4", LED TV PANELS, PUFFIES, PARTITION SCREEN, DINING SET (6 Seater), DINING SET ( 4 Seater), SOFA 1-SEATER, Dining Chair For Dining Tables, Bed Side Tables, DRESSING MIRROR ALMIRAH, Modular Table With Iron Frame 2.50 X 5.50, Modular Table With Iron Frame 2.50 X 5.0, Modular Table With Iron Frame 2.50 X 2.50, Modular Table With Iron Frame 3.00 X 4.00, Modular Table With Iron Frame 3.00 X 3.00, PEG TABLES, CENTRE TABLE
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))
Construction of Missing Link and Non Patchable Roads under Package No RJ-15-16/ML&ampNP/2026-27 under Circle Hanumangarh
Construction of Shettru Sidaappa Govt PU collage at Ajjampura Chikkamagaluru District
11 KV line, 11 KV DP Line, 11 KV X-Mer DP Line, LT Line Shifting & Electrification Work Under Ongoing Proposed Road widening work of Sandi To Keshla Road Dist.-Baloda-Bazar (C.G.)
a1 Annual maintenance of Nagaragali-Katakol (SH-138) from km 45.34 to 48.15, km 49.75 to 50.65 and (2) Annual maintenance of NH-4A Kamataga (SH-56) Connecting Alagawadi (SH-N21) from km 49.26 to 52.93, km 54.19 to 58.525, km 58.85 to 64.90, km 65.01 to 69.81, km 73.41 to 76.11 in Channammana Kittur Taluk of Belagavi District under the HOA 3054 SH Maintenance for the year 2026-27.
Annual maintenance to Yaragatti-Babaleshwar (SH-55) from Km 0.00 to 15.80 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 SH Maintenance for the year 2026-2027
Annual maintenance of Alnavar-Betageri (SH-140) from km 7.75 to 23.23, km 24.13 to 25.28, and km 26.20 to 38.45. in Channammana Kittur Taluk of Belagavi District under the HOA 3054 SH Maintenance for the year 2026-27.(Reserved for Category II A)
Annual maintenance of SH-30 (Sindhanur-Hemmadaga) from km 233.42 to 234.22 and km 235.22 to 252.33 in Channammana Kittur Taluk of Belagavi District under the HOA 3054 SH Maintenance for the year 2026-27.
33 KV line, 33 KV DP Line, 11 KV line, 11 KV DP Line, 11 KV X-Mer DP Line, LT Line Shifting & Electrification Work Under Ongoing Proposed Road widening work of Risda Bypass Road Dist.-Baloda-Bazar (C.G.)
Annual Maintenance For the year 2026 27 Betsur Daderkoppa Hirekumbi Road from Km 0.000 to 15.385 and Km 16.307 to 19.000 in Savadatti Taluk Belagavi District
Annual maintenance to Munavalli-Kotamachagi (SH-83) from Km 0.00 to 6.415 and Badami-Godachi-Gokak falls (SH-134) from Km 78.10 to 80.74 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 SH Maintenance for the year 2026-2027
Annual Maintenance of Nagaragali-Katakol Road (SH-138) from Km. 108.00 to 116.63 in Savadatti Yallamma Constituency of Belagavi District(reserved for ST only)
Annual maintenance of Gokak-Savadatti (SH-103) from Km 49.80 to 55.60 and from Km 60.702 to 64.325 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 SH Maintenance for the year 2026-2027
Annual Maintenance of Korakoppa-Itnal-Mugalihal Road from Km. 0.00 to 5.30 and from Km. 5.41 to 11.62 in Savadatti Taluk
Annual Maintenance to Nugganatti-Budigoppa- Yarazaravi-Bolakadabi road from Km. 0.00 to 4.40 and from Km. 4.50 to 4.845 and Km. 6.90 to 11.55 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 MDR Maintenance for the year 2026 27(RESERVED FOR CAT I)
1Annual maintenance of Kittur-Bassapura-Shigihalli-Ugarkhoda road (connecting to NH-4) from km 0.00 to 4.20, km 4.73 to 5.10 and (2) Annual maintenance of Mallapura-Turamuri road (via Dematti-Kotabagi) from km 6.51 to 12.00 in Kittur Taluk, Belagavi District,under the HOA 3054 MDR Maintenance for the year 2026-27.(reserved for Cat II A)
Annual Maintenance to Yaraganavi-Madamageri- Shivapur road from Km. 1.14 to 1.90 and from Km. 2.66 to 3.97 and from Km. 4.14 to 5.00 and Kadabi-Goraguddi- Goraguddi tota road from Km. 0.00 to 7.50 in Savadatti Yallamma Constituency of Belagavi Dist under HoA 3054 MDR Maintenance for the year 2026-2027(reserved for Cat II A)
Annual maintenance of the Beedi-Belavaniki SH 56 from km 6.91 to 15.05, km 17.23 to 19.03, and km 19.13 to 20.58 in Channamma Kittur Taluk of Belagavi District under the HOA 3054 SH Maintenance for the year 2026-27.
Annual maintenance of Inchal-Gothamar-Chachadi road km. 0.00 to 5.00 of Bailhongal constituency of Savadatti taluk for the year 2026-27 and Annual maintenance of Marakumbi-Chachadi road Via Harugoppa from km. 1.8 to 3.0 and from km. 5.6 to 8.8 of Bailhongal constituency of Savadatti taluk for the year 2026-27
Annual maintenance of Tenikolla-Malagali-Yarzarvi road from km. 0.00 to 3.00 and from km. 6.30 to km. 9.3 in Bailhongala constituency of Savadatti taluk for the year 2026-27
SITC of Automatic MRL type 16 (Sixteen) Passenger Lift at Proposed Gplus4 Storied Barrack Building in the office of the Special Branch, 15, Lord Sinha Road, Kolkata.
Repair of Potholes on Sodepur-Madhyamgram Road from ch.7.3 km to ch.8.03 km (Right Side) and ch. 8.75 km yo ch. 9.5 km (Both Side0 under Barrackpur Division during the year 2026-2027.
Providing staging arrangement for inspection of Madhyamgram ROB by Rites and Senior officials and replacement of defective rainwater pipes under Barrackpur Division during the year 2026-2027
Construction of C.C. Road From NH 86 to Karaiya Kheda road length 2.40 km.
Construction of Submersible Bridge Including Approach Road Across Chamla River Near Karadwas Village Including Electrical Pole Shifting District Ujjain
MOW/AR/SR/Anurakshan work of F Type Govt. Resi. Qtrs. in Section No. 17 under RTC Sub Division, PWD Bhopal
Construction of C.C. Road From Neemtal Chouk to Tilak Chouk, Mayur News Office to Bada Bazar road length 1.10 Km.
Construction of Submersible Bridge Including Approach Road Across Chambal River From Harnawada to Jahangeerpur Road District Ujjain
MOW/AR/SR/Anurakshan work of E Type Govt. Resi. Qtrs. in Section No. 17 under RTC Sub Division, PWD Bhopal
Construction of C.C. Road From Pooranpura Link Road No. 5 to Ahmadpur road length 1.50 km.
Construction of C.C. Road From Ramleela to Gallamandi Chouk via Bajrariya Chouk road length 1.60 km.